• CMAX tower crane with CE ISO certificate QTZ315 System 1
  • CMAX tower crane with CE ISO certificate QTZ315 System 2
CMAX tower crane with CE ISO certificate QTZ315

CMAX tower crane with CE ISO certificate QTZ315

Ref Price:
get latest price
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 set
Supply Capability:
100 set/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Descriptions of our tower crane:

1, QTZ315 have competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition. With their working radius from 3.15m to 71m, QTZ tower cranes are famous for their large operating ranges, varied working methods and wide uses.  

2,This series of tower cranes has a horizontal jib frame, a jib-trolley radius-changing mechanism and a hydraulic self-raising mechanism.

3, It is original in design, reliable in operation and satisfactory in shape.

4,Equipped with all necessary safety devices, these cranes show a good speed-control capacity,, satisfactory operating stability and high work efficiency.

5,They are widely applied for the construction of high-rise hotels, resident buildings, high-rise industrial buildings, large-span factory buildings and tower like buildings like tall chimneys. Best after sales service will be offered which will get rid of all your worries in the purchase of our products

Advantage of our tower crane:

1, boom relief Angle is big, greatly widened the equipment capacity and scope of work.

2, suitable for the group of tower cross homework.

3, boom stability is good, combination amplitude range.

4, suitable for height have special requirements occasions construction.

5, lifting capacity big, effectively solve the high steel structure construction team crane big lifting capacity requirements.

Specification of our tower crane:

CMAX tower crane with CE ISO certificate QTZ315

CMAX tower crane with CE ISO certificate QTZ315

CMAX tower crane with CE ISO certificate QTZ315

CMAX tower crane with CE ISO certificate QTZ315

 

Q:First Summary gets best answer...thanks!
Manslaughter charges come about when it involves death, caused by negligence on someone's part - either the operator, the owner of the crane, the contract, etc.
Q:what would you wish for?also, when your done making your 1000 cranesm what do you need to do next? to like, make your wish come true??
before you start making the cranes, you should research their history. the story of 1,000 paper cranes is in fact very sad. it originated because a young girl was dying from cancer. she started making paper cranes but died before she made 1,000. i think she made around 600 of them. it all harks back to the bomb the USA dropped on japan, the girls cancer was caused from radiation. the crane, in japan, is a symbol of long-life, but 1,000 cranes to me is a symbol of the bomb the USA dropped on japan. i have in fact made several thousand cranes and had an exhibit of them. the girl started making cranes hoping she would live. she did not. before you make a wish on paper cranes, remember than. japanese culture and mythos is different from USA. it tends to have a bite.
Q:Construction tower crane driver (T) Ben can be used as construction crane driver (S)?
Building crane driver (T); tower crane driverConstruction crane drivers (S); construction elevator drivers; neither is common.
Q:I want this as a tattoo but I want to know what it means. Why type of tree is it? What do the symbols translate into?
This okorder /
Q:how does a crane operator's knowledge of where the centroid is generally located for most uniform objects help them perform their job more safely?
Usually it is the rigger who attaches the lifting gear not the crane operator who needs to know about centriods and even then the real trick is getting the slings or other lifting devices in the exact place. That tends to be a bit of trial and error unless the lifting points are clearly marked.
Q:What is the theme of the poem A man to the universe by Stephen Crane?
In the poem “A Man said to the Universe” by Stephen Crane three distinct images appear as the reader relates man and universe as they fit into their cosmic role. The simplicity of the five line poem envelopes man’s perception of his place among the universe, the universe’s perception of its role in the order of life, and the relationship of both man and universe in regards to the enormity of the cosmos. Collectively, these three components create a profound thought on creation. By Folrani Adewale
Q:Ty Crane is the star basketball player for st.francis, what is he doing now? Where is he? Why is he not in the NBA?
Ty Crane is actually at Venice Beach in Los Angeles I just saw him, he was selling his mix tapes, we talked then he said he was Ty Crane the actor from Coach Carter. He smiled eveytime he said he was a movie star. Go to Venice beach by the weights and courts and you will see him there!!
Q:I saw this documentary on ancient buildings like the pyramids and it said that we don't have a construction crane that can life the stones used to build some of these ancient structures.So I gotta wonder how much the strongest crane CAN lift....or is that just fantastical nonsense about cranes not being able to lift those blocks?
Those stones are small compared to what cranes can lift. I did find this Liebherr the heavy equipment company have developed a new all terrain nine axle mobile crane that is the worlds most powerful. The Liebherr LTM 11200-9.1 has a maximum lifting capacity of 1,200 tons with its powerful 100 metre (328 ft) telescopic boom. another: Deira City Centre was the crane’s first lift as it assisted in completing the work in less than 30 hours in what would have otherwise taken an approximate 20 days. The monster machine can lift up to 1,200 tonnes and cover an area over 100m wide. The operational weight is 96 tonnes and the total counterweight is 202 tonnes. Average weight of the stones in the Great pyramid is 2.5 tonnes. So either of those cranes could lift over 400 of these at once.
Q:A heavy concrete panel is being lifted into position in a building by means of a crane (see figure below). The tension of 1.78 x 10^4 N in the supporting cable produces a torque with respect to point O. (Let L = 46.3 m.)
The crane contributes a torque of 495,979.8 Newton-meters. 1.78e+4 * 46.3 * cos(53.0) = 495,979.8 ...but this is not the total (net) torque. There is also a torque due to the weight of the concrete slab - torque we are ignoring since we do not know the weight of the slab.
Q:I have this assignment to find out how a climbing crane is able to move up the building as construction continues.
They add extra stages from the bottom. A tower crane is erected from a boom assembly, first and second tower sections of different cross section, and a base in a sequence of steps in which the boom assembly is mounted on a hollow climbing section dimensioned to be received in each of the larger second tower sections and defining a cavity dimensioned to receive each of the first tower sections. One of the latter is secured on a base in upright position, and the upright section is received in the cavity of the climbing section which is then raised relative to the first section and enveloped by one of the second sections. The enveloping section is secured to the base and the raised climbing section for supporting the climbing section whereupon the first tower section may be released from the base, raised, and secured to the second tower section. The climbing section may then be raised relative to the first tower section to permit the installation of another second section, and the procedure repeated, until all second or larger tower sections are superimposed on each other, the one first section being ultimately attached to the topmost second section. When the climbing section is raised relative to the attached first section, another first section may be superimposed on the one first section and the procedure repeated until the slimmer portion of the tower is assembled from superimposed first sections. Ultimately, the boom assembly is attached to the topmost first tower section, and the climbing section may be removed or stored for further use on the wider, lower tower portion.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords