Guide Rails Chain Lift Platform
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 500 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
The following are the part types which we design and produce for our clients,
they are produced according to the clients' requirements.
Model | Table size(m) | Capacity (T) | Lifting height (m) | Power supply |
SJG2-5 | 1.75*1.2 | 2T | 5m | 380V/50HZ |
SJG5-3 | 3 * 2 | 5T | 3m | 380V/50HZ |
SJG1.5-4 | 2.5*1.5 | 1.5T | 4m | 380V/50HZ |
SJG4-4.4 | 2 * 1 | 4T | 4.4m | 220V/60HZ |
SJG2-11 | 5.5 * 2.2 | 2T | 11m | 5.5KW/380V |
SJG1.5-4 | 1.8 * 2 | 1.5T | 4m | 4KW/380V |
SJG0.7-0.95 | 0.95*0.8 | 0.7T | 0.95m | 2.2KW/380V |
SJG0.2-2.3 | 1.3*1.0 | 0.2T | 2.3m | 2.2KW/380V |
SJG3-2.3 | 1.6*1.4 | 3T | 2.3m | 2.2KW/380V |
SJG1-5 | 1.6*1.5 | 1T | 5m | 2.2KW/380V |
SJG2-6 | 2.0*2.0 | 2T | 6m | 4KW/380V |
SJG2-5 | 2.1*1.2 | 2T | 5m | 4KW/380V |
SJG3-6.5 | 2.2*1.9 | 3T | 6.5m | 5.5KW/380V |
SJG2-5 | 2.3*1.4 | 2T | 5m | 4KW/380V |
SJG2-5.15 | 2.3*1.44 | 2T | 5.15m | 4KW/380V |
SJG2-4 | 2.5*1.5 | 2T | 4m | 4KW/380V |
SJG2-4 | 2.5*1.5 | 2T | 4m | 4KW/380V |
SJG2-9 | 2.5*2.0 | 2T | 7.5m | 4KW/380V |
SJG1.5-7.9 | 2.6*2.0 | 1.5T | 7.9m | 4KW/380V |
SJG2-5.4 | 2.9*2.0 | 2T | 5.4m | 4KW/380V |
SJG2-4 | 3.0*1.6 | 2T | 4m | 4KW/380V |
SJG2-4.5 | 3.0*2.5 | 2T | 4.5m | 3KW/380V |
SJG3-4.5 | 4.3*2.8 | 3T | 3m | 5.5KW/380V |
SJG1.5-8.5 | 2.25 *1.6 | 1.5T | 8.5m | 4KW/380V |
........ | .................. | |||
Note: the Guide rails lift platform is mainly designed and produced as clients' requirements. please tell us your requirements, mainly include the capacity, table size & lifting height so that we can design and give quotation.
- Q: Who has a good way to clean the basket and the basket?
- 1, timely removal of electric basket, hoist table full and dirt on the work wire rope, to avoid lifting machine into, out of the mouth, into the debris, damage to the machine parts. Note that there is no sound or smell, after work cover, to avoid rain, debris and other intrusion. Avoid collision during installation, transportation and use so as to avoid damage to the casing.
- Q: Tianjin building more than meters, not allowed to use hanging basket construction
- If it is still not permitted, it may be used in the form of exterior wall materials, such as rail cranes, launch vehicles, etc..
- Q: Construction; basket; detection proportion
- Hello, height operation basket also belongs to construction hoisting machinery. "Construction crane safety inspection procedures" refers to the construction of lifting machinery, refers to the housing construction sites and municipal engineering sites used tower cranes, construction lifts and high operating basket. Therefore, in accordance with the requirements of the construction, lifting equipment installation, must be commissioned by qualified units for testing and acceptance. According to the regulations, the height hanging basket is the same as the tower crane and the construction elevator. Before installation, it must be checked and accepted before being put into use
- Q: Construction basket operation certificate is not able to operate?
- 6, support should be used before the lifter and platform is connected firmly, the safety rope and the safety lock connection is reliable, the action is normal, the suspension wire node is reliable, the connecting bolt, pin is loose, the suspension mechanism of the node and the wire rope weight is normal and reliable and various limiting device is sensitive and reliable to check and acceptance, and to strengthen the daily inspection, repair and maintenance.
- Q: Decoration engineering, external wall hanging basket to do information? What type of data?
- Not because the basket in the city there is a record can be omitted, and this is two different things, if it does not put in the city records, it is not allowed to use at the site. As for who is, should be a security officer, to help the information clerk to get it, a person trouble. Ha-ha
- Q: What kind of aptitude does ZLp overhead job basket use?
- Two, basket mounting qualification (such as: lifting machinery qualification three or more, ABC, three categories, security, construction, electricians and other personnel, etc.)
- Q: Is the overhead hanging basket a building lifting equipment?
- Overhead work baskets are not building lifting equipment. It's a removable scaffolding. 1 construction lifting equipment refers to the construction of the construction site for the use of car cranes, cranes, Longmen racks, winches and materials elevator. Building lifting equipment is mainly vertical transport construction materials, construction machinery, prefabricated parts, safety protection materials. Although the height hanging basket has the integral lifting function, it is not for the vertical transportation material.
- Q: High altitude hanging basket in construction, sudden power failure, emergency measures
- Hot dip galvanized electric basket in the lifting process, if the suspension platform tilt angle will cause the safety lock, automatic lock rope, you should promptly turn the switch point, hoist moving one side of the platform, the platform is close to the level of the state, the safety lock open after normal operation recovery. When the work rope is suddenly stuck on the hoist, it must stop immediately. It is strictly prohibited to use repeated ascending and descending operations to forcibly eliminate danger. The operating personnel from the suspension platform under the premise of ensuring safety, and inform professional maintenance personnel to enter the suspension platform for risk.
- Q: What are the basic components of the overhead hanging basket?
- Gondola structure: the structure is divided into three parts: suspension platform, wire rope, sling suspension platform containing platform, elevator, safety lock and limit switch, the control box containing suspension frame, weight lifter
- Q: What are the structural components of an electric gondola?
- The mounting frame is welded by a steel tube, and the bottom can be provided with casters, which is convenient for dismounting and moving during operation. The front railing and rear rail of the platform are welded by steel (aluminum) pipe, the front rail is 970mm, and the installation is on the side of the operation area, and the height of the rear rail is 1120mm. ZLP800 for elevator type LTD80, hoist by electromagnetic brake motor, centrifugal speed limit position, two speed system and the rope rolling mechanism, enhance the level second machine deceleration for gear transmission, the structure in figure 6:ZLP800 for elevator structure diagram (deceleration part). The hoist rope coiling mechanism S "form, the structure shown in figure 7:ZLP800 for elevator structure (rope part) ZLP800A, ZLP630, ZLP500 for elevator models were LTD80A, LTD63 and LTD50, three kinds of hoist structure is basically the same, by electric magnetic system alpha motor centrifugal speed limiting device and two stage deceleration system and" alpha "in the form of a rope coiling mechanism etc.. Details of the structure are shown in figures 8:ZLP800A, ZLP630 and ZLP500. The lifting machine has automatic rope feeding function, and the operator only needs to insert the work rope into the entrance of the hoist.
Send your message to us
Guide Rails Chain Lift Platform
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 500 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords