Steel Grab Mmachine, Front End Loader with Steel Grab, Wood Grapple
- Loading Port:
- China main port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 1 set
- Supply Capability:
- 100 set/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Quick details:
Condition: New
Brand Name: CCMG
Model Number: LW350
Place of Origin: Liaoning, China (Mainland)
Type: Front Loader
Moving Type: Wheel Loader
Dimension(Long * Breadth * High):6675x2470x3060 mm
Rated Load: 3000 Kgs
Certification: CE, GOST-R
Warranty: 12 months or 2400 hours
After-sales Service Provided: Overseas service center available
Engine power: 90 KW
characteristics of 3ton wheel loader :
Adopt Cummins 6 cylinder engine with 97KW output power and high torque, strong excavating capability.
Full dydraulic steering system, merging of double pump, energy saving and high work efficiency.
Increase the counterweight, improve the stability and bearing capacity of the complete machine.
Reinforcement structure. Strengthened front and rear frame.
Joystick control realized precise operation, air conditioner are option.
Joystick control realized precise operation, air conditioner are option.
wheel loader Optional:
* Joy Stick
* Air conditioning
* Tyre chain
* Quick hitch
* Yuchai or cummins engine
* Electronic hydraulic gearbox
* Adjustable steering wheel
* New adjustable seat
* 1.5m3 rock bucket and 2.2m3 lightweight bucket
specification of the wheel loader:
FAQ:
1.How about the shipment?
1. The loader machine load one 40HQ container.
2. The loader disassemble into 3 parts, major machine, bucket and cabin.
3. Before shipment, we have done the rust-proof and antiseptic treatment.
2. What about your service?
We have our factory, we can meet customers needs as soon as possible.
We have first rate professional technology and provide good after-sales service.
3. What Can we Do For You?
1. During the period of 12 months or 2000 working hours warranty, Chaogong factory are responsible for maintenance and replacement of spare parts.
2. We attend the machinery exhibition in your country and please contact us when we are with you at that time and solve the problem you have.
3. For the sole agents, we will go with senior engineer to your country and offer the technical service.
- Q: Why can't cranes, bulldozers, and the like run too fast? Too far?
- Don't run too fast: the engine doesn't lift; you can't run too far: the tank isn't big enough.
- Q: Will they finally use bulldozers to clear the streets of Bangkok and restore peace?
- i really wanna go
- Q: HELP!?! WAT DO I DO SHES STUCK IN THERE WITH A TON OF DIRT AND IM AFRAID IF SUM OF THE ROCKS POKE HER EYEBALLS OUT !!!!!
- Go duel the bulldozer
- Q: I was gong to get either a Amd phenom x4 or x6 processor but now I'm thinking if should waif for the new oneQ1 should I wait and get the bulldozer chipQ2 when will the chip be releasedQ3 will the phenom work on a am3+ motherboardQ4 can you find me a good am3+ motherboard I will be using SATA 6gb/s I won't be using usb3and I would like 2x pci e 16 slots
- If your adamant on going AMD then yes wait for bulldozer Release is set for august or september (It was supposed to be june but there were issues) Yes AM3 cpu's will be compatible with AM3+ motherboards I wont suggest a AM3+ motherboard as the current motherboards available are not true AM3+ motherboards as they use the 800 series chipset and only the upcoming 900 series chipset give true support for all the features of the bulldozer chip. Edit: Just noticed there are some 900 series chipset motherboards released so if you intend to get an AM3+ motherboard make sure it has a 900 series chipset as they were designed specifically for the upcoming AM3+ cpu's
- Q: How large is the power of a bulldozer?
- The power of the bulldozer corresponds to its model, which is the national standard.Generally, the types of bulldozers are as follows:TY120, TY140, TY160, TY180, TY220, etc..
- Q: Two ash macadam base construction, leveling machine and bulldozer leveling method
- 4. certificate and test items to be collected(1) material certification should be collected: two ash crushed stone;(2) test test: compaction degree (sand filling method, irrigation method), two lime gravel, lime dosage, two ash crushed stone, unconfined compression. 5. mechanical and manual mechanical consumption type: dump trucks, bulldozers, loaders, graders, vibratory roller, roller, a sprinkler, a ton of mechanical consumption over two ash gravel is divided into two layers: when the bulldozer bottom 5000m2/ team, bulldozer grader 5000m2/ 3000m2/ top team, team roller, 5000m2/ stage, 5000m2/ stage loader, sprinkler pump 40t/. Artificial consumption: 3000 management personnel and technical personnel 2000 days m2/, m2/ days, the bottom two ash gravel 700m2/ days, the top two ash gravel engineering 300m2/ days. 6., quality assurance measures: two gray gravel should be consistent with the "urban road construction and quality acceptance specification" CJJ1-2008, 7.3 and 7.8.1 lime soil base permit. Allowable deviations conform to the provisions of the following table:7. safety measures:1) when the bulldozer, scraper and roller are in the process of shaping and rolling, the personnel keep a safe distance from the machine, so as to avoid bumping.2) construction of bulldozer and roller, facilities on the ground (cable, cable and other pipelines) and underground facilities (cable, cable, cable, telecommunications, gas, tap water and heating pipelines) to establish a clear mark, pay attention to the protection of various facilities, avoid scratching, touch, digging and other phenomena.3) technical personnel in the survey work to avoid the cable tower feet touch the ground, to prevent electric shock accidents.4) non mechanical equipment operators shall not operate on the aircraft.5) the construction of plastic surgery, to all personnel prepared masks and other labor insurance items, to avoid people suffering from respiratory diseases.
- Q: On 16th of March 23 year old, Rachel Corrie an American Peace Activists was murdered by an Israeli bulldozer while she was trying to prevent a Palestinian home from being demolished. The media does not give enough attention to these wonderful people and that is why I'm sending this hoping many people will give more attention to people like her.
- It's so sad that the media chose to ignore this tragedy just for the sake of keeping a good image of Israel.
- Q: I am stuck between naNO vapor hardcore series and jack3d. Which would you recommend? And if theres an even better pre-workout supp please tell me. Im lookin for somethin thatd give me a nice pump and a good amount of energy. Thanks for all your help guys much appreciated
- You okorder /
- Q: Which is the best of the two? I heard that the AMD4 core is inferior to the Intel 2 kernel I rely on, I would like to ask, amd6 nuclear or 8 nuclear power Intel 4 Nuclear? I mainly play games, through the FireWire FPS, I want more than 200, video card recommend one.I know AMD is cheap, but it's a dime a share. Where is Intel's money? 4 Nuclear stem but 2 nuclear, what's the matter?
- The core is uselessMost games support dual core at mostSo the single core performance strong Intel U AMD is awesomeFor example, i5 3470 has only 4 cores, and FX8150 has 8 nucleiBut when you play a game, you use 2 cores at most, and i5 is much fasterUnless you are leveling, hang up dozens of window function can reflect the multi coreYou play CF DNF this game, low-end configuration can be done.If the budget is enough to play a long time, the other large single word play,With i5+8G memory, +7850 or 660 levels of graphics cards, the host 3500 yuan.
- Q: I am not exactly on an intel budget and i want to get this sick new graphics card
- Agree a 8 core processor is a waste of money and the answer made a very good point about the quad cores, also excuse me people but the gtx 680 has already been release, my bag ! the second time that some a long waited product been release early the first was the ipad 3 , besides that no is the answer.
Send your message to us
Steel Grab Mmachine, Front End Loader with Steel Grab, Wood Grapple
- Loading Port:
- China main port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 1 set
- Supply Capability:
- 100 set/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords