Auto-Climbing Formwork Used in CONSTRUCTION FORMWORK SYSTEMS
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 m²
- Supply Capability:
- 10000000 m²/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Concrete Formwork Aluminum Climbing System Description
1.Product Name: Alu climbing system
2.Material: 6061-T6 aluminum alloy
3.Product Application: core wall/cooling tower/tunnel/dam/pier/underground liner
4.Inspection: Pre-assembly to check the accuracy of the materials.
Concrete Formwork Aluminum Climbing System Advantages
1. Improve productivity and minimize labour
2. Reduce construction cycle tiem
3. Less wastage of plywood
4. High recovery value for the used materials
5. No nails needed
6. Since the whole system lifting, no small parts loss
7. Materials versatile
8. Easy and Fast operation
Project Construction Sites
1. Structure of Cantilever Formwork Description
Cantilever Formwork is mainly used in the concrete pouring of pier, high buildings, and so on. The concrete lateral pressure is entirely supported by anchor system and the wall-through tie-rods, additional reinforcement is not needed. The construction is easy, rapid and economical. A single pouring height is high and the finished concrete surface is perfect. Cantilever formwork has several types, the structure is similar, and has its own different characteristic. Can use them according to actual demand.
Main cantilever Formwork:PJ200 & PJ240,CB-240 etc.
2. Main Features of Cantilever Formwork
-easy to assemble
-simple structure.
-easy, rapid and economical.
3. Cantilever Formwork Images
4. Cantilever Formwork Specifications
Anchor system
Anchor system is the most important supporting part. The system is made of five parts shown below. There into, tensile bolt, anchor shoe and bowl-climbing cone can be taken out for reusing after the concrete pouring.
① Tensile bolt M30/L= 110
② Anchor shoe
③ Bowl-climbing cone M30/D15
④ High-strength rod D15
⑤Ancor plate D15
5.FAQ of Cantilever Formwork
1) What can we do for you?
.We can ensure the quality of the Cantilever Formwork and avoid extra expenses for customers.
.We can provide you the professional technical team.
.We can provide professional building proposal for your projects.
. Please feel free to customize.
2) What promises can be done by us?
. If interested in this kind of formwork, please feel free to write us for any QUOTE.
. If need any technical and building assistance, we could provide on-site professional staff for instruction.
. Please DO check goods when courier knocks your door and contact us asap if any issueS.
3) What about of our after-sale services?
. Response will be carried out in 24hours after receiving any complain or request.
. Any formwork cost can be refund after order is confirmed.
. If the products are not based on the requirements, there will be the relevant compensations made for you.
4) What about the package and shipping time?
.Packing: wood package and adhesive tape
.Shipping: by sea
Shipping time: Normally small orders, it just1week business days to arrive your hand; When comes to the customs declaration, it may need 2weeks.
- Q: Construction Engineering, moving equipment and stationary equipment, respectively
- Moving equipment refers to the rotating equipment driven by a drive (i.e., equipment with energy consumption), such as pumps, compressors, fans, etc. the energy can be electric power, pneumatic power, steam power and so on. Moving equipment refers to the main components of the movement of machinery, such as various filters, crushers, centrifuges, rotary kiln, mixer, rotary dryer and fluid conveying machinery
- Q: What are the details of construction machinery parts in sand casting?
- 9. (2) all kinds of cables. (4) either in production or life or attached to the building water pump, cabinet and equipment brought with all equipment, busbar support porcelain ramming material, manufacturing units or commissioned the construction enterprises in the construction site of the factory or production equipment, valves, acid. (2) a variety of metering device, especially the universal controversial problems put forward the principle of classification, dynamic, containers and other equipment, such as mechanical transmission, electrical, ladder, refractory lining, tower, is directly related to the investment, a reasonable division of various air conditioners, socket, heat exchanger, and the telegraph facsimile equipment, perlite, furnace metal embedded parts are the equipment. 7, transportation.
- Q: What are the sectors of machine building and parts processing?
- Industry to classify, it is not very strict. For example, the insurance industry, mining, energy, food, hotels, real estate services industry, garment industry, advertising industry, aerospace, aviation, chemical, chemical, construction, health care, education, training, computer, metal smelting, fire, police, soldiers, accounting, beauty, body, media, publishing, wood, paper retail, wholesale, agriculture, tourism, justice, lawyers, sports, sports, arts, entertainment, medical, art, design, banking, finance, Internet, music, dance, postal, courier, transport, consulting services.
- Q: Changsha Sanlian Building Machinery Fittings Factory
- The company in Changsha Hongdun business online can not find, provided by his address: two Changsha section of Xingsha Economic Development Zone Yuan Ming Road, I checked 114 specially call 12580 to booking the hotel near the road, not the road. Definitely a liar.
- Q: What is the use of spare parts prices in Chinese market by foreign companies?
- But there is always somebody to ask, just like a college paper, where everyone can read or keep secrets, but collecting them and sending them to foreigners is a sign of treason
- Q: What are the mechanical drawing software?
- The 3D map only contact with SolidWords and Pro/E, Pro/E is better than Solidwords in general, but Solidwords is very simple to use, see Help tutorials you can learn to draw a three-dimensional map is not particularly complex easily to estimate a few days is enough. But any one of the two kinds of software, want to do not understand the words, expert advice is not really easy. UG and MasterCAM haven't touched much, but I've heard that it's suitable for processing stereogram.
- Q: Construction machinery production need to deal with what documents?
- The person in charge of the enterprise, the person in charge of the project, full-time safety management personnel in "safety assessment qualified" column content according to the "three persons" Safety Assessment Certificate (fill in the contents of enterprise work safety management staff should meet the enterprise production safety management, the safety management department staff with the qualification to the total contract for not less than 5, not less than 3 professional contracting labor subcontracting, not less than 1; the construction site should be equipped with full-time safety management personnel according to the project size can be determined, according to the construction area of less than 10 thousand M2 project has at least a part-time staff of more than 10 thousand M2; project 1 - 2 full-time staff; more than 50 thousand M2 large sites, according to different professional safety management group);
- Q: Where does Heilongjiang do the most construction machinery?
- All of the industry designated product range is roughly the same as that of China engineering machinery and other countries are also increased the railway engineering machinery, forklifts and industrial handling vehicles, decoration machinery, elevator, pneumatic tools and other industries.
- Q: What are the sub projects of a construction project?
- Appendix B Construction Engineering Division (sub branch) engineering, sub project division, B.0.1 Construction Engineering Division (sub branch), engineering, sub projects can be divided into table B.0.1. Table B.0.1 division number of construction works, sub works and sub projects
- Q: What functions should be achieved in mechanical structure design?
- The function of the mechanical structure is mainly realized by the geometry of the machine parts and the relative position between the parts. The geometry of a part is made up of its surface, and a part usually has a number of surfaces, some of which are in direct contact with the surface of other parts, and this part of the surface is referred to as the functional surface. The connecting part between the functional surfaces is called the join surface
Send your message to us
Auto-Climbing Formwork Used in CONSTRUCTION FORMWORK SYSTEMS
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 m²
- Supply Capability:
- 10000000 m²/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords