Cuplock Scaffolding with Construction Electric Galvanized or Paint
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 20000 pc
- Supply Capability:
- 3000000 pc/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Cuplock Scaffolding
1.Comperticative price
2.Good bearing capacity
3.Stable& durable
4.Easy to assemble or dismantle
Specifications
Best price cuplock scaffold:
Steel Tube ScaffoldSystem,Ring System Scaffold,Steel Pipe Ring-Lock Scaffold
Product introduction
Luowen CupLock Scaffolding is a new type of scaffolding, it is researched, designed and developed referencing the advanced foreign technology of joint and accessories, good in quality and application.
Product features
1.Simple structure: The main parts include the standard, ledger and brace, it is easy to assemble and disassemble, and also easy to storage, transfer and maintain.
2.Safety and Steady: The up cup has the screw friction and self-gravity, it could self-lock steady, this makes the ledger steady, the loading of the ledger could transfer to the standard through the down cup, even the up cup is loose, the ledger joint could connect with the standard steady.
3.Multi using: According to the specific construction, Cup Lock Scaffolding could be assembled into one or two row with different size, it could also be used for multi construction tools, such as supporting frame, supporting column, materials lifting frame, stage supporting, etc.
4.High loading: The standard actuates axially, this makes the scaffolding in the three-dimensional space, high strength and steady of the structure. The cross plate is good at axial shearing resistant, and makes the axis of each pipe in one plate, so it improves 15% strength and steady performance.
5. Re-used: Luowen scaffoldings are made by high grade steel, they are not easy to damage or out of shape,so it could be used repeatedly.
Product name | Cuplock scaffolding |
Components | standard ,ledger,diagonal , top cup, bottom cup, Ledger Blade |
Material | Q235/345/195 |
Surface | galvanized, Hot dip galvanized, Painted |
color | red paint, blue paint, yellow paint, green paint, bright galvanized |
size | Steel pipe diameter is 48.3mm Thickness :2.75/3.0/3.2/3.25/4.0mm standard Length:0.5/1.0/1.5/2.0/2.5/3.0M Ledger length:0.6/0.9/1.0/1.2/1.5/1.8 |
usege | Our products are used widely in bridge, tunnel, petrifaction, shipbuilding, railway, airport, dock industry and civil building etc |
Packing | Bulk or Bundle with steel strip |
Size:
Standard Ø48.3×3.25 Q345 | Ledger Ø48.3×3.25 Q235 | Diagonal Ø48.3×3.25 Q235 | |||
Size/mm | Weight/kg | Size/mm | Weight/kg | Size/mm | Weight/kg |
500 | 3.45 | 600 | 2.54 | 1300×2000 | 9.21 |
1000 | 5.58 | 900 | 3.60 | 1800×2000 | 10.31 |
1300 | 7.97 | 1000 | 4.10 | 2500×2000 | 12.16 |
1500 | 8.74 | 1200 | 4.70 | ||
1800 | 10.60 | 1250 | 5.00 | ||
2000 | 11.38 | 1300 | 5.20 | ||
2500 | 14.00 | 1600 | 6.30 | ||
3000 | 16.63 | 1800 | 7.00 | ||
2500 | 9.54 |
- Q: Single double scaffolding distinctionPlease list the sketch map
- 1) a single standard steel scaffolding steel pipe. It uses only one standard, such as steel tubular scaffolding, welded steel pipe using only 48.3 * 3.5.2, a variety of specifications of steel scaffolding, which consists of more than two kinds of different specifications of the steel pipe, such as door scaffolding3) steel based scaffolding. As to the steel pipe, and combined with other type of steel pieces composed of scaffolding, such as the channel has a base in the backwater or scaffolding, connecting steel scaffolding. A bowl type steel tube scaffold when using steel bar when the "scaffolding" when using the single pipe; take the side of the steel bar, "steel based scaffolding".
- Q: What kind of scaffolding used in engineering construction
- For construction and erection of the load borne by the fastener and steel pipe, such as the composition of the scaffolding and support, collectively referred to as (fastener) scaffolding.
- Q: What is scaffolding pole, bar, scissors support?
- 2.2 according to the vertical and horizontal transmission force between the vertical and horizontal1 by the contact surface friction force transmission, that is, at the junction of the contact surface of the pressure after the friction force to support the transverse load and transfer it to the vertical pole, such as the role of the fastener, through the positive pressure of the bolt to produce friction;2 by the welding force transmission. Most of the cross bar and vertical rod socket connection is used in this way, the door frame is also this way;3) direct pressure transmission force. This method is more common in the horizontal bar on the top of the scaffolding;4. The shear force of the dowel bar is connected with the vertical connection plate of the cross bar and the hole of the vertical rod to realize the connection and the shear force between the two sides of the pin rod
- Q: how will i clean it as its very tender to touch.. :(
- The best thing to use is sea salt soaks: Add 1/4 of a teaspoon of Sea salt (available in supermarkets) to a mug of kettle boiled water, mix and leave to cool slightly before applying it to the piercing. For this particular piercing it may be best to dip and soak your ear in the cup of solution and leave it there until the water cools. After this rinse away any excess salt, dry carefully, with a cotton bud gently remove any crusty bits and avoid touching it at all, especially with dirty hair/shampoo and conditioner etc. Do this twice a day for a few months after which you can cut down to doing it just once a day and just rinse it with the warm water in the shower.
- Q: Tips and advices regarding the piercing or healing process will be greatly appreciated. Thanks:)
- It all depends on where you go. They can range between 25-35 dollars. Just remember to relax and eat a good meal before you go. Healing takes around 6 months to a year. Your piercer will instruct you on how to care for it. Always ask your piercer any and all questions you have.
- Q: what should i do?? i've been washing it and leaving it to heal but im worried about it. i've had the piercing for 9 days now and i only noticed this yesterday. any ideas?
- that means that was piercing wasn't done as well as it could have been. there is nothing you can do about it except take it out, let it heal, and have it re-pierced. go see your piercer. they should be able to tell you if it's a problem, and they should re-pierce it for free.
- Q: The relationship between the height of the scaffold and the design load
- Compared with the steel pipe scaffolding, saving more than 500 thousand yuan of funds;
- Q: I've had my industrial piercing for a long time now, but I was wondering if I could put two 14g tongue rings in the holes. Would that damage them or make them crooked? Also, could I use two tongue retainers? Thanks.
- No!. it wont damage or crooked. i have one in my right ear n when i lost the pircing. i put on my tongue ring, and nothing happend! they might strech alil be more than ur usual size but it lo0ks kool!
- Q: I just got my ear pierced(scaffold) and I was wondering if anything would go wrong if I played sports... I play soccer Track and my coach said they would let me play soccer as long as I covered it up, but I was just wondering if I get hit or something if it would damage my ear really badly? :) Thanks lt;3
- i probably will cause if u get him with a soccer ball it could rip the scaffold ring right out of ur ear. u should just take it out when u do sports and when ur not doing sports put it back it. i hope this helps u
- Q: If the guillotine operator walked away from the scaffold where would he be headed?
- lol, i have no answer for this...just laughter..
Send your message to us
Cuplock Scaffolding with Construction Electric Galvanized or Paint
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 20000 pc
- Supply Capability:
- 3000000 pc/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords