Concrete Pump 24m Boom Mobile Truck Mounted
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 PCS
- Supply Capability:
- 1500 PCS/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Concrete Pump 24m Boom Mobile Truck Mounted
Product Details
Basic Info.
Model NO.:HDT-THB
Type:Concrete Pump
Machining Process:Automatic Controlled Production Line
Certification:ISO9001: 2000, CE
Condition:New
Power:213kw
Egine of Concrete Pump Truck:Weichai Wp10.290
Output Capacity:100/70 Cbm/H
Max. Engine Output Torque:1055n.M
Min.Truning Radius:8800mm
Quantity of Boom:3
Pumping Delivery:19times/Min
Distribution Valve:S Valve
Warranty:12 Months
After-Sales Service:Engineers Available to Service Machinery Overseas
Export Markets:Global
Additional Info.
Trademark:FOCUS
Packing:Standard Packing for International Transport
Standard:ISO9001: 2008, CE
Origin:Zhengzhou, China
HS Code:870590909
Production Capacity:30sets/Month
Product Description
Model | HDT5180THB-24/3 | Chassis Model | SX1165TN561 | |||||
Total Weight | 18460kg | Driving Mode | 4x2 | |||||
Max. Driving Speed | 92km/h | Driver Cab with Air Conditioner, Sleeping Room | ||||||
Wheel Base | No.1 & No.2 | 5600 mm | ||||||
shape | Total Length | 13740mm | No.2 & No.3 | 1310mm | ||||
Total Width | 2490mm | Wheel Tread | Front | 2065mm | ||||
Total Height | 4000mm | Rear | 1850mm | |||||
Engine | Engine Model | Weichai Power WP10.290 | Tire Size | 12.00R20 Radial Tire | ||||
Mini. Turning Radius | 8800mm | |||||||
Driving Brake | Double Loop Air Brake | |||||||
Power | 290PS(213KW) | Boom System | Model | 3 section, Folded, Hydraulic | ||||
Max. Torque | 1055NM | Max. Height | 23.1m | |||||
Emission Standard | EU III | Pipe Diameter | DN125 | |||||
Displacement | 9726ML | Section1boom | Length | 8220 | ||||
Pump Delivery System | Driving Mode | Hydraulic | Rotation | 910 | ||||
Oil cylinder DiameterxStroke | φ140mmx2000mm | Section2boom | Length | 5680mm | ||||
Delivery cylinder DiameterxStroke | φ230mmx2000mm | Rotation | 1800 | |||||
Distribution Vale | S Valve Mode | Section3boom | Length | 5215mm | ||||
Concrete Output in Theory | 100/70m3/h | Rotation | 2680 | |||||
Rotation Range | Any Angles | |||||||
Pump Delivery Times in Theory | 19times/min | Max. Working Radius | 19.1 m | |||||
Max. Working Height | 23.1 m | |||||||
Hydraulic System Pressure | 32MPa | |||||||
Lubrication | Grease self-lubrication | |||||||
Bucket Capacity | 0.7M3 | Oil Tank Capacity | 1000L | |||||
Outrigger span | 4550x2280x6030 | Pipe Clean Mode | Water/Dryer |
- Q: Winter concrete pump pipe Zeyang insulation Yeah?
- Concrete winter preparation for the day when the minimum temperature below 0 ℃, should take the winter construction measures to prevent the construction of the construction work suffered frost damage
- Q: How to determine the concrete pump truck blocking the site
- Pumping system action suddenly interrupted, and there are abnormal sound, the device has a strong vibration, but no corresponding vibration within the pipeline.
- Q: What is the performance of the 60-type concrete pump?
- Maximum theoretical vertical distance m 270Maximum theoretical level of transport distance m 1200
- Q: What is the working principle and structure of a concrete pump truck?
- Pumping device for the piston concrete pump, the use of hydraulic cylinder to drive the concrete cylinder piston for reciprocating motion, with the hopper, distribution valve with the completion of inhalation and removal of concrete, in order to achieve the purpose of transport.
- Q: Will the role of concrete towing pump, concrete raw materials are sand or sand?
- Production of concrete raw materials are sand, which also cement, admixtures, stones, fly ash and so on.
- Q: What are the brands of concrete pump trucks?
- The amount of up to 200m ?? / h or more, greatly improving the pump delivery.
- Q: What measures should be taken in the construction of the underground garage
- 1. In the middle of the garage between the two beams with a sleepers into the channel for the pump on the top of the passage.
- Q: What are the standards for the use of concrete pumps?
- Pumping operation to transfer the end of the transfer pump legs, the first income after the legs, put down the ground wheel, and then receive the front legs;
- Q: How to deal with pumping concrete pump pipe pipe burst after the burst, the pump can not stop the situation?
- There is no universal card, because there is no need.If you do not have a spare tube, you can also find a welding machine, the place where the patch will be patched on temporary work, if nothing, that your work is too poor to prepare, can only clean up the pipeline,
- Q: What are the requirements for the selection of concrete pump tubing and the setting of the bracket?
- 3 delivery pump pipe fittings should be tightly connected to the pipeline to the pipeline should be smooth;
Send your message to us
Concrete Pump 24m Boom Mobile Truck Mounted
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 PCS
- Supply Capability:
- 1500 PCS/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords