CMAX Tower Crane TC5516 chinese manufacturer
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 30 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Quick Details
Feature: Tower Crane Condition: New Max.Lifting Load: 8T
Span: 55m Place of Origin: Human China(Mainland)
Brand Name: CMAX Model Number: TC5516
Packaging & Delivery
Packaging Detail: Nude package Delivery Detail: 25-30days
Specifications
● Max.working range 55m, tip lifting weight 1.6T and Max.lifting weight 8T.
● Provide stepless speed regulation. Outstanding in working efficiency, operating stability and reliability,
● Reduce future maintenance cost.
To Lead The Revoluation of International Trade
- Q: dimentions of crane rail, crane beam.
- What kind of crane? There are thousands of types.
- Q: Please write in days, hours, weeks, etc.I need math help!!!!
- If it takes 7*60 + 11 = 431 seconds to make 1 crane, then making one million would take 431,000,000 seconds. There are 3600s*24hr*365.25d = 31,557,600 seconds in an average year. Dividing 431 million by this gives a little over 13 years, with a remainder of 20,751,200 seconds. There are 3600*24*30 = 2,592,000 seconds in an average month. So that gives 8 months with a remainder of 15,200 seconds. There are 3600 seconds in an hour, so that gives 4 hours plus 800 seconds. The 800 seconds = 60*13 + 20 = 13 minutes, 20 seconds. This works out to 13 years, 8 months, 4 hours, 13 minutes, and 20 seconds. Though answers can vary depending on how many days you define to be in a year, and how many days in a month.
- Q: What is YOUR take on Louis Crane's idea of meduso-anthropic principle?
- Well Im not into quantum physics much these days, but in his book Life and Light Lee Smolin proposes that if the quantum theory of gravity has two special features the universe would fine tune itself! If we perturb a Kerr-Newmann black hole so that the new universe will really form on the other side, and that the constants of nature might fluctuate in such a process so that the new universe would have sightly different physics than our own. Its well over my head at this stage; cause Im just an N.Y.U.K. graduate! NYUK NYUK NYUK Anyone wants to read up on it can go to the link below.
- Q: i probably sound like an idiot asking this question :Pis it electricity? fossil fuel burning involved? pulleys? how does the pulley work? any human power involved? specifically, how is it stupid to lift a chair that can be lifted by a person, with a crane?
- A crane is a pulley and using simple machines like wedges, screws, pulleys etc. takes less work.
- Q: How were Churches and really tall buildings constructed hundreds of years ago before the invention of cranes?
- Cranes existed in Roman times. Before that, you just hauled stuff up with ropes as best you could.
- Q: I know how to make cranes and I'm pretty fast at doing so but in pictures I see of crane leis the cranes look like they're folded differently so that they can be stacked on top of each other.. Can anyone teach me how to fold like that so that I can make a paper crane lei?
- But I do different from step 11 on Step 11: Normally they fold along the red line. I dont. On step 10 you see the cross line in the center +. I then fold the right pointy toward the center. Do the same for all. Step 12: I the filp the right top layer to the left, same with the back side. Step 13: fold the bottom point to the top(one layer only) filp to back side, do the same. Step 14: flip right layer to the left again, same with the back side. Step 15: Pull and done.
- Q: I know it sounds like a silly question but I just wanted to know what kind of crane he is because I've never seen a crane with black feathers.
- Red-crowned Crane is a large crane and is the second rarest crane in the world. In East Asia, it is known as a symbol of luck and fidelity
- Q: Today, a crane collapsed on the Grand Mosque in Mecca, killing 87 people. Is God punishing Muslims for 9/11?
- No, just bad work practice and no OHS practice in Arab countries
- Q: I am looking for guidance on determining the optimal design parameters for the design of an overhead travelling crane when considering a span of 60m and a lift requirement of 2500Tonnes. If not possible what would be the maximum lift for the same span
- Is this for a nuclear power station? If 2500 Te and 60m really are the specified loads and span then it is likely that it will be used very seldom. In theory you can design for any load to be lifted but maintenance on a crane system that is used once a year (10 years?) is a real problem. The main items to consider are: Availability of winches and bogies which then dictates running beam and rail sizes. For the spanning beam several alternative sizes needed to be designed and then costed. It will be not just weight but transport costs that determine the most efficient sizes The overall height of the crane will then determine the required roof height assuming that the crane is under cover. For comparison the Harland and Wolf cranes in Belfast called Samson and Goliath can lift 840 Tonnes each. Overall design needs to consider speed of travel, acceleration and deceleration rates and a host of other things.
- Q: I have some cranes in our field next door and I was wondering do they eat chickens? I live in Wisconsin.?
- Nope, cranes don't eat chickens
Send your message to us
CMAX Tower Crane TC5516 chinese manufacturer
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 30 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords