Dry Method Sand Making System introduction
Dry Method Sand Making System is researched and designed by the senior engineer of CNBM with 10 years experience , it combined all the machine into one equipment, including sand making , separating , dust separation and collection etc for crushing ,grinding ,stone-breaking-stone and reduce the motor power for the main machine .The final products is with stable gradation, cubic shape, adjustable fineness modulus . We control the stone powder content to meet National Standard effectively with Stone-Powder Separation Patent Technology . The final products from our Dry Method Sand Making System meet the requirement for high characteristic concrete and dry-mixed mortar . It saves much cost because the comprehensive performance of the final products is better than river sand and mountain sand . It leave out the heating procedure and save cost with the improved durability and strength and other performance for concrete . The final sand can be used directly without water washing . It is the first choice equipment for sand making in quarry , concrete industry, dry-mixed mortar industry without mixing river sand to adjust the ratio .
Dry Method Sand Making System Advantage :
1. The sand mould is premium.
During production process, “pounding, milling and rock hit rock” are all in one. Finished sands are gradating stability and in good shape (containing 10% or less micro-grading flour). All the sands are almost no flakiness. The finished sands are with more angular, nearly circular, fineness modulus (2.3 ~ 3.0). The percentage of powder content (below 10%) is adjustable. All the performance indicators are meets the national “Architecture Sand” standard GB14684-2011.(patented equipment).
2. Low energy consumption.
The energy consumption is 3kW/t which save 60% energy than the similar international or domestic products, greatly reducing the cost of production. Suit for the concrete sand cause its disposable sand ratio reach 0~4.75mm (>70%). And suit for dry-mixed mortar cause its disposable sand ratio reach 0 ~ 2mm(>40%).
3. Feed size range.
Feeding size from 0mm ~ 120mm.
4. Low noise.
Lower than traditional sand system 20db.
5. Wide range crushing.
In addition to variety of limestone, it can be used for crushing tailings, cobblestone, construction waste and other materials.
6. Environmental Friendly.
The system is equipped with advanced dust removal program, the working environment will be without any dust pollution.
7. Compact Structure.
100 ~ 200m2 (Transporting in parts available, finishing the installation and commissioning in a week normally), low height, the maximum height is 10 ~ 20 m.
8. High degree of automation.
Saving human resources greatly, because the control system is integrated in an operating room.
Dry Method Sand Making System parameter:
SJ-100 | Feed particle size | Feed quantity | Discharge quantity | Material particle size | Power |
The host system | 0~30~80mm | 120t | 0~4.75mm(>70%) | 150kW | |
Feeding system | 0~30~80mm | 120t | 20kW | ||
Discharge system | 0~3mm(product) | 80t | 0~2mm(>40%) | 15kW | |
De-dusting system | 15000m3/h(wind) | Powder quantity adjustable | Fine powder | 25kW | |
Sieving system | 0~30mm | 120t | 120t | 0~3mm;3~4.75mm;>4.75mm | 11kW |
Others | 15kW | ||||
Total power | 236kW | ||||
SJ-150 | Feed particle size | Feed quantity | Discharge quantity | Material particle size | Power |
The host system | 0~30~100mm | 160t | 0~4.75mm(>70%) | 220kW | |
Feeding system | 0~30~100mm | 160t | 45kW | ||
Discharge system | 0~3mm(product) | 110t | 0~2mm(>40%) | 30kW | |
De-dusting system | 20000m3/h(wind) | Powder quantity adjustable | Fine powder | 30kW | |
Sieving system | 0~30mm | 160t | 160t | 0~3mm;3~4.75mm;>4.75mm | 15kW |
Others | 20kW | ||||
Total power | 360kW | ||||
SJ-300 | Feed particle size | Feed quantity | Discharge quantity | Material particle size | Power |
The host system | 0~30~120mm | 320t | 0~4.75mm(>70%) | 400kW | |
Feeding system | 0~30~120mm | 320t | 60kW | ||
Discharge system | 0~3mm(product) | 220t | 0~2mm(>40%) | 45kW | |
De-dusting system | 40000m3/h(wind) | Powder quantity adjustable | Fine powder | 45kW | |
Sieving system | 0~30mm | 320t | 320t | 0~3mm;3~4.75mm;>4.75mm | 22kW |
Others | 20kW | ||||
Total power | 592kW |
Note:
1.These parameters of sand production make limestone as a reference base.
2.Feed requirements in accordance with international standards, stone moisture is less than 5%.
3.Sand production will change according to different stone and raw material.
4.Designed by site-specific, picture is only for reference.
FAQ
1. Our Advantage
We are one of the largest State-Owned Enterprises in China which established in 1984 , has 30 years experience in stone crushing and sand making industry , have rich experience , We have professional R&D design department and technical engineer , we can make the design and suggest the suitable machine as per customer’s special requirement and any products is customized .
2. Quality Guarantee
We have Strictly Quality-Inspection Department and we also can apply SGS and other Third-Party Agency to check the Products to make sure superior quality .
3. Payment Terms :
Generally we accept TT and LC , if project requirement , we can accept DP and LC After Sight .
4. After Sales Service
We can send our engineer and sales manager to your job site for work and installation direction and make training for your workers .
5. Time of Delivery
We can overdo work for the customer to make sure the fast shipment
- Q: Should i take the evil path and get the Dream Crusher Perkor the good path and get the Survival Guru Perk?
- Fallout 3 Dream Crusher
- Q: I am starting a split workout which is very new to me and I am not sure if I am over training. My workout is a split of one day of Chest, tris, shoulders and traps, the next day I do biceps, lats, forearms, abs, and back, and the third day I rest or do cardio. After my rest day I start over with my first workout again. On my first day I usually do flat bench press, flyes, dumbbell bench press, skull crushers, dumbbell tricep extensions, shrugs, dumbbell raises, incline push ups and dips. On the second day I usually do two types of curls, one armed rows, wrist curls, reverse curls, chin ups, pull ups, a lower back exercise, and different types of sit ups for around 10-15 mins. I am making large gains but I am just wondering if I could make larger gains by working out less. I am also taking glutamine, creatine and lots of protein in my diet which should reduce my recovery time. If anyone has any comments on if what I am doing is over training or any ideas to improve my workout please comment.
- good news is i don't think your over training, well at least not now. on this program i'd expect the average person to be able to put in a good 6-8 weeks befor you'd need a rest of a week or two. However, if you don't mind, i would sugest one or two 'tweeks' to your program. Workout 1: you've got one or two exesizes doubled up here, for example the flat bench and dumbell bench are essentialy the same exesize. best to do only one of them in a workout, and then do the other the next time you do workout 1. The same applies to scull crushers and tricep extensions, except scull crushers are far and away better, just drop the extensions (IMO). You have very little shoulder work in this workout. you need to add a millitary press type lift, and trap work is better suited to you other workout. and you should order them with the biggest lifts first e.g. flat bench, millitary press, dips, scull crushers, push ups, raises, flys. Workout 2 you need to add a dead lift to this workout, its just too good a mass building exesize that your missing out on if you don't do it. put that first, then chins, rows, traps and curls and then wrist curls last. but the main issue with this workout is you have no leg work, you need a third day where you do heavey 20 rep squats, stiff leg dead lifts and calf raises. its a brutle workout and you'll want to miss it, BUT you must not. this work out will make your body release loads of testosterone (which is what steroids copy) so its like taking natural steroids. you're short changing yourself if you don't do this.
- Q: Why does lib Crusher have a crush on Vladimir Putin?
- Putin's butt tastes like cotton candy to him.
- Q: i tried going to the oil cans then the car then the ect i got all the way to the machine an i played with the big car machine thing and the car fell ontop of crusher but crusher got back up an kept throwing oil cans at me and i tried over and over but it kept doing the same thing an i couldint defeat him somebody helpp?
- That is exactly what I did to beat him, just keep at it, it isn't easy.
- Q: What is the structure and composition of the refrigerator crusher?
- The refrigerator refrigerator also called crusher crusher, Henan Huizhong Kuwait machinery is the production of professional refrigerator crusher manufacturers, refrigerator crushing machine: the structure and composition of 30mm and 90mm thick steel plate automatic welding, with internal high manganese steel liner, with external stirrups, making machine durable.
- Q: show a video or tell me somthing that makes you laugh
- call 911. OMG! Stop drop and roll. Grab water !blanket! I would freak.
- Q: i am thinking of doing bench press(chest), skull crushers(triceps), biceps curl(biceps) and shoulders, but dont know which exercise.which ones of these exercises will help me get bigger chest and arms and how do i spread them out in the week?
- for your chest do a wide grip flat bench, close grip flat bench will work your triceps and chest, incline will work your chest and shoulders. the best shoulder (deltoid) excercize is a military press... for biceps use bicep curls, if you want to go for a different angle use chin ups and hammer curls.... triceps are dips and skull crushers
- Q: The mechanic also said oil from the engine helps clean debri from the chain, and if i get lucky, the noise will go away. is this true?
- I wouldn't know. He/She blocked me
- Q: I've always wondered what would happen if a person was unlucky enough not to squeeze through the doors of a fast-leaving train. Would the train stop from leaving? Would the doors open again like when the elevator does it? Has it been fatal? D: I am curious.
- pretentious hypocrite, whom contradicts him self over and over.
- Q: There is a 110Kw motor belt, a crusher, frequency control, running about 2000 hours a year: should consume 220000 degrees, right?
- The 110KW motor is not absolute. It consumes 110 degrees per hour! The load is light, not so much, and the load is more than 110 degrees. The general crusher has the use of flywheel inertia effort, so under normal circumstances there is no electricity 110 hours per hour. As for the inverter, saving power is of little significance, if you consider the speed is almost
Send your message to us
Dry Method Sand Making Plant with High Efficiency and Easy Operation
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 60 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords