Concrete Pump Truck 145kw (LP90.18.195DU)
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 PCS
- Supply Capability:
- 1500 PCS/month
OKorder Service Pledge
Quality Product, Order Online Tracking, Timely Delivery
OKorder Financial Service
Credit Rating, Credit Services, Credit Purchasing
You Might Also Like
Concrete Pump Truck 145kw (LP90.18.195DU)
Product Details
Additional Info.
Trademark:CST
Product Description
Shandong CST Machinery Co., Ltd has been the production of import permit license of Isuzu CYH51Y II-chassis basis, the installation of special facilities, such as concrete pump, the development of the TELUX brand of HDT5380THB type concrete pump truck. N3 is a type of car diesel engine, Engine layout is longitudinally set, Engine vehicle driving is 8 x 4, back driving.
Product name | Concrete pump truck | Product type | HDT5380THB | ||||||||
Product brand | TELUX | Vehicle identification code | JALY 9F 5Y367000597 | ||||||||
Enterprise name | Shandong CST Machinery Co., Ltd | Vehicle type | N3 | ||||||||
Whole truck | Dimension parameters | Dimension(mm) L× W× H | 13100× 2490× 4000 | Ch-assis | Model | CYH51Y | |||||
Type | two | ||||||||||
Internal size of board edge iron L× W× H(mm) | ---- | ||||||||||
Axle No. | 4 | ||||||||||
Packing case volume (m 3 ) | ---- | Tyre size | 295/80R22.5 | ||||||||
Wheel base(mm) | 1850+4605+1310 | Tyre No. | 12 | ||||||||
Track(Front / rear) | 2065/2065/1850 | clutch | Model | Φ 430 | |||||||
Front overhang/ rear overhang (mm) | 1400/3300(quantity of posterior extension: 635) | Type | Pneumatic hydraulic , Dry single-chip | ||||||||
Approach angle / departure angle (° ) | 16/12 | ||||||||||
Quality Parameters | Equipment quality(kg) | 37870 | Gea-rbox | Model | MJT7S | ||||||
Rated load quality(kg) | ---- | Type | Mechanical manual | ||||||||
Total mass(kg) | 38000 | ||||||||||
Saddle Max bearing quality(kg) | ---- | Operation manner | manual | ||||||||
Forward speed gear of quantity | 7 | ||||||||||
Axle weight (one axis/two axis/three, four axis)(kg) | 6200/6800/25000 (double-axis) | Transmission ratio | 6.833; 4.734; 2.783; 1.822; 1.307; 1.000; 0.728; Reverse gear: 6.327 | ||||||||
Coefficient of mass utilizztion | ---- | Steering gear | Type | ---- | |||||||
capability | Max speed(km/h) | 89 | Type | Cycle-ball power steering | |||||||
engin | Type and classification | Top-mounted camshaft , water Cooled direct injection 4 stroke , cooled turbine pressurize direct column 6 cylinder | Turning type | Steering wheel | |||||||
Model | 6WF1D | Onetwobridge | Model | ---- | |||||||
Type | Whole Jagdfaust driven move | ||||||||||
Displacement(mL) | 14256 | ||||||||||
Fuel type | Diesel | Three Four Bridge | Model | ---- | |||||||
Rated power/speed (kW/(r/min)) | 287/1800 | Type | Full floating mechanism , single-stage deceleration duplex bridge | ||||||||
Max torque /round(N. m/(r/min)) | 1863/1100 | ||||||||||
Main reducer speed ratio | 5.571 | ||||||||||
Engine No. | 410533 | Braking System | Service brake type | Double-loop air brake | |||||||
Discharge standard | GB 17691-2005 The third stage of China | Service brake power-assisted type | ---- | ||||||||
Brake-force control type | ---- | ||||||||||
GB 3847-2005 | |||||||||||
Parking brake type | Spring energy air cut brake | ||||||||||
body | Model | ---- | Emergency brake type | Spring energy air cut brake | |||||||
Type | Flat head all-metal flip front | Suspension system | Fround | Type | Engine-based, leaf spring | ||||||
Leaf spring No. | 8/7 | ||||||||||
Seating No. (include driver ) | 2 | rear | Type | engine-based, leaf spring | |||||||
Number to be allowed in Cab | 2 | Leaf spring No. | |||||||||
- Q:What is the introduction of fine stone concrete pump
- especially in the narrow construction site. It has the advantages of high safety, high efficiency, good quality, low environmental pollution,
- Q:What factors will be taken into account when selecting the pump chassis?
- In the fuel prices continue to rise today, pump fuel consumption is also a factor that customers have to consider.
- Q:What is the maintenance method of concrete pump?
- Disassembly Pipeline cleaning should be taken before the anti-pumping method to clear the pressure of the pipeline.
- Q:What is the difference between a concrete pump and a concrete pump?
- Is a use of pressure, the concrete along the pipeline continuous transport of machinery, mainly used in housing construction, bridges and tunnel construction.
- Q:What is the difference between a concrete pump and a valve?
- pump and diesel and two major series, to be specific according to your actual situation
- Q:What is the difference between a concrete pump and a concrete pump
- Under normal circumstances, the concrete pump delivery distance, along the horizontal direction can reach 200 ~ 300m, along the vertical direction up to 100m or more.
- Q:What are the requirements for the selection of concrete pump tubing and the setting of the bracket?
- 2 concrete coarse aggregate maximum diameter of not more than 25mm, can be used within the diameter of not less than 125mm of the pump tube; concrete coarse aggregate maximum diameter of not more than 40mm, can be used within the diameter of not less than 150mm of the pump tube;
- Q:Why does concrete pump truck need pipe?
- Pumping tube is a new product present on the concrete market. The main function is to lubricate the pump pipe before pumping the pump, so as to avoid the occurrence of blocking pump.
- Q:How to choose concrete pump concrete pump
- Different, the choice of models in addition to considering the amount of concrete pouring, should also consider the type and structure of the building, construction technical requirements, site conditions and the environment.
- Q:Why does the concrete pump main cylinder check valve damage cause the cylinder stroke to be short and the pumping is weak?
- one-way valve in a set of equipment on the four, generally have a rod on the one-way valve from the role of oil, when a rod chamber check valve damage (such as the normal wear spool can not be successfully opened), in a
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Concrete Pump Truck 145kw (LP90.18.195DU)
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 PCS
- Supply Capability:
- 1500 PCS/month
OKorder Service Pledge
Quality Product, Order Online Tracking, Timely Delivery
OKorder Financial Service
Credit Rating, Credit Services, Credit Purchasing
Similar products
Hot products
Hot Searches
Related keywords