Guide Rails Chain Lift Platform
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 500 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
The following are the part types which we design and produce for our clients,
they are produced according to the clients' requirements.
Model | Table size(m) | Capacity (T) | Lifting height (m) | Power supply |
SJG2-5 | 1.75*1.2 | 2T | 5m | 380V/50HZ |
SJG5-3 | 3 * 2 | 5T | 3m | 380V/50HZ |
SJG1.5-4 | 2.5*1.5 | 1.5T | 4m | 380V/50HZ |
SJG4-4.4 | 2 * 1 | 4T | 4.4m | 220V/60HZ |
SJG2-11 | 5.5 * 2.2 | 2T | 11m | 5.5KW/380V |
SJG1.5-4 | 1.8 * 2 | 1.5T | 4m | 4KW/380V |
SJG0.7-0.95 | 0.95*0.8 | 0.7T | 0.95m | 2.2KW/380V |
SJG0.2-2.3 | 1.3*1.0 | 0.2T | 2.3m | 2.2KW/380V |
SJG3-2.3 | 1.6*1.4 | 3T | 2.3m | 2.2KW/380V |
SJG1-5 | 1.6*1.5 | 1T | 5m | 2.2KW/380V |
SJG2-6 | 2.0*2.0 | 2T | 6m | 4KW/380V |
SJG2-5 | 2.1*1.2 | 2T | 5m | 4KW/380V |
SJG3-6.5 | 2.2*1.9 | 3T | 6.5m | 5.5KW/380V |
SJG2-5 | 2.3*1.4 | 2T | 5m | 4KW/380V |
SJG2-5.15 | 2.3*1.44 | 2T | 5.15m | 4KW/380V |
SJG2-4 | 2.5*1.5 | 2T | 4m | 4KW/380V |
SJG2-4 | 2.5*1.5 | 2T | 4m | 4KW/380V |
SJG2-9 | 2.5*2.0 | 2T | 7.5m | 4KW/380V |
SJG1.5-7.9 | 2.6*2.0 | 1.5T | 7.9m | 4KW/380V |
SJG2-5.4 | 2.9*2.0 | 2T | 5.4m | 4KW/380V |
SJG2-4 | 3.0*1.6 | 2T | 4m | 4KW/380V |
SJG2-4.5 | 3.0*2.5 | 2T | 4.5m | 3KW/380V |
SJG3-4.5 | 4.3*2.8 | 3T | 3m | 5.5KW/380V |
SJG1.5-8.5 | 2.25 *1.6 | 1.5T | 8.5m | 4KW/380V |
........ | .................. | |||
Note: the Guide rails lift platform is mainly designed and produced as clients' requirements. please tell us your requirements, mainly include the capacity, table size & lifting height so that we can design and give quotation.
- Q: Construction; basket; detection proportion
- Hello, height operation basket also belongs to construction hoisting machinery. "Construction crane safety inspection procedures" refers to the construction of lifting machinery, refers to the housing construction sites and municipal engineering sites used tower cranes, construction lifts and high operating basket. Therefore, in accordance with the requirements of the construction, lifting equipment installation, must be commissioned by qualified units for testing and acceptance. According to the regulations, the height hanging basket is the same as the tower crane and the construction elevator. Before installation, it must be checked and accepted before being put into use
- Q: How to use an electric basket properly?
- 2, more than the safety lock calibration period should be promptly sent back to manufacturers and re calibration overhaul, the calibration for a period of 1 years.
- Q: Who knows the construction basket reported those information?
- 1., basket mounting and dismantling units of enterprise business license, enterprise qualification certificate, project manager post certificate and safety assessment B certificate, security personnel safety assessment C certificate; special work certificate;
- Q: High altitude hanging basket in construction, sudden power failure, emergency measures
- The faulty hoist must be overhauled before it can be put into use. At one end of the rope breaking safe lock, lock the safety rope, must be professional maintenance personnel for risk. In the risk process, we must pay special attention to action to light, smooth, avoid hot galvanized electric basket safety lock suffered a major impact accident. When the nacelle is repaired and disassembled, the power supply must be cut off first, and the warning signs of "maintenance forbidden" and "demolition and disable" are set up in the marked position, and special personnel are put in charge
- Q: How about the sudden suspension of aerial homework basket?
- . 6) release the front bracket and remove the counterweight from the rear support. 7) put all the disassembled parts in the prescribed place and prepare them to be transported to the ground. 8) demolition hoist, safety lock and side basket, basket plate bolts to collect good disintegration, remove the. 9) the parts of the platform and the components of the suspension system are centrally placed in the prescribed place and ready for loading and unloading.
- Q: The ratio of the maximum overturning moment of the overturning moment and the rated load capacity of the suspension platform to the center of the overhang of the suspension platform shall not be less than that of the suspension platform
- In the history of human civilization for thousands of years, for a long period of time, the material means of building houses have been limited to simple masonry of primitive materials, so the houses are low and almost flat along the ground surface. Over the past hundred years, with the development of economy and technology, gradually building into the air, although the name of the building appeared for a short time, but the development speed is very fast, especially in the past 20 years, every kind of buildings, all over the world stood up, the scale, the number of technology advanced modeling chic. At the same time led the electric basket industry's rapid development.
- Q: What are the structural components of an electric gondola?
- The basket by the suspension mechanism, suspension platform, hoist, safety lock, steel wire rope, wire rope and electric box and electrical control system for main parts. For the convenience of transportation and transportation, the products are broken down by parts or groups and parts when they are transported out of the factory and assembled into the whole machine after the construction site. The suspension mechanism is installed on the top of the building work at the supports, a steel wire rope to steel structure under suspension platform, rated load weight, (see Figure two: suspension mechanism) were using two sets of suspension mechanism.
- Q: Kind of basket flower, how to raise?
- The soil matrix Chlorophytum adaptability, easy cultivation. The available fertile sandy loam soil, humus soil, peat soil, or fine sand and a small amount of fertilizer for potting soil. Reproduction is usually done by ramets, except for low temperatures in winter and unsuitable for ramets, which can be carried out in other seasons. Can cut stalks with root potted seedlings.
- Q: How much is the basket length of the hanging basket?
- 6 meters or 7.5 meters. Is currently the most common configuration, there are three main equipments: A, ZLP630, rated load is 630KG, the working platform length is 6 meters (assembled, according to different requirements, free combination) is mainly suitable for exterior paint, repair, cleaning and other low load operation amount.
- Q: How much money one day rental basket
- The rent has now transparent basket, unless the standard requirements and special construction environment is difficult, the general term of three months rent by 50 to 70 yuan / day, plus installation and disassembly fee (according to the site environment and the height and the auxiliary facilities set), freight by distance meter, according to the amount of testing fee by region. One month per month, 5 dry basis, two monthly, 7 thousand base
Send your message to us
Guide Rails Chain Lift Platform
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 500 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords