• Casing Screw Machine for the production of screws System 1
  • Casing Screw Machine for the production of screws System 2
Casing Screw Machine for the production of screws

Casing Screw Machine for the production of screws

Ref Price:
get latest price
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
100 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

1. Overview

 

Casing screw machine is our screw-machine series product. The whole machine consists of two parts. First, the host is made up of master tongs,back tongs ,a platform,a hydraulic system, a fuel tank, a radiator. Master tongs and back tongs are epicyclic gear and epicyclic claw four point chucking structure. The advantage of this structure is flexible in action, safe and reliable, high-efficient .It is used in national major oil fields widely.We researched and developed hydraulic automatic shift device,and then applied for National Patent.Because the screw machine can be operated by only one person ,it increases working efficiency and reduces the cost of production. According to the actual difierent length of the tubes ,back tongs whose speed can be self-operated control are shuttled in the slideway. Second, the platform is composed of electric appliance elements,and the safe voltage is 24-volt DC(There is a hydraulic directional control valve in Hand-Over-System . According to the needs of users,we can install torque displayer PLCand IPC).

 

2. Technical parameters

 

Local latus rectum: Φ380mm;

Applicable scope: Φ140 mm --370 mm;
High-gear rated torque: 15(KN.m); 
Low-gear rated torque: 35(KN.m);
Rated Maximum speed: 51.6r/min;
Rated minimum speed: 22r/min;
System pressure: 20Mpa
Maximum flow rate: 126L/min;
vol. L/W/H Length/Width/Height: 5.1 m×2.1 m×2.0 m; 
Total Power: 22kw


3. Usage Instructions
    

A) Before start the machine, you should power on ,affirm that the ammeter and the voltmeter are normal.For example ,if too low voltage(below 360V),you should stop the machine and check that whether the power wires are open phase.

 

B) After powering on normally(except manual reverse rod),firstly switch electromagnetic relief valve

on (starting and stoping the machine).After the machine work normally,it is time to get ready to work.(If the temperature is too low in winter, the machine should idle for a few minutes and close switcher boost (electromagnetic relief valve).


C) According to the routine operation formerly, the direction of tubing coupling(the drive line must be in the middle of the hole of the binding clip)should be from the back-up tongs to the head of the master tongs.First of all ,the pipe joint should be cliped through the master tongs.In order to make-and-break rotary , clamp by the back-up tongs , and then clamp by the master tongs.(The correct direction of the epicyclic claw is that the pipe climbing up . After completing a program, the maste tongs turn around for one time in the opposite direction,( open vents) and then open the back-up tongs.Waiting for the master tongs and the back-up tongs loosening completely and coming back to the center position,it is ready to do the next work.

 

D) In principle you shlud choose high voltage (5 Mpa generally). Because the difference from new and old pipes here and there and the different demands,you can increase the voltage (The most economic voltage is 5-8 Mpa). During operation you can switch between high voltage and low voltage anytime.After finishing the operation in low voltage (old pipes) ,it can switch to the high voltage immediately(increasing production efficiency).

 

E) If sometimes shift impediently during operation, the problem may be that the gear and the gear backlash don’t bring together mainly.At the time master tongs budge to the opposite direction,just shift out.In order not to disconnect the gear ,you may fix shift-turn-knob on the gear that you want,which don’t affect other hydraulic circuit.

 

F) Because of the different links in the production chain,it is possible to await materials during regular work.A t this moment the machine can idle.If awaiting materials too long,it is better to power off,as cooling down the oil temperature and saving electric energy.In conditional field,it is better to adopt cool circle to keep the proper oil temperature for regular work (5°--55°±5°).

 

4. Maintenance and Repairing

 

1) Please keep the jaws clean everyday.If there are many oil stain and other dirty things,they will affect the result of using at last,and also will scratch the  surface of the pipes.

 

2) There are two reasons that the epicyclic claw isn’t flexible and doesn’t come out sometimes.First, when the tube goes into the machine, the epicyclic claw doesn’t come back. Then it will appear high and low and be held back when coming back as soon as it bumps badly.Second, the friction liningsare worn badly, the pressure plate spring is disabled.The spring can precess properly, or you can change the friction linings and the pressure plate spring necessarily.Make sure that keep the friction linings clean when changing them.Don’t spot oil stains,otherwise the epicyclic claw will be disabled.When adjusting the pressure plate spring, just make sure the epicyclic claw can come in and out freely.Don’t be too tight, so as not to impact the live time.

 

3) The jaws of the machine can be uesd four times.Because it always works with one type of pipes,the frictional part only focus on a point and other parts are in good shape.Until the jaws can never work, you could screw off the bolt on the jaws,tap out the dowel,transpose the jaws by180= and screw it on again.At the time,just change only one dowel(after transposing the direction, there is only one hole in the jaws.)In addition the master tongs and the back-up tongs can be exchanged,namely,the jaws make towards the back-up tongs after the master tongs were exchanged two times.(because of different pipe diameters)By the way,when you exchange the jaws,please don’t take down other spare parts,just hold out the epicyclic claw.

 

4) If the machine runs quaveringly  too long, sometimes the connection(solenoid valve) will be loose or the oil seal will leak.In these situations, please screw or exchange a new oil seal immediately and aperiodically look over the box of the solenoid valve , keep its internal clean and  make the electrical plug safe lest loose contact . For example, a electrical plug is loose, the electromotion becomes invalidated.The reason isn’t only hydrolics failure,but also the damaged electrical plug .Just change the same type (DC 24 V).

 

5) Please keep hydraulic oil clean,prevent water from infiltering the oil box.Once the oil has contained water,the oil will be emulsified.It will make a impact on the machine,such as a loud noise . In such case , you should change the oil.If normal working indoor, you should choose YA-N46 common economical hydraulic oil .Its working life is 3-4 years,If the pump work with a loud sudden noise after a time, you should open the fuel tank cap ,screw off the oil strainer and washing it.(It means that there are too many well cuts.)

 

6)The gear of the mechanism,the sliding bearing and the rolling shaft should infect oil  aperiodically ,so as to keep the gadgets normal in working life.

 

7) It is normal to be wear and tear on the working parts( such as electric appliances,pipelines,gears and valve body.But pliers are in direct proportion to the production and proper operation (about 2000~3000 times per piece).Please change the frictional plate and the brake sheet steel momentarily in the event that they don`t meet the demands(because the frictional plate is too thin.)

 

8) When the master tongs and the back-up tongs must be taken down,please notice that the slidable needle roller of the master tongs’ head should not be losen,and  the direction of commutating tooth of epicyclic gear should not be changed(There is a mark of the center-punching in the direction of every commutating tooth.Otherwise it will cause different angles after extended.)

Q: What are the platinum metal processing equipment?
Platinum alloy jewelry parts production, organizational connection: ring changes and defects repair, mainly through welding to complete.
Q: What do metal processing machines include?
Foundry equipment: stamping equipment, lathe, milling machine, molding machine, trimming machine, punching machine, special purpose machinery; metal cutting machine: drilling, reaming, metal cutting, cutting, trimming, gear cutting etc.;