• Angle Sweeper Manufacturer, Angle Sweeper Loader, 4 Wheel Loader Sweeper System 1
  • Angle Sweeper Manufacturer, Angle Sweeper Loader, 4 Wheel Loader Sweeper System 2
  • Angle Sweeper Manufacturer, Angle Sweeper Loader, 4 Wheel Loader Sweeper System 3
Angle Sweeper Manufacturer, Angle Sweeper Loader, 4 Wheel Loader Sweeper

Angle Sweeper Manufacturer, Angle Sweeper Loader, 4 Wheel Loader Sweeper

Ref Price:
get latest price
Loading Port:
China main port
Payment Terms:
TT or LC
Min Order Qty:
1 set
Supply Capability:
100 set/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Quick details:

Condition: New

Model Number: KFS750/2500L

Place of Origin: Austria

Type: snow blower loader

Moving Type: Wheel Loader

Dimension(Long * Breadth * High):7800X3000X3350mm

Rated Load: 10.5 ton


characteristics of 5ton wheel loader :


It drived by Chaogong superior loader. snow removal capacity are 1000t/h 

  1. 1.hydraulic sweeper is an economical way cleaning equipment. With a reversible motor, rotating the broom forward or backwards is no problem.

  2. 2.Hydraulic driven bevel cleaner can be installed on skid steer loaders, tractors and other machines.

  3. 3.We offer the brooms in a power angle or a manual angle. 

  4. 4.skid steer loader attachment road sweeper angle broom,mechanical broom sweeper,snow broom sweeper

  5. 5.easily to  operate,can turn left or right 30 degrees

specification of the wheel loader:

Angle Sweeper Manufacturer, Angle Sweeper Loader, 4 Wheel Loader Sweeper

Angle Sweeper Manufacturer, Angle Sweeper Loader, 4 Wheel Loader Sweeper

Angle Sweeper Manufacturer, Angle Sweeper Loader, 4 Wheel Loader Sweeper

Angle Sweeper Manufacturer, Angle Sweeper Loader, 4 Wheel Loader Sweeper

Angle Sweeper Manufacturer, Angle Sweeper Loader, 4 Wheel Loader Sweeper


FAQ:

1.How about the shipment?

You can put 2 sets of of wheel loaders in one 40HQ container. The spare parts are packed with boxes.

The delivery time is 20 days. 

2. What about your service?

We have our factory, we can meet customers needs as soon as possible.

We have first rate professional technology and provide good after-sales service.

3. What Can we Do For You?                                                                 

1.Installation Services

Installation Services are available with all new machine purchases. We will provide the technical know-how for your 

operation smooth transition and support for installing, debugging, operation of the machine, it will indicate you how to use this machine well.

2.After Sales Service

We offer the Preventative Maintenance and After Sales Service. For we strongly feels about the importance of supporting our customers and the product solutions we provide. Consequently we offer comprehensive maintenance options to prevent equipment issues before they become problems. Also we offer one year guarantee period.  

Q:i have a fx 4100 quad core. and i want to know what is the intel equivelent.AMD Bulldozer FX4100 3.60ghzmy friend said it was a i5. but is that right?
No, okorder /
Q:How about Shandong bulldozer
I have also Shandong Shantui bulldozer bulldozerThe heart to say good quality and Shandong shantui. Shandong car
Q:BulldozerHappinessMorningMirror
While walking near a construction site, the scary bolldozer was staring me down. The happiness just floated through the room. Yesterday morning, my alarm clock bellowed for me to awaken from my deep slumber. The mirror stared back at me.
Q:AMD FX (bulldozer) eight core eight threads, or Intel (core / Xeon quad core eight thread), or Intel (Intel Xeon 16 / eight) nuclear thread?
That is a good FX is a Zhiqiang, waste a lot of electricity, the temperature is too high
Q:Two ash macadam base construction, leveling machine and bulldozer leveling method
1. two ash macadam construction process of lofting, Peilu shoulder, clean road. The sprinkler, transport, two ash gravel hanging line, paving, initial pressure, Dianbu, final pressure, inspection, watering.2. preparation2.1, two ash gravel before paving, should be at the bottom of the appropriate watering, keep wet.2.2 according to the road line, base width, median size and shoulders filling, hanging line construction excavator or artificial earth tank. The soil tank height takes more than two gray gravel virtual height, and the vertical straight cut, which has a certain degree of compaction soil trough, prevent spreading or compacted soil trough will squeeze, two ash gravel material waste.2.3 every 10 meters, vertical curve section longitudinal every 5 meters on both sides of the road to nail vertical side pile measurement in two ash macadam paving process at baseline and review the construction elevation and elevation of loose paving, so as to avoid mistakes.2.4 before unloading, according to the actual measurement of paver thickness and section area calculated base every 10 meters to extend the discharge amount of data will give materials, so that material member can accurately direct discharge to meet the needs of paving, to avoid a scene in the two bad or process is too long to push soil the phenomenon of (material and check the material quantity, time does not appear to measure the phenomenon).The finished materials present two ash gravel mixture basically buy, so when the feed should be timely to the manufacturers for product certification and raw materials two ash gravel lime magnesium content, gravel crushing value and other related test documents. In the process of acceptance on content and content of fly ash mixture containing the check, if the water content and content of fly ash is larger, which will affect subsequent paving, leveling, compaction, impact on the intensity of two ash macadam.
Q:What do you think of this Have you used it and what results did you get?
Bulldozer XL5000 is an amazing product that will produce amazing results. It is a very under rated, because it is popular in the underground gym world. The company does not advertise in magazines for example to keep pricing controlled at this exceptional quality. They rely on word of mouth, which is how I became aware of it, working with many natural bodybuilders. Few pre workouts out there contain BCAAs (at 2:1:1 ratio), Glutamine, Glycine, Beta Alanine, Citrulline Malate, Carnitine-L-Tartrate for example. There are few pre workouts that do not hide their formula and do not use proprietary blends. This is also one of the few products that can be used as Pre, Intra and Post workout. This is a money saver too, as you don't need to purchase additional products or ingredients to mix with it. You will love this product the way many have. Your recovery will sky rocket, your stamina will become exceptional, strength and pumps are amazing.
Q:what would it be?
I would have to say either sky dancers or my gigapet...miss those days!
Q:Is bulldozer fx4170 the strongest quad core of AMD? Is I3 3220 able to beat all AMD quad core?
FX4320Slot type: Socket AM3+Production process: 32 nmCore number: four coreType of application: desktop computerMemory controller: DDR3 1866MHz64 bit processor: YesIntel positioning and technology is different from AMD, in dealing with multitasking and floating point computing situation, it is better than AMD, but not to say that AMD is worse than Intel, mainly to see the application, AMD in the game is an advantageThe high frequency of course not see them the higher frequency can bring faster processing speed, but due to the limitation of AMD framework, the high frequency and can not play all the performance, how to say, like Hercules bikes, pedaling faster but also run the motorcycle
Q:What is the salary for a bulldozer operator in a forest fire?
It depends on where you live. We have a construction company. Our Dozer operators here in the South make about $17-$18/ hr. If you are in a dangerous situation then I would expect to get at least $35/hr. plus more if you are working OT or weekends.
Q:I need to get rid of tree that's crucked and keeps growing towards the road.It's dangerous for cars and plant a different one, but I wan't to kill it first.What are the fast ways of doing it?
i don't understand how it is dangerous for cars. if it was i would have expected a car to have knocked it over. and what is the worry about killing it first? just cut the tree down and plant a new one.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Hot Searches

Related keywords