Auto Green Universal Laptop Charger 90 Watt with LCD Display
- Loading Port:
- China Main Port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 100 Pieces pc
- Supply Capability:
- 5000 Pieces per Day pc/month
OKorder Service Pledge
Quality Product, Order Online Tracking, Timely Delivery
OKorder Financial Service
Credit Rating, Credit Services, Credit Purchasing
You Might Also Like
Product Features of Auto 90W Green Universal Laptop Charger With LCD Display:
1) 7 Voltages Auto-Detection
2) 9 output pins
3) 1 LCD Display
4) Max Power: 90W (For Home use)
5) Certification:CE,FCC,RoHS
6) efficiency >85%
7) Product Size: 125*53*30MM
Safe protection:
Over Current Protection
Over Voltage Protection
Short circuit Protection
Over Heat Protection
- Q: How many can you bring with 220V? How many can you bring with 380V? There are 3 terminals on the transformer. There are 220V, 380V, 0, three terminals. 220V is the 220V terminal and the 0 connection. How can the 380V be connected? Is it 380V and 0 or 380V and 220V?
- Now is the three standard power supply, fire, fire and a single, zero line is three 220V, the fire is 380V. 40W lights can be 25.
- Q: What type of low voltage transformer should be adopted for safety lighting power supply?
- Isolated transformer, once 380V or 220V, two voltage, 36V, 24V, 12V, several categories, do not allow the use of autotransformer.
- Q: 1000 square meters low voltage.36 volts lighting power supply with multiple transformers and wires
- You must know the quantity and power of the lamp to determine the transformer
- Q: Why is the two side of the lighting transformer grounded?
- In the three-phase transformer, the neutral point of the three-phase transformer and the metal case are always reliably connected, and the utility model has the advantages of reliable grounding, both working grounding, protection and earthing, and protection of personal safety and equipment safety.
- Q: Why is elevator lighting transformer installed?
- 1) a lamp shall be installed at the highest and lowest point 0.5m away from the hoistway, and a light shall be installed at intervals not exceeding 7m, and a control switch shall be installed in the engine room and the bottom pit respectively;2) the lighting power supply for car top and hoistway shall be 36V; when 220V is adopted, the residual current action protector shall be installed;3) there is no lighting device for a closed well road with sufficient lighting conditions around the hoistway.
- Q: How many A leakage protection switches are used in 5000VA lighting transformers?
- According to the working principle of the protector, it can be divided into three kinds: voltage type, current type and pulse type. The voltage protection device is connected to the transformer neutral point and the ground, when the electric shock when the neutral point voltage offset to the real estate, in order to make the action to protect the power off, but because it is the protection of the transformer low voltage network, cannot be classified protection, so the power range is large, frequent moves, so has been eliminated. The pulse current protector is a sudden change in the phase and amplitude of the three-phase unbalanced leakage current when an electric shock occurs, which is used as an action signal, but also a dead time. The current type current leakage protector is widely used, so the protector of current type is mainly introduced below.
- Q: Does the lighting work properly? Doesn't that power equipment start voltage unstable?
- It is not easy to control, the power and lighting and electricity; if the transformer capacity is small, and relatively large power equipment start frequently, voltage stability will be poor, the lamp brightness will fluctuate dramatically, have effect on visual acuity. But as long as the design is reasonable, it has little effect.
- Q: How is the lighting power of the 380V transformer calculated?
- Special transformer power transformer (electric furnace transformer, rectifier transformer, power frequency test transformer, voltage regulator, transformer, audio, mine variable frequency transformers, high frequency transformer, transformer, instrument transformer, impact power transformer, reactor, mutual inductor etc.) circuit with T symbol number. For example: T01, T201 etc.
- Q: Why can't autotransformer be used as transformer for safety lighting?
- The main and auxiliary coils of the autotransformer have common parts. Once the short-circuit is made, the lighting circuit is directly connected with the high voltage circuit, which is very dangerous
- Q: Please tell me how to calculate the transformer in the lighting circuit of elevator shaft in building electrical design
- Pe=19.5KW, installed capacityKx=1 coefficient of demandPjs=KxPe=19.5KW, calculated loadCOS, phi, =0.85, power factorIjs=KxPe/3/220/cos phi (Ijs calculates current, voltage, 380V/220V, three-phase)=1*19.5*1000/3/220/0.85=34.76A
We not only respond to current requirements, but we also anticipate their emerging needs. We warmly welcome customers from all over the world to contact us and establish business relationships for a better future.
1. Manufacturer Overview
Location | Shenzhen, Guangdong, China |
Year Established | 2006 |
Annual Output Value | US$5 Million - US$10 Million |
Main Markets | North America; South America; Eastern Europe; Southeast Asia; Africa; Oceania; Mid East; Eastern Asia; Western Europe; Central America; Northern Europe; Southern Europe; South Asia; Domestic Market |
Company Certifications | ceritificate of ROHS compliance; ceritificate of emc compliance; ceritificate of lvd compliance |
2. Manufacturer Certificates
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability
a) Trade Capacity | |
Nearest Port | Shenzhen |
Export Percentage | 81% - 90% |
No.of Employees in Trade Department | 21-50 People |
Language Spoken: | English, Chinese |
b) Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Auto Green Universal Laptop Charger 90 Watt with LCD Display
- Loading Port:
- China Main Port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 100 Pieces pc
- Supply Capability:
- 5000 Pieces per Day pc/month
OKorder Service Pledge
Quality Product, Order Online Tracking, Timely Delivery
OKorder Financial Service
Credit Rating, Credit Services, Credit Purchasing
Similar products
Hot products
Hot Searches
Related keywords