• Excavators With Long Boom (15M 18M SC220. SC330 SC360) System 1
  • Excavators With Long Boom (15M 18M SC220. SC330 SC360) System 2
  • Excavators With Long Boom (15M 18M SC220. SC330 SC360) System 3
  • Excavators With Long Boom (15M 18M SC220. SC330 SC360) System 4
  • Excavators With Long Boom (15M 18M SC220. SC330 SC360) System 5
Excavators With Long Boom (15M 18M SC220. SC330 SC360)

Excavators With Long Boom (15M 18M SC220. SC330 SC360)

Ref Price:
get latest price
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 set
Supply Capability:
200 set/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Excavators With Long Boom (15M 18M SC220. SC330 SC360)

Prolonged working device: The arm and boom of the excavator with prolonged working device are 15 m, and the bucket capacity is 0.3 m3. Based on the market research and technical demonstration, the structural strength, performance and quality are guaranteed from the material selection, technology, and design.

The boom has the interior cushion plate, which can bear the load, prolonging the service life of the excavator. The machine is mainly applicable to river dredging, slope grading, soil foundation and trench digging


Specification Excavators With Long Boom (15M 18M SC220. SC330 SC360)


Model NO.:15M 18M SC220. SC330 SC360

 

Drive Type:Hydraulic Drive

Bucket Capacity:1.0~1.5m³

 Transmission:Hydraulic Transmission

Type:Crawler Excavator

 Size:Large-Scale

Condition:New

 Certification:ISO9001: 2000

Export Markets:Global

Packing:Standard Export Packing

Origin:China

HS Code:84295212

Production Capacity:200 Units Per Month


Excavators With Long Boom (15M 18M SC220. SC330 SC360)

Excavators With Long Boom (15M 18M SC220. SC330 SC360)

Excavators With Long Boom (15M 18M SC220. SC330 SC360)

Excavators With Long Boom (15M 18M SC220. SC330 SC360)

Excavators With Long Boom (15M 18M SC220. SC330 SC360)

Excavators With Long Boom (15M 18M SC220. SC330 SC360)


Excavators With Long Boom (15M 18M SC220. SC330 SC360)

Excavators With Long Boom (15M 18M SC220. SC330 SC360)

Excavators With Long Boom (15M 18M SC220. SC330 SC360)


FAQ Excavators With Long Boom (15M 18M SC220. SC330 SC360):


1.How about the shipment?

1. The loader machine load one 40HQ container.

2. The loader disassemble into 3 parts, major machine, bucket and cabin.

3. Before shipment, we have done the rust-proof and antiseptic treatment.


2. What about your service?

We have our factory, we can meet customers needs as soon as possible.

We have first rate professional technology and provide good after-sales service.


3. What Can we Do For You?                                                                 

1. During the period of 12 months or 2000 working hours warranty, Chaogong factory are responsible for maintenance and replacement of spare parts.

2. We attend the machinery exhibition in your country and please contact us when we are with you at that time and solve the problem you have.

3. For the sole agents, we will go with senior engineer to your country and offer the technical service. 

Q: Which do you think is better? Intel is all about performance with not a care about power usage. AMD has decent performance, but their power saving is just phenomenal.
AMD FX 8-Core Processor Black Edition wayy better than intel
Q: i have three questions.the first situation is:person A plays somethingperson B plays an instant in RESPOND to person A's creatureQEUSTION : can person A play a SORCERY in RESPOND to person B's instant?the second question:what is the difference between the LEGEND rule and the PLANESWALKER rule?the third situation:person A plays halimar excavatorperson A then plays a jwari to put it in as a halimarperson B responds to the jwari and plays path to exile(halimar removed)person A plays another jwari in response to path to exilemy assumption is that the last jwari played will come in as a halimar, then the one on the field will be removed due to path to exile. then the first jwari played will come in as a halimar since there is a jwari(halimar) on the field.is this correct since the text of jwari says come in to play as any ally on the battle field? (not targeting any allies on the battlefield)
1. One of the restrictions of playing a sorcery is that the stack must be empty, so no. 2. If two or more legends with the same name are in play, they all go to their owners' graveyards. If two or more planeswalkers with the same subtype are in play, they all go to their owners' graveyards. For example, you can have both legendary creatures Mirri, Cat Warrior and Mirri the Cursed in play, since they have different names. But you can't have both planeswalkers Ajani Goldmane and Ajani Vengeant, since they share a subtype (Ajani). 3. That's not right at all. First of all, player A can't play another Shapeshifter in response to the Path - like sorceries, creatures can only be played when the stack is empty. Second of all, the creature being copied by the Shapeshifter isn't chosen until the Shapeshifter begins resolving - and by that point, it's too late to respond. So player A plays a Shapeshifter. Player B responds by playing Path to Exile, targeting the Excavator. Path resolves and exiles the Excavator. Then the Shapeshifter resolves, and player A chooses an Ally to copy. If there are no other Allies in play, the Shapeshifter will be unable to copy anything, enter the battlefield as a 0/0, and die soon after. If player B let player A choose an Ally to copy with the Shapeshifter, he's essentially allowed the Shapeshifter to resolve. If player A then says that he's copying the Excavator, then it happens immediately - player B can't back up and Path the Excavator in response.
Q: What did you do? I had lunch with a friend then we went to the gun range. Later I got to drive an old excavator. And my parts came in so I can fix my 4-wheeler.
yeah, i went squirrel hunting
Q: Hello everyone, I want to ask some questions about archaeology. Can an excavation site be accessible to the public? thx for your answers?
It may but that would be foolish.
Q: what cards do you think i need to add?4xClone4xJwari Shapeshifter4xHalimar Excavator4xAgadeem occultist4xtomscour4xHagra Diabolistwhat else?i want some 1-2 casting cost allies to throw in to make the mill trigger fasterim also considering making it white/blue/blackso i can add the hadda free blade and ondu clericPLEASE HELP???i would like som
Mill Decks require one or more of the following: Leyline of the Void, Memoricide, Sadistic Sacrament. This is to handle shuffle Graveyard into Library effects. You also are leaving out Bala Ged Thief, who is absolutely crazy good. There's Bojuka Brigand for 2 mana, but he's not that hot of a creature since he can't block. I'd recommend Rite of Replication over Clone, because their non-kick mana costs are practically the same, but the kicker on Rite turns Excavator into a (minimum) 180 card mill. You also might want Crypts of Agadeem, for when some of your creatures get killed. Would help with kicking Rite of Replication or Sadistic Sacrament.
Q: How much does it cost in gas to run an excavator for 10hrs a day.?
Depends on the size of the excavator. Maybe you could rephrase the question to get a more accurate answer.
Q: We are trying to find house plans for a new home and we want a daylght or walkout basement. We've been told that it would cost about $80.00 per sq ft. We are looking at plans that would have about 2,000 sq ft basement. That would be $160,000.00 just for the basement. Is this reasonable?
Construction cost is the exact amount a qualified company is willing to contract for to do the work. Unless you have the option of doing the work yourself, the only way to know for sure what something should cost is to ask few contractors in your area. My guess is that an unfinished walkout basement of about 2000 square feet built into an easy access non-rock sloped site, with properly waterproofed and drained concrete or block walls and concrete floor with open wood frame wall with doors and windows on the on grade side would cost about $80. a square foot in the Central Texas area. Finishing the basement out would push the cost well over a $100. a square foot depending on the type of spaces and the finishes. Get other bids.
Q: I saw discovery channel prehistoric megladon sharks thrived in Kansas, Wyoming, And Texas and those three states were under water 82 million years ago! I want to take a trip out to wyoming, Kansas, and texas to farmlands and deserts to find dinosaur and prehistoric sea creature fossils and bones! How though? Do I just randomly dig? I'm so interested in prehistoric creatures and dinosaurs, I also leaned about how nyc once was home to castorodies or giant prehistoric beavers the size of a modern day grizzly bear and giant sea scorpions. Can I look in nyc for those remains? Have any fossils been uncovered in nyc during subway digging for the subway trains when they built it.
This year they have dig sites in Texas, excavating archosaurs, and in Wyoming, where they are digging out a large mammoth bone bed. I've participated in these expeditions and they are really interesting and good fun, besides that you learn professional techniques and get your name in the final expedition report.
Q: i want to dig a pond on my property (8 acres in vt)and want a website or a book with a how to..This will be a pretty big one - think 1/2 of an ice rink size?100 feet by 50 feet?don't know if i need to line it or not?backhoe? excavator?i want to do it myself by renting a backhoe type thing...any tips would be greatly apprectiated!
all you have to do is dig it out(doesnt matter how) and just line it with a bunch if plastic tarp , your gonna need a lot and youll have to over lap it, and then just put a bunch of rocks on the lining and catch frogs and get fish and lily pads and things like that to go in it.
Q: does it help cost that i dont need an electrician, i own the property already, and i have a cheap excavator? or are these just minor things?i'm extrememly new at this and Im trying to cut costs if possible. and are wood floors cheaper than having carpet put in? any answers to one or all of the questions are greatly appreciated!
Beware of the hidden cost of doing it yourself. Being an electrician is not the same as being a subcontractor and certainly not a general contractor. As a home owner, you do not buy as cheap as the general contractor. You cannot coordinate the subs the way the GC coordinates it. Getting every one on the job in the right schedule takes knowledge and clout. If not it is lost time and money. So you build a little and tear it down a little and every time you do that it cost you. Now while your fiancee has to make a choice between paying attention to the house (like pulling permits, ordering materials, waiting for inspections, chasing after subcontractors who doesn't show up etc), and his real job, his earnings takes a beating as well. I suggest your fiancee talk to a general contractor he works with and negotiates a good deal. He can still do the electrical part but let the GC handles the rest if this is your first time. By the way, carpet is a lot cheaper. Wood of course looks good. It depends on your budget and personal taste. If money is tight, do carpet now and later put wood in when more money is available. It is fun when you are chasing a dream. Good luck.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords