• Casting Elbow for Concrete Pump Schwing Putzmeister Sany Zoomlion System 1
  • Casting Elbow for Concrete Pump Schwing Putzmeister Sany Zoomlion System 2
Casting Elbow for Concrete Pump Schwing Putzmeister Sany Zoomlion

Casting Elbow for Concrete Pump Schwing Putzmeister Sany Zoomlion

Ref Price:
get latest price
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
1 pc
Supply Capability:
10000 pc/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

 Casting Elbow  Schwing Putzmeister Sany Zoomlion

 

1.We are a factory which producing concrete pump parts , and we have done many years in the factory with rich experience, the main products include concrete pump pipe, concrete pump elbow, concrete pump reducer pipe, concrete pump flange, piston, rubber hose, sponge cleaning ball, wear plate, cutting ring etc.

2.Our products are Top quality in china which can be used on SCHWING,PM,KYOKUTO,SANY,ZOOMLION

and have been recognized by them.

3.Quality certification of ISO 9001:2000. OEM service available.

 

Specification of concrete pump pipe elbow:

 

1>Material:ST52,20#steel,45Mn2 or as per to your requirements

 

2>Types:our concrete elbows mainly include single wall elbows, double layer(twin walls) elbows,wear-resisting elbows, advanced technology, work life long.

 

3>A wide range of specifications for you.

 

Concrete Pump Pipe Elbow

Type

Singe Elbow

Double Elbow

Model

DN125

DN150

DN175

DN125

Material

Casting Steel ,ST52,20# steel,45Mn2

Inside

40Cr

Outside

Size

R275*90°

R275*90°+110

36°

F2000

R275*90°

R275*90+110

R275*45°

R275*90°+211

R400*30°

A3000

R275*45°

R275*90+211

R275*25°

R275*90°+411

R400*45°

471B

R275*25°

R275*90+411

R275*20°

R275*90°+424

R400*30°

571B

R275*20°

R275*90+424

R275*15°

R275*45°+170

R488*90°

A1000

R275*15°

R275*45+170

R180*90°

R275*45°+310

R500*90

C1000

R180*90°

R275*45+310

R232*60°

R275*45°+310

R280*90°

B2000

R232*60°

R275*45+310

R240*36°

20°Lengthen

R240*36°

20°Lengthen

R240*30°

25°+740

R240*30°

25°+740

R240*15°

40°Zoomlion

R240*15°

40°Zoomlion

R385*29°

R385*29°

R315*33°

R315*33°

Technic

Forged,Casting

Average life

25,000cubic

50,000cubic

Appliciation

Used in concrete transport in construction work.

  

    

 

    

 

 

Q: How does the cement slurry solidify inside the concrete pump?
Be sure to stop the pump, and then add water and detergent to the pump or detergent or other additives, or other chemical reagents, the first positive pump cleaning, and then anti-pump cleaning, repeated several times, and finally
Q: How wide concrete pump truck four support steel feet stretch ?
Legs Longitudinal Span 6825 mm Front Legs Spacing 6200 mm Post Legs Spacing 7230 mm
Q: What is the main composition of concrete pump
The pump body installed in the car chassis, and then equipped with retractable or inflected cloth rod, the composition of the pump
Q: How to choose concrete pump concrete pump
Concrete pouring element concrete pump truck selection should be based on the concrete engineering object, characteristics, the required maximum transport distance, concrete construction plan, concrete pump form and the specific conditions of the line to consider 2. Building type and structure of concrete pump performance Random type
Q: What is the lubrication of the concrete pump before it is transported to the concrete?
the second use of concrete with the same name to the mortar mortar lubrication.
Q: What is the treatment of concrete pump block
When the occurrence of blocking, should immediately take the method of repeated positive and reverse pump, and gradually make the pump out of the commodity concrete suction hopper re-mix and then transport.
Q: What is the role of the one-way valve at both ends of the main cylinder of a concrete pump truck?
cushioning to reduce the main cylinder piston on the main cylinder at the bottom of the impact
Q: How to wash the concrete pump with a ball
First in the pump tubing in the concrete residue washed 1-2 side, then put the ball into the feed port, add water to open the pump, the pump will be with the water through the pipeline, the pipe wall
Q: What is the role of concrete pump truck
The pump body installed in the car chassis, and then equipped with retractable or inflected cloth rod, the composition of the pump.
Q: How does the concrete pump operate?
The suction and discharge process of the concrete is: When the main hydraulic pump drives the concrete piston retracts, the concrete poured into the hopper is sucked into the conveying cylinder through the suction port of the hopper, driven by the stirring blade. When the main hydraulic cylinder moves forward,

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords