CIFA concrete pump piston DN180
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
Quality Product, Order Online Tracking, Timely Delivery
OKorder Financial Service
Credit Rating, Credit Services, Credit Purchasing
You Might Also Like
Name | Concrete Pump Piston |
Size | SCHWING: DN180/200/230/250 PM : DN180/200/230/250 KYOKUTO: DN230/225/205 CIFA: DN180/DN200/DN230 ELBA: DN200/230 ZOOMLION: DN180/200/220/230 SANY: DN180/195/200/230/260/280 Other sizes and types upon customer’s requirement. |
Material | Polyurethane,Natural rubber |
Application | Used in concrete pump |
Service Brand | Schwing, PM, Kyokuto, CIFA , Zoomlion, Sany, and so on |
- Q: What are the mixing arms of the concrete mixer?
- Mixing arm concrete mixer is a component of the mixing arm itself and divided into lateral mixing arm (positive and negative points), stirring arm (also have positive and negative points), stirring arm below is the bearing seat connected, connected with 4 sets of high strength bolts with stirring arm. The top is equipped with wear-resistant mixing blades, connecting with mixing blades, high-strength bolts 2 sets. In addition, some manufacturers have designed mixing side bonded shaft swivel, is installed in the interval between the stirring arm fixed and rotated in two ways.
- Q: What are the details of construction machinery parts in sand casting?
- (3) equipped with fittings, installation type air switch and air shower room installed in the furnace. (2) all kinds of vehicle tracks, transmitters, differential pressure and buttons are all materials other than the equipment body. (3) rotating filter network circulating water system for equipment, induction phase shifter, manhole and other various products embedded parts, clean bench, meter, scientific research and other functions of the machine, and pipeline safety device, railing, peep hole, ventilation air heater (1):
- Q: What are the main functions of construction equipment monitoring system?
- To date, the console has always been built into blocks, in terms of control functions and number of cameras. Can be assembled according to requirements. In addition, the character generator is also arranged in the total time and address on the console, the date and time, minutes and seconds are displayed by this device, and be put in place to monitor the address and name display. It can be recorded on the video recorder, so that it will be convenient for future reference.
- Q: What is the use of spare parts prices in Chinese market by foreign companies?
- But there is always somebody to ask, just like a college paper, where everyone can read or keep secrets, but collecting them and sending them to foreigners is a sign of treason
- Q: Definition of large mechanical equipment?
- Depending on the size of the part to be machined, the parts must be set up as large equipment with the aid of a crane, and large machinery is usually assembled after the parts have been delivered to the destination. Material handling machinery is mainly in enterprises (including terminals, materials, mines and commercial warehouses, etc.) within the material handling, transportation, lifting, stacking and storage of machinery and equipment
- Q: Where are the mechanical pressurization air supply facilities set up?
- When the smoke proof staircase and antechamber antechamber, fire elevator or common antechamber parts can be opened outside the window, can use the natural ventilation, resulting in a stairwell with or common antechamber in the use of natural smoke exhaust with pressurized air supply arrangement of diversified combinations, and the two exhaust can not be shared.
- Q: Construction machinery production need to deal with what documents?
- Construction machinery production needs for documents are: first, the construction enterprise safety production license application form 1, form three copies; 2, fill in the application form for details of the "instructions" application form "; 3, the legal representative of the enterprise statement" column should be the legal representative signature, enterprise official seal;
- Q: How are buildings, installations and materials divided?
- Provisions on the division of equipment and materials for engineering construction? [answer] the division of equipment and materials in engineering construction is directly related to the reasonable division of investment structure, budget preparation and calculation of construction output value. In order to reasonably determine the project cost, strengthen the investment in the process of construction and management, the equipment and materials in the engineering construction is unclear, especially the universal controversial common problems and put forward the principle of division of fifteen copies of "national unified installation project budget quota" of the equipment and materials are divided, the provinces, autonomous regions and municipalities directly under the central government and the relevant departments of the State Council, the Department should be combined with the local situation, formulate rules for its implementation, and report to the Ministry of construction for the record.
- Q: What is a door rack for a construction site? How high is it generally?
- This depends on the erection of the height of the general 3 steps and within 5-6 yuan a meter, assuming the erection of 4.5 meters high, 22.5-27 yuan a square. This is calculated in accordance with single-layer, the higher the more expensive, 9 meters in 65 yuan or so square. In accordance with the establishment of meters, in accordance with the erection of the volume of the calculation.
- Q: What are the construction materials, components, fittings and equipment in construction?
- Board: cast-in-place slab, prefabricated slab, prefabricated hollow slab, reinforced concrete slab, wood board. The wall, brick wall, concrete wall, roof parapet, wall light. Door: solid wood door, plywood door, steel door. Window: window, wooden window, Aluminum Alloy window, plastic steel window. The building is in addition to other parts of the building and construction of houses built some auxiliary components, such as scaffolding, construction with pipe thread adjuster, building rod, triangle construction support, reinforced joints etc..
Send your message to us
CIFA concrete pump piston DN180
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
Quality Product, Order Online Tracking, Timely Delivery
OKorder Financial Service
Credit Rating, Credit Services, Credit Purchasing
Similar products
Hot products
Hot Searches
Related keywords