electrical casting parts best quality
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Quick Details
Model Number: | |||||
Application: | Material: | Dimensions: | |||
Tolerance Grade: | Surface smoothness: |
Packaging & Delivery
Packaging Detail: | polywood cases |
Delivery Detail: | 30 days after the down payment |
Specifications
electrical casting parts
1,High precision castings
2,Long service time
3,Competitive price & high quality
4,OEM service
Production & Test Equipment ;
The company has strong technical R&D power, such as complete and perfect aboratory, Coordinate Measuring, Direct Reading Optical Spectrum Analyzers,Universal Testing Machine, metallographic Analyzer, X-light Non-Destructive Flaw Detector, Hardness Tester and other equipment, which is reliable assurance for research and development of spare parts.
Product Samples:
The wear-resistant parts apply to the fields as machinery,mine.building material and construction machinery. We also can offer OEM to satisfy our customer’s special requirement. The perfect marketing network-16 branches, more than seventy offices, offer the most convenient way to provide quality services and solutions.
- Q: Please help me in building professional people (scaffolding)
- Please know a good personLearn slowlyWell then consider whether or not to kick offMore types of scaffolding
- Q: Scaffolding installation and precautions?
- When the structural layer is attached to the wall, the wall column, the vertical horizontal rod and the transverse horizontal rod are set up immediately after the erection of the structure.5, closed with a step horizontal bar frame must turn around the hands all around the circle, with a right angle fastener and the inner and outer post fixed.6, the horizontal horizontal pole of the double row scaffold should not be greater than 100mm from the wall to the wall.7, when the scaffolding operation of the wall of the two steps, should take temporary stability measures, even after the wall pieces can be removed before the erection.
- Q: Which kind of scaffolding is the most convenient and time-saving?
- 4, the new type of formwork is the most suitable for the early removal of the keel, through early demolition can save a lot of keel, formwork and support rod, saving about 30%.5, strong and durable, plug and socket is not afraid to fall, not easy to be dead by cement, easy to transport, easy to inventory. At the same time, there is no loss of spare parts, lower than the bowl buckle type multifunctional scaffold.
- Q: Scaffolding installation process, construction preparation
- Construction preparation(1): steel pipe should be consistent with current national standard "carbon structural steel" (GB/T700) regulations Q235- grade steel; new steel pipe should be the product quality certificate; steel surface should be flat and smooth, no cracks, scarring, delamination, dislocation, bend, burr, indentation and scratch depth, pipe diameter deviation not more than -0.5mm, the wall thickness deviation not greater than -0.5mm, cutting slope deviation not greater than 1.7mm, the steel surface should be brushed with antirust paint; old steel corrosion depth not greater than 0.5mm, more than the prescribed steel shall not be used.(2): buckle made of malleable iron fasteners, the material should be consistent with current national standard "steel pipe scaffolding fasteners" (GB15831) regulations; old buckle inspect before use, shall not have cracks, deformation, bolt appear smooth silk must be replaced; new and old fastener must brush good antirust paint.(3) foot board: the use of 4m long wooden foot board; foot width of not less than 200mm, the thickness is not less than 50mm, both ends should be set with a diameter of 4mm galvanized steel hoop two; rotten feet can not be used.(4) safety net, paint.(5) after the inspection and acceptance of the above parts have been classified and piled up in a neat and orderly manner, no water can be accumulated.2, scaffolding erection and removal(1) scaffold erection
- Q: Fastener type steel pipe scaffold accessories
- Wall pieceEven the wall piece the upright rod is connected with the main structure together, available steel tube, fastener or embedded part. Rigid wall, also can be used as a flexible reinforced wall connecting piece of the tie bar.
- Q: How many time was Hester Prynne on the scaffold? why was she on it each time? What about the time when pearl and dimmesdale was on it with her? HELP!!!
- she was on it 3 times once as her punishment for adultery. then at night with pearl and dimmesdale when he was acknowledging his crime and then at the end to hear what is happening at the election or whatever it was. she was the only one up their (putting her at a higher level then the rest of society) and she was still there with dimmesdale when he died.
- Q: what are two burdens for each character? What action does each character indicate that she or he is indeed free from their burdens?
- Tell me what you know and I will elaborate. I had to read this book for a class and hated it, but I won't do your homework for you. I will help if you show you read it yourself and put in some effort we can see
- Q: The construction scheme of high rise and external cantilever scaffold!
- (2): Fastener fastener should comply with the "steel pipe scaffolding fasteners" (GB15831 1995). The provisions of fastener can't crack, porosity, trachoma and other casting defects. Surface fastener and steel tube to contact good fastener clamping steel pipe, the minimum distance of the opening should be less than 5mm.(3) the foot board; steel foot plate generally with thick 2mm steel plate, and the table has a uniform distribution of anti slip hole, board length 2~4m, width 250mm of fir or pine, board length 3~6m, width not less than 150mm.
- Q: why scaffold need for inspected within the preceding 7 days and after adverse weather condition?
- It is a work safety issue. Past experience has shown that scaffolding sometimes gets modified by unqualified people (or weather) resulting in injury or death.
- Q: Specification and type of scaffold erection
- Specification for scaffold erection(a) basic requirements1 important scaffolding must develop a construction plan, if necessary, to develop safety assurance measures. 2 more than 25m high scaffolding must adopt the fastener type steel tube scaffold, the single pole scaffolding height should be controlled within 50m; height of more than 50m of the scaffolding should be effective measures by a double pole, wire rope, cable stayed unloading segment, and additional design.3 the design of the scaffold shall meet the requirements of the project and shall indicate its use, maximum static load, maximum dynamic load andThe selected design parameters and structural parts shall not be lower than the existing national and industry related safety technical standards.4 scaffolding in the construction of the need to change the original structure, Gago (wide), to its use, etc., must be verified by the technical department, and the approval.
Send your message to us
electrical casting parts best quality
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords