• Formwork Parts Plate Nut with Black Or Painting by Casting System 1
  • Formwork Parts Plate Nut with Black Or Painting by Casting System 2
Formwork Parts Plate Nut with Black Or Painting by Casting

Formwork Parts Plate Nut with Black Or Painting by Casting

Ref Price:
$0.95 / kg get latest price
Loading Port:
Tianjin
Payment Terms:
TT or LC
Min Order Qty:
1000 kg
Supply Capability:
1000 kg/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

1.Structure of Formwork Parts Casted Plate Nut with Painting or Black:

It is Formwork Parts called Plate Nut by Casted.

Packaging & Delivery

Packaging   Details:

cartons/pallets or customized

Delivery   Detail:

25-40   days


2. Formwork Parts Casted Plate Nut Products pictures:

Formwork Parts Plate Nut with Black Or Painting by Casting


3. Formwork parts Casted Plate Nut Specification:

1) Surface: Black Or Painting

2)Weight: 0.26 ~0.5KG

3) Samples are available


4.FAQ

 We have organized several common questions for our clients, may help you sincerely:

1) How is the Packaging Details?

In bags or as the requirement of customers.

2) How long can we receive the product after purchase?

Lead time is about 30days after getting the signed PI and deposit.

Q:What could you do with 100,000 jumbo cotton balls, 50 gallons of honey, and three story scaffolding?
Take them on the road-trip of course....we'll find some use for them along the way.....
Q:A 520 kg box sits 1.4 m from the left end. What is the tension in the right hand side wire? (g = 9.8 m/s2) ____________ Newtons
Because the scaffold is not moving, we can assume that the net Torque acting on the scaffold equals zero. Net Torque = 0 torque = Force x distance (d) Use the left end of the scaffold as the center point. This will eliminate the Torque caused by the left wire (d = 0, so torque = 0) There are now three forces creating torque on the scaffold. There is the weight (m x g) of the scaffold, at 3.5m from the left end. m1 x g x 3.5m There is the weight of the crate, located 1.4m from the left end: m2 x g x 1.4m These two torques are countered by the torque caused by the Tension (T) of the right wire, located 7m from the left side. T x 7m The sum of these torques is zero. (T x 7m) - (m1 x g x 3.5m) - (m2 x g x 1.4m) = zero solve for T T = ((m1 x g x 3.5m) + (m2 x g x 1.4m)) / 7m T = ((115kg x 9.8m/s^2 x 3.5m) + (520kg x 9.8m/s^2 x 1.4m)) = 1.58 x 10^3 N Hope this helps.
Q:According to the standard set up double scaffolding scaffolding to the number of meters per square meter
This is not necessarily the type you want to see the scaffold (open / closed) and set the height of the local wind.
Q:What does scaffold one's days mean? kill time?
In 60 years of using English in Britain I have not come across that expression, so it is probably rare. Scaffolding is put up to help build or repair tall buildings, so possibly that expression means 'to do something useful with one's time.' But a scaffold is also, historically, a place of execution (legal killing of prisoner), so the expression could mean indeed 'wasting time'. I have a faint feeling that 'scaffold one's days' was written by a non-native speaker of British English. It may be more common in the USA.
Q:I think that'd be extremely entertaining.
new jack dont want to work with wwe
Q:Are the terms quot;nuclear matrixquot; and quot;nuclear scaffoldquot; interchangeable? I know that when we talk about DNA compaction we say that MARs on the DNA attach to the nuclear scaffold. I am wondering if the scaffold is just a specific part of the matrix??
For most purposes, they are interchangeable terms for the same things. Some people favor one term, some the other. The ones who favor matrix over scaffold or vice versa may have some argument as to why it is better or a difference but in general people use them interchangeably.
Q:I sincerely ask you to help me, door scaffolding, build 30 meters high, without any reinforcement points of the construction program. Thanks, high marks!
The height of the erection of the steel pipe scaffold shall not exceed the provisions of this specification 1.0.3.The design and construction of the 1.0.4 door type steel pipe scaffold shall comply with the relevant provisions of the state and the relevant mandatory standards.
Q:Who has external scaffolding construction program
See the following table for permissible deviation of steel pipe:Item deviation check tool1 welded steel pipe size (mm) outer diameter 48Wall thickness 3.5-0.5 vernier caliperThe 2 ends of steel tube shear oblique deviation 1.7 feeler, corner rulerThe corrosion of 3 steel tube outer surface depth of less than 0.50 vernier caliper4 kinds of rod end bending L = 1.5m = 5, steel ruler5 pole bending 3m<l = 4m4m<l = 6.5m = 12Less than or equal to 20
Q:Scaffolding scaffolding erection norms which requirements, who can say?
Scaffolding operators must be qualified through the examination of professional personnel, should be held on the card and do a regular physical examination, the operator must wear a helmet, fasten the seat belt, wear non slipIn the process of using frame control load less than ZkN/mZ2kN/ square meters, the prohibition of arbitrary demolition wall connecting rod and other safety facilitiesEach component and frame tube of the cantilever frame must be transmitted to the ground in timeWhen the shelf is removed, a fence or warning sign should be set up around it, and someone should be assigned to guard itFasteners and steel pipe diameter matching use, and the factory certificate. It is found that there is crack, deformation, the prohibition of the use of silkThe erection of temporary power lines and the grounding of the suspension frame and the lightning protection measures shall be carried out according to the national standards
Q:What heights do u need a harness for(had to repost as didnt explain correctly in last 1)
OSHA says that you need guardrails, safety nets or a fall-arrest system if you're working or walking near an unprotected surface more than 6' above a lower level.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords