• Construction & Real Estate scaffolding for promotion System 1
Construction & Real Estate scaffolding for promotion

Construction & Real Estate scaffolding for promotion

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
10000 pc
Supply Capability:
10000 pc/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Quick Details

Brand Name:

TYT

Model Number:

scaffolding sets



size:

all size can be customize or as drawings

color:

as requested

type:

light or heavy duty

surface:

painted, galvanized, powder coated

use:

together use with formwork

packing:

in bundle/pallet or as requested

main components:

main tube, solit screw, plates, etc.

support:

fix vertical formwork

main market:

Southeat Asia, South America, Middle East, etc.

weld:

manual welding





Packaging & Delivery

Packaging Detail:in bundle or in pallet, can ba as requested
Delivery Detail:within 20 days after confirmation

Specifications

scaffolding:0914/1219/1524/1700/1930 mm 
main tube:42mm 
small tube:25mm 
thickness:1.2/1.5/1.8/2.0/2.2mm 
can be customiz

 

 

Product Description

 the below are normal size, we can customize for you accrodingly.

 

height

Main tube

Weight

9014 M

42 mm

8.0 KG

1219 M

42 mm

11.4 KG

1524 M

42 mm

13.1 KG

1700 M

42 mm

13.6 KG

1930 M

42 mm

15.0 KG

 

 

Packaging & Shipping

 packing are suitable for shipping, conveniently loading and unloading by forklift.

Our Services

 we are an experienced manufacturer of scaffolding products, 

all you need to do is confirm the size you need, we will arrange the rest work for you, 

confirm sample, begin to production, arrange shipment.


Q: How to solve the problem of scaffold pipe repair
ST100 type hyperbolic steel pipe straightening machine adopts staggered rolling rotary straightening system, the 4 line rolling wheel revolves around the steel pipe:
Q: Scaffolding installation and precautions?
The backing plate and the base should be placed on the positioning line accurately.2, when the erection of the column, the outer diameter of the steel pipe is strictly prohibited, the adjacent column of the docking fasteners shall not be in the same height, staggered distance should meet the structural requirements.
Q: i already found the force in rope 2 but im not getting the force in rope 1.
difficult situation. search in google or bing. that could actually help!
Q: Also what 2 cell populations in the body that don't routinely undergo cell division
The first one is vague. The answer could be the mitotic spindle. It might be kinetochore microtubules. It might be talking about the kinetchores on the chromosomes instead of the microtubules that attach to the kinetochores. It could possibly even be talking about the centromeres, though to me that seems less likely. Neurons in the adult brain (and mature muscle cells?) do not routinely undergo cell division.
Q: Where to use scaffolding in construction
1, set up a high-level scaffolding, the various materials used must meet the quality requirements.2, the foundation must be firm, before the erection of the calculation, to meet the load requirements, and according to the construction code set up, do drainage measures.3, scaffolding erection technical requirements shall comply with the relevant provisions of the code.4, we must attach great importance to a variety of structural measures: scissors, pull nodes, etc. should be set according to requirements.
Q: Topic?Scaffolding construction program how to doSpecial construction scheme
Full support calculation method:1, determine the above line load (ie, the length of a variety of meters, take the maximum);2, to determine the bearing capacity of the foundation (through the strengthening of the bearing capacity);3, according to the bearing capacity of the foundation, about how many square meters per square meter to determine the vertical tube, assigned to specific point load;4, to determine the number of tons of vertical pipe can be per ton (according to pipe diameter, wall thickness calculation of allowable stress);
Q: how long should i leave it before i change it, should i do it myself or go to the piercer to they can do it?and is it still normal for the pericing to hurt after quite a while of having it done?
Hi :) You can change it after 4 months usually But sometimes it can take up to a year It depends on the person , everybody's body heals differently You should go back to your piercer and ask if it's healed enough to change the jewellery Yep , it's normal A scaffold piercing goes through the cartilage and cartilage piercings can take up to a year to fully heal :)
Q: Cantilever scaffold technical disclosure Find satisfaction free speed!!!
Foot plate:(1) scaffold with welded steel sheet with 18# wire fence, bundled in the bar.(2) steel bar appear off, the serious corrosion of the prohibition of the use of.(3) the wire binding must use 18# wire binding, and each steel bar binding plate must be above 4
Q: I want to get a scaffolding piercing, but i just wanna know some information.. past experiences etc. So far i have two lobe piercings on both ears and the pain wasn't too bad, but i've never had a piercing on the upper ear. How much will it cost? (I live in the UK) Just some information i guess (: thanks
I have two lobe piercings on both ears, two cartilage piercings and an industrial that i got five months ago. I was expecting my industrial to be very painful but it wasn't that bad (i have a high pain tolerance though) its a bearable pain. Like all other piercings the healing process is the worst part and still when i bump it (like when im doing my hair) it hurts like a B****! lol. And don't play with it alot when you first get it, it causes scar tissue bumps. Use H20cean spray or you can do 1/4 tsp of sea salt and 1 cup of water to help heal it. The healing time is long, 4 months to a year. I paid $65 dollars in the us idk how much that is UK. It was definitely worth it though! Go for it :)
Q: Bowl buckle scaffold inspection and evaluation
1 main components should have product identification and product quality certificate.2 the supplier shall provide the material, product inspection report of the pipe, parts, casting, stamping parts and so on.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords