Dry Method Sand Making Plant with Fully Automatic Control
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 60 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Dry Method Sand Making System introduction
Dry Method Sand Making System is researched and designed by the senior engineer of CNBM with 10 years experience , it combined all the machine into one equipment, including sand making , separating , dust separation and collection etc for crushing ,grinding ,stone-breaking-stone and reduce the motor power for the main machine .The final products is with stable gradation, cubic shape, adjustable fineness modulus . We control the stone powder content to meet National Standard effectively with Stone-Powder Separation Patent Technology . The final products from our Dry Method Sand Making System meet the requirement for high characteristic concrete and dry-mixed mortar . It saves much cost because the comprehensive performance of the final products is better than river sand and mountain sand . It leave out the heating procedure and save cost with the improved durability and strength and other performance for concrete . The final sand can be used directly without water washing . It is the first choice equipment for sand making in quarry , concrete industry, dry-mixed mortar industry without mixing river sand to adjust the ratio .
Dry Method Sand Making System Advantage :
1. The sand mould is premium.
During production process, “pounding, milling and rock hit rock” are all in one. Finished sands are gradating stability and in good shape (containing 10% or less micro-grading flour). All the sands are almost no flakiness. The finished sands are with more angular, nearly circular, fineness modulus (2.3 ~ 3.0). The percentage of powder content (below 10%) is adjustable. All the performance indicators are meets the national “Architecture Sand” standard GB14684-2011.(patented equipment).
2. Low energy consumption.
The energy consumption is 3kW/t which save 60% energy than the similar international or domestic products, greatly reducing the cost of production. Suit for the concrete sand cause its disposable sand ratio reach 0~4.75mm (>70%). And suit for dry-mixed mortar cause its disposable sand ratio reach 0 ~ 2mm(>40%).
3. Feed size range.
Feeding size from 0mm ~ 120mm.
4. Low noise.
Lower than traditional sand system 20db.
5. Wide range crushing.
In addition to variety of limestone, it can be used for crushing tailings, cobblestone, construction waste and other materials.
6. Environmental Friendly.
The system is equipped with advanced dust removal program, the working environment will be without any dust pollution.
7. Compact Structure.
100 ~ 200m2 (Transporting in parts available, finishing the installation and commissioning in a week normally), low height, the maximum height is 10 ~ 20 m.
8. High degree of automation.
Saving human resources greatly, because the control system is integrated in an operating room.
Dry Method Sand Making System parameter:
SJ-100 | Feed particle size | Feed quantity | Discharge quantity | Material particle size | Power |
The host system | 0~30~80mm | 120t | 0~4.75mm(>70%) | 150kW | |
Feeding system | 0~30~80mm | 120t | 20kW | ||
Discharge system | 0~3mm(product) | 80t | 0~2mm(>40%) | 15kW | |
De-dusting system | 15000m3/h(wind) | Powder quantity adjustable | Fine powder | 25kW | |
Sieving system | 0~30mm | 120t | 120t | 0~3mm;3~4.75mm;>4.75mm | 11kW |
Others | 15kW | ||||
Total power | 236kW | ||||
SJ-150 | Feed particle size | Feed quantity | Discharge quantity | Material particle size | Power |
The host system | 0~30~100mm | 160t | 0~4.75mm(>70%) | 220kW | |
Feeding system | 0~30~100mm | 160t | 45kW | ||
Discharge system | 0~3mm(product) | 110t | 0~2mm(>40%) | 30kW | |
De-dusting system | 20000m3/h(wind) | Powder quantity adjustable | Fine powder | 30kW | |
Sieving system | 0~30mm | 160t | 160t | 0~3mm;3~4.75mm;>4.75mm | 15kW |
Others | 20kW | ||||
Total power | 360kW | ||||
SJ-300 | Feed particle size | Feed quantity | Discharge quantity | Material particle size | Power |
The host system | 0~30~120mm | 320t | 0~4.75mm(>70%) | 400kW | |
Feeding system | 0~30~120mm | 320t | 60kW | ||
Discharge system | 0~3mm(product) | 220t | 0~2mm(>40%) | 45kW | |
De-dusting system | 40000m3/h(wind) | Powder quantity adjustable | Fine powder | 45kW | |
Sieving system | 0~30mm | 320t | 320t | 0~3mm;3~4.75mm;>4.75mm | 22kW |
Others | 20kW | ||||
Total power | 592kW |
Note:
1.These parameters of sand production make limestone as a reference base.
2.Feed requirements in accordance with international standards, stone moisture is less than 5%.
3.Sand production will change according to different stone and raw material.
4.Designed by site-specific, picture is only for reference.
FAQ
1. Our Advantage
We are one of the largest State-Owned Enterprises in China which established in 1984 , has 30 years experience in stone crushing and sand making industry , have rich experience , We have professional R&D design department and technical engineer , we can make the design and suggest the suitable machine as per customer’s special requirement and any products is customized .
2. Quality Guarantee
We have Strictly Quality-Inspection Department and we also can apply SGS and other Third-Party Agency to check the Products to make sure superior quality .
3. Payment Terms :
Generally we accept TT and LC , if project requirement , we can accept DP and LC After Sight .
4. After Sales Service
We can send our engineer and sales manager to your job site for work and installation direction and make training for your workers .
5. Time of Delivery
We can overdo work for the customer to make sure the fast shipment
- Q: What are the requirements of the temperature of the crusher when it is working normally?
- The jaw crusher bearing off the oil or oil injected too much; plug hole, oil and not fly; counterweight sheave position deviation, rack beat; abdapter axial moving; bearing wear or damage of the holder, the bearing temperature can cause the jaw crusher is too high. Aiming at the above problems, summarizes the corresponding methods: according to the instructions provided on time, quantitative gas; clean up oil holes and grooves blockage; adjusting the flywheel counterbalance position; removing rack bearing cover, lock bushing and remove the flywheel or Geneva, the replacement of the locking sleeve; replacement bearing; replace the end cover and the sealing sleeve, bearing cover or loosen the frame bearing seat at one end of the heating fuse, and embedded with the cover frame bearing seat is pressed into the groove, and then set on the bearing cover, remove block cover rotation. Jaw crusher, users need regular equipment overhaul, maintenance, in order to ensure the stable operation of equipment.
- Q: i heard this in a funny video on youtube on pranks
- A butt crusher is a Sexual act , a type of an exercise where the butt muscles r exercised and also a equipment made to crush cigarette butts
- Q: I'm concerned about the fire extinguisher residueI read somewhere that it can get into the little cracks in the oven and is toxic when you turn your oven on. So I haven't tried to turn it oncan I adequately clean the oven so it's safe to use?
- The 22 degree is a 45, make a 45 and back again- start down stream from the turn.
- Q: These past couple of weeks every time The Shield face Evolution The Shield beat Evolution. The only time Evolution has beat them was when they had like twenty guys help them. I guess Evolution can't beat The Shield.
- Lucky you. Your going to need more than a crusher It's called a cone crusher/pulverizer. One company: Shanghai Shibang Machinery Co. Ltd
- Q: How many films can you name with numbers in the title? BUT PUT THEM IN ORDER LADIES AND GENTS. Sequels are ok if for instance the title itself changes instead of just 2 or 3 on the end.For example 'three men and a little lady' is ok but but xmen 3 is not.who ever gets the most gets the points, have fun :)
- Sennheiser are great for over-ear Sound cancelling headphones with excellent quality, even the ones that are wireless. I recommend a Sennheiser over Skull any day.
- Q: I have this rubber band car project for science and I need to make it travel a distance of at least 5m to get credit. The only materials I can use are carboard, rubber bands, straight pins, and wooden skewers. Pre-made wheels are not allowed, I must make my own. My car cannot be longer than 20cm, wider than 20cm or higher than 15cm.If you have a site I can use, it'd be very much appreciated if you posted the link! :) If you give instructions yourself, please make them clear, accurate, and close to step by step as possible but not too long. I am a visual person so pictures will help with the instructions as well. Thank you!
- Small fires in forests even with a properly constructed fire pit and water on stand by. Have a nasty habit of becoming large wild fires that destroy thousand of acres of forest and kill wild life and fire fighters! So leave your interest for pyrotechnics at home and take a camp stove with you along with warm clothing!
- Q: it needs to use hydraulics or pneumatics.Im willing to spend a bit of money but not alot under 30$. if anyone can help me please do.
- perhaps you can generate the force hydraulically using a small bottle jack (like those I've referenced in a link). All the the crucial bits are pre-manufactured, and saves so much hassle sealing leaks, making sure the pistons run straight etc. Get a piece of pipe (probably best if it's metal, but plastic drain pipe might be OK, if you're not not using that much force!) and cut a section of it away so can still use the jack's handle when it's placed inside the pipe. A can be prevented from shifting when being crushed by having a through pin (a removable steel bolt going all the way through the pipe) on the side opposite to the crushing force. You then need to counter the reaction force produced by the jack pressing against the can. Again you could use a through pin to prevent the jack shifting, but if you've got the equipment/expertise welding/braising might be a better solution. Perhaps a series of holes for the through pins would help cope with different sizes/number of cans? (You might be able to get the bits from a half decent scrap yard, and maybe claim some extra credit for recycling the components) www.machinemart .uk/shop/range/...
- Q: What do you believe is Hell? A place of darkness? A place of fire? Or a place of separation from God? Define the meanings of those three. Please be concise and clear. Bonus question: If it is a place of fire how can it also be a place of darkness? Fire lights things up. I am not making fun. Just trying to find out your thought.
- Hell is referred to as the bottomless pit. Throughout the Old Testament the earth would open and people would fall down into it. The centre of the earth is from where, all directions are 'up'. There is no bottom. it is bottomless literally. As for your bonus question: If it is a place of fire how can it also be a place of darkness? We are talking about the supernatural here, so no bonus for you bonus question.
- Q: Do alarm panels have any type of patch panel I can set up? I am renovating a cabin, and ran lots of (4 wire) alarm wiring before putting up drywall. I ran continuity checks and labeled everything. Now, I have wires just hanging out of the wall in my laundry room, and I don't have any immediate plans to utilize the wiring. Is there any type of patch panel I should terminate the wires into? I thought about putting in several terminal blocks, but I was trying to find some kind of standard.
- i can,t understand why studded tires would be illegal. they are legal her in PA the only thing is that you have to have them off by april 15th. the only thing i can tell you is put mud and snow tires clean around your car. i would be checking in on the studded tires rule. as for chains i could understand that but studded tires should be okay.
- Q: ...I can? Full body workout. Mday,Weday,Fday. Also is it ok to do incline barbell bench press,flat barbell bench,decline dumbbell press and add more on the same day if it is ok?
- That would be overkill for most people not using steroids. Maybe if you only did one set of each you could benefit from it, but even that might be too much. Only sure way to know is to give it a try for a few months and check results.
Send your message to us
Dry Method Sand Making Plant with Fully Automatic Control
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 60 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords