• Excavator 2014 China Best Sale Wheel  (HTL150-8) System 1
  • Excavator 2014 China Best Sale Wheel  (HTL150-8) System 2
Excavator 2014 China Best Sale Wheel  (HTL150-8)

Excavator 2014 China Best Sale Wheel (HTL150-8)

Ref Price:
get latest price
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
1 PCS
Supply Capability:
1500 PCS/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Excavator 2014 China Best Sale Wheel  (HTL150-8)


Product Details

Basic Info.

Model NO.:SC80W

 

Type:Wheel Excavator

Usage:City Construction and Angricultural

 

Bucket:Bucket&Dry Grass Gripper&Sugarcane Gripper

Transmission:Hydraulic Transmission

 

Drive Type:Hydraulic Driving

Bucket Capacity:0.1~0.5m³

 

Size:Small-Scale

Certification:ISO9001: 2000

 

Condition:New

Export Markets:Global

Additional Info.

Trademark:LISHIDE

 

Origin:Shandong Province, China

HS Code:84295212

 

Production Capacity:1000 Units

Product Description

Product feature:

Hydraulic parts: The swing reducer and the pilot control valve adopt international well-known products.

Connectors: World's top 500 EATON products, , applicable to various excavator in poor working conditions, anti-seismic, anti-loose, high reliability and long service lifespan.

Structure: Using domestic high-quality 16Mn steel, welding technology on the international track, greatly increase the structural strength, thus ensuring the safety of traffic and construction. Blasting handling vehicle, an increase of paint adhesion, delayed the rusty parts, components increased life expectancy.

Computer Monitor: Processor CPU comprehensivly monitor the whole car running, reminding functions works if there's something wrong, and can provide the smart protection for the launch machine.

Radiators: Radiators're aluminum more fin heat sink, using vacuum brazing process, the promotion of spoiler, enhanced heat transfer coefficient, small hydraulic flow resistance, adn can also easily manipulated even in the hot summer.

Travel: Walking adpotes the leading domestic mechanical transmission, traffic speed, suitable for long-distance transfers, save transit costs and maintenance convenient.

Steering system: Hydraulic power steering, running smoothly, the Light flexible.

DIMENSIONS
Overall length     mm5387
Overall widthmm2000
Machine heightmm2705
Ground clear ance(bob-weight)mm959
Tyre gaugemm1560
Wheel shaft diametermm2310
Min.ground clearancemm240
Fuel trankL125
Hydraulic oil tankL105
HYDRAULIC SYSTEM
Model
Gear Pump×2
Pressure Ratedkgf/cm 2190/185
flowL/min2×46
WORKING SYSTEM
Swing speed     rpm9.2
Travel speedKM/h30
Bucket diggingT3.0
force Arm diggingT2.5
force Maximun hauling forceT4.7
Max.torqueN.m/rpm199/1650
Gradeability°20
OPERATING SCOPE
Boom length      2880mm
Arm length1845mm
AMax.digging5900mm
Breach Max.digging3356mm
Cdepth Max.digging6344mm
Dheight Max.dumping4600mm
Eheight Min.swing2020mm
Fradius Rear-end seing radius1751mm

 



Excavator 2014 China Best Sale Wheel  (HTL150-8)

Excavator 2014 China Best Sale Wheel  (HTL150-8)


Q: How do they ventilate subway tunnels when they are building them? Obviously they cant use just electric vehicles to create stations and tunnels. TBMs are electric but they must use excavators, loaders, etc when building stations beneath the surface. How do they ventilate these tunnels?
There are several methods that have and are employed to make tunnels.1 Why do you feel it is obvious that electric machines cannot be used? Tunnels are the type of spaces with limited air that are ideal for the use of non polluting vehicles. Rather than say We have to make pollution, how can we move it somewhere else engineers have asked, How can we not pollute the air. Subways are electrically powered. Modern tunneling machines are probably the very largest electric vehicles.2 Some of the machines have their own power stations located outside of the tunnels and some of the machines will use a grid connection. In most pictures of tunneling you will notice either a conveyor belt or a railroad removing debris.Both of these are also easily electrified. Formerly shafts were sometimes run to the surface for removing debris. And this may continue to be a solution for ongoing operations. There is an island in the middle of the East River in NYC outside of the UN that was formed from tunneling debris for the #7 subway line.3
Q: I grab more than 7 months, I was driving in the opposite direction, loading it, find leveling is not good, but I don't want to go back to home but is the direction I do open in the opposite direction to open the positive direction of multi time can meet the urgent urgent urgent in the home. Now.
Two modes of operationThe first kind is the Japanese second-hand import machine and senior veteran driver as the representative, the left hand handle of the front, back, left and right corresponding control is the excavator's right rotation, left rotation, bucket extension and bucket recovery. We used to be referred to as "front and back spin"".The second type is the domestic new machine and the new generation of young drivers as representatives, left hand handle of the front, back, left, right, respectively, corresponding to the control of the excavator's bucket stick, bucket recovery, left rotation and right rotation. The habit is referred to as "left and right spin"".There are people who have called these two modes, "mobile phone" and "mobile phone", but due to the lack of a unified nomenclature, caused the differences on the way, before and after rotation is called mobile phone, the mobile phone is called reverse rotation, but also to rotate around the mobile phone is called, before and after the rotation is called reverse mobile phone. So to avoid confusion, said only this, before and after the rotation and rotation, to note here is "mobile phone" is refers to the rotation, and rotation or rotation before and after the "anti mobile phone", two kinds of the different mode of operation is only the left hand excavator operating handle, right invariant handle mode.
Q: What does LC mean after the Komatsu excavator model?
The letter "L" has many "excavator" models with the word "L", which refers to the "longer type crawler". The purpose is to increase the contact area between the track and the ground, which is generally used for the construction of soft working conditions on the ground L. The letter LC LC is a more common symbols in all brands have excavator, excavator LC styles, such as PC200LC-8, DX300LC-7, Komatsu Doosan Yuchai YC230LC-8, Kobelco SK350LC-8 and so on. The "LC" here means that the model uses widened longer track, the purpose of the same is to increase the contact area with the ground, generally used in the construction of soft ground conditions. The letter H in construction machinery Hitachi excavator type, often can see similar to the "ZX360H-3" type of identification, the "H" said heavy, generally used in the mining condition. In the Hitachi construction machinery products, H uses a rotary platform and increase the strength of the lower part of body to walk, and some standard rock bucket work device. The letter K letter "K" also appeared in the Hitachi construction machinery excavator product models, such as "ZX210K-3" and "ZX330K-3", "K" here said the demolition of type K excavator equipped with helmet and front protection device to prevent falling debris falling into the cab, and a lower running protection device to prevent the metal into the track.
Q: i cant find it and i was wonderin where it may b thanks
You gotta feel around
Q: I live in a condo complex. Four years ago there was an irrigation problem in front of my unit because my sidewalk was uneven. When it rained water would collect and cover the sidewalk. The board members at the time decided to cut corners and rather than raise the sidewalk, they simply punched 2-3quot; diameter holes in the cement (12 of them in a span of 10-15 feet!)...and now...there is no dirt under the sidewalk and when we have a good rain, water runs out from underneath the sidewalk and there's a moderate sized 'stream' that flows toward my porch. This stream has eroded ALL the soil from in front of my porch and I've lost several bushes because of it and my porch bricks are crumbling from the water damage. What type of contractor do I call to break up the old sidewalk, fill in the missing dirt and build a new sidewalk? What type of contractor would have the knowledge to fix this? A general contractor? Concrete guys? Landscapers? Plumber/excavators? Please help...
A cement contractor that specializes in sidewolks and driveways.
Q: Hello, i am currently look into building a Log home, i have the floor plan picked out and i'm working on budget, is it possible to quot;DIYquot; Basement foundation? What is the ball park contractor money figure for a 1700 square foot house's foundation with a 27' X 50' foot print. I have equipment (excavator) but my worry is the pouring concrete. Thanks for your time.
I you own the land, if you do not have expensive tastes, figure about 85.00 per sq. ft to have it professionally built. IF you go nuts in the kitchen and baths, that price can escalate to 120.00 per foot very quickly. IF you get it professionally built, make sure that the contractor is licensed and bonded, pay 1/3rd up front, and always retain at least 10% upon closing to insure the job was done right. Get references, do not go with the cheapest bid, for their are always reasons someone is way below the other's bids! Set a start date and a finish date in the contract! IF the job goes over, the contractor begins to pay you! That way, the contractor will not work one day a week on your job, and have 4 others going on at the same time! He arrives at 7AM or 8AM, works the entire day, cleans up and leaves at 4 PM EVERY DAy that is workable. This is a very important piece of advice! Otherwise, your home will start off with a bang, he will ask for more money, and then things will slow down to a crawl. I would also insist that as soon as under roof, ALL materials purchased with your money be on site, set up security immediatley...you do not want your money being spent on another home...too many contractors rob Peter to pay Paul while working, run out of money and cannot finish the job. Be very careful here! Goldwing
Q: I might be specializing in archeology. I really want to work as an excavator or a museum curator. Also, I'm going for my Phd.
For archaeology I would suggest coming over to Europe, where a) the field was developed and b) it is studied as a subject in its own right as opposed to a sub-field of a different subject.
Q: I need directions on changing motor oil on Caterpillar 320cl excavator?
at the back of the machine on the swing structurebelow the engine there should be a a hole in the metal or you can remove a peice of the metal but it should be at the back of the machine not far from the counter weight but if you look there is a hole or something you mite have to remove but they have a way of getting back there to do that if you still cant find it call you local cat dealer and they will beable to tell you were it is
Q: How do you charge for excavator work?
How much money a day /8 hours, and how much money per hour. The local charge is not the same, Jiangyin digging machine generally 200 yuan an hour
Q: i have experience running heavy equipment but not a excavator.any help is greatly needed.trying to impress new boss.
Like all the other machinery, it takes practice. If you have experience on other machines, you should pick it up quickly. Try to find someone to let you practice on it for a couple of hours.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords