• Cable Accessories Separable Connector, Plug-in System 1
Cable Accessories Separable Connector, Plug-in

Cable Accessories Separable Connector, Plug-in

Ref Price:
get latest price
Loading Port:
Shekou
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

RU 200 A 15, 25, and 35 kV Loadbreak Elbow Connectors and Accessories are submersible, fully-shielded and insulated plug-in terminations, ideal for connecting underground cable to transformes, switchgear, sectionalizing cabinets and junctions. These connectors are molded using high-quality, peroxide-cured EPDM insulation for reliable field performance.

15 kV and 25 kV loadbreak elbows are available with an integral jacket seal for use with concentric neutral and other types of shielded cables.

All 200 A loadbreak connectors meet the electrical, mechanical, and dimensional requirements of IEEE Std 386™ standard and are designed to be fully interchangeable with other major manufacturers currently complying with IEEE Std 386™ standard.


Q: Four lines only reached a phase line, at the other end all charged, I use the digital pen! In addition, I often check the cable when the cable current through the dot digital pen voltage symbols sometimes have time to disappear, in other bare wires when the test keys are normal! What is this going on! Ask the heroes to give the younger brother a complete point of the answer! More
Bookstore tool book should have "communication project budget", I do is what you say, the budget is divided into estimates and budget, is two steps. So that is not very clear. But what is needed is the preliminary design of the project. The budget is needed for design and drawings. Internal management of this piece, the main thing is that you need to do what the project department, and are generally very complicated
Q: What brand of cable is good, what are the top ten brands of wires?
Mainly to distinguish the ground which is the ground, the color of the ground is generally yellow-green; wire two is the fire line L and zero line N, no ground wire, look at the plug on the LN mark, the corresponding good.
Q: Apple 6splus charge may not support this accessories how to do more
When the lighting circuit and the power circuit shared ladder, BV line is not allowed to put in the ladder, so it is recommended to use the wiring of the lamp ZC-YJV-3 * 2
Q: What machinery is required to make wire and cable?
Oh, the pipeline is poured before the layout according to the design drawings.
Q: Do not know why not mislead. The The The The The Fire resistance is IECGBBS6387. GB is the general principle of flame retardant and fire resistant wire and cable, quoted the above criteria...........................
Directly to find Dell customer service bar, the general warranty period are free replacement, unless the insurance of the. You can extend the warranty period, it seems you like to do the experiment.
Q: How to determine how much wire and cable should be used, the current load and how the corresponding wire, such as 4BV, under what circumstances, YJV240 what circumstances, the load is much more
After the opening is not, if not open like a downstairs to delete the C disk file on the line, if the boot is necessary to set up, sit down little hands and feet.
Q: Cable a fire line power and why the other did not pick up the line with a pen test also have electricity? Answer detailed point
Megohmmeter, such as measuring insulation normal, that is, induction power, the other line after grounding, the pen measured no electricity.
Q: Apple mobile phone does not support this charge when charging this thing how to charge
Charging line and the phone does not match, for the good point of the line just fine
Q: This cable or accessory has not been certified and may not be able to work with this iphone reliably
The installation process is a certain requirement, high and low voltage cable bridge should be installed separately as usual, a wall laying vertical pipeline (slot) or installation equipment, the power distribution between the depth of D1 = 1200 ~ 1500mm; weak Between the deep distance from the D2 = 1100 ~ 1400mm more reasonable. The length L1 and L2 between the power distribution and the weak can be determined according to how much electrical equipment and pipelines (slots) are installed in the room. "Civil building electrical design specifications" proposed "shaft size in addition to meet the wiring spacing and terminal box, distribution box layout must be the size, but also in the box before the left not less than 0.8m operation, maintenance distance" requirements. In the weak equipment, the operation and maintenance distance is not specified in the provisions of the Code for Electrical Design of Civil Buildings, but it should not be less than 0.8m. Cable to wear steel pipe wiring, should be reserved in the floor steel pipe, wiring should be completed after the plug fire fire blocking material. Cable bridge installation should be horizontal, the maximum sag should not be greater than 10 mm; proposed separate installation
Q: If you want to sell wire and cable, then what to do in advance to detect? The The The The The
To be considered is the Great Wall power line is not long enough, the power is not big enough to see the power on the label, if the 12V to 15A or more I think will be more stable, my Dell machine power cord surprisingly short, but also To buy the extension line again.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords