• Aluminum Formworks for Civil Commercial Buildings System 1
  • Aluminum Formworks for Civil Commercial Buildings System 2
Aluminum Formworks for Civil Commercial Buildings

Aluminum Formworks for Civil Commercial Buildings

Ref Price:
get latest price
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
100 m²
Supply Capability:
8000 m²/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

1. Structure of  Whole Aluminum Formwork Description 

Whole Aluminium Formwork System is designed to reduce material quantity, erection and dismantling time as well as effort, subsequently increasing efficiency and reducing general construction time, materials and labour cost. All main components are manufactured from high grade aluminium alloy. This structural grade aluminium has exceptional properties being extremely light in weight but also heavy-duty and durable. When incorporating this into a design which utilizes standard components and allows several possible plan and elevation variables, it provides a lightweight solution for a large area slab formwork system.

 

2. Main Features of  Whole Aluminum Formwork

-Light and easy assemble

-Simple structure.

-Competitive prices

 

3. Whole Aluminum Formwork Images

 

Aluminum Formworks for Civil Commercial Buildings


4. Whole Aluminum Formwork Specifications

1: MaximumColumn Size:900 x 900mm

(2’-11.5”x 2’-11.5”)

2: DesignConcrete Pressure: 1,800 psf (90 kN/m2)

3:StandardPanel Width 900mm, 750mm & 600mm

(2’-11.5”,2’-5.5” & 1’-11.5”)

4:StandardPanel Height: 3.0m, 2.4m, 1.2m

Aluminum Formworks for Civil Commercial BuildingsAluminum Formworks for Civil Commercial BuildingsAluminum Formworks for Civil Commercial Buildings 

 

 

5. FAQ of  Whole Aluminum Formwork

 

1) What can we do for you? 

    .We can ensure the quality of the Whole Aluminum Formwork and avoid extra expenses for customers.    

    .We can provide you the professional technical team.    

    .We can provide professional building proposal for your project.       

    . Please feel free to customize.  

 

2) What promises can be done by us?

   . If interested in this kind of formwork, please feel free to write us for any QUOTE.

   . If need any technical and building assistance, we could provide on-site professional staff for instruction.

   . Please DO check goods when courier knocks your door and contact us asap if any issueS.

 

3) What about of our after-sale services?

   . Response will be carried out  in 24hours  after receiving any complain or request.

   . Any formwork cost can be refund after order is confirmed. 

   . If the products are not based on the requirements, there will be the relevant compensations made for you.  

 

 4) What about the package and shipping time?

-Packing: wood package and adhesive tape

-Shipping: by sea

     -Shipping time: Normally small orders just takes 7 business days to arrive your hand;. When it comes to the customs declaration, it may need 2weeks.


Q: What is the development prospect of aluminum template design?
Easy to disassemble, high construction efficiency: aluminum alloy template for the existing metal template in the lightest, single can be free to move, install, remove and transfer, the workers can easily assembled. Each template, components are in the same location on each floor, the workers only need a simple training, a short period of time can be proficient in the construction process. And the installation and removal process, just human, no other machinery, simple operation, easy construction.
Q: In the Sheng-aluminum template installation workers, how to develop prospects
First, it is obeying the instructions. Then, hard work hard not to suffer. Finally, either honestly go to a climb, or put you out. Solution is completed, I was Sheng through drops!
Q: What is the change in the aluminum template?
Aluminum template design research and development and construction applications, is a major development of the construction industry, the standard aluminum template is also in accordance with the needs of national society, to create a professional green construction, green building, environmental protection and energy conservation, efficient construction industry leading building aluminum template The
Q: Now the domestic use of aluminum template project more?
Construction of aluminum alloy template construction advantages are: 1, the construction period is short, four to five days can be a layer; 2, re-use more than 200 times, effectively reduce costs; 3, artificial reduction of 30%, construction convenience, high efficiency; The template 2 times the bearing capacity, good stability, high bearing capacity;
Q: Whether a shear wall aluminum template and wood template can be mixed
Summary: It is recommended to use a combination of two templates in a shear wall. When the number of templates is insufficient, you can use a template alone, but it will be better than the mix.
Q: Aluminum template of the aluminum template advantage characteristics
In areas with high urbanization, the following technical advantages can be demonstrated: 1) Short construction period. Aluminum template system for the quick-release mold system, a set of normal construction of the template can reach four days a layer, and can be better to start the construction of the pipeline, greatly improving the construction schedule, saving management costs. 2) the number of repeated use, the average use of low cost. Aluminum template system using the overall extrusion of aluminum alloy profiles to do the raw materials, a set of specifications can be used to modify the construction of more than 300 times. A set of template purchase prices are spread out than the traditional template to save a lot of cost. 3) convenient construction, high efficiency. Aluminum template system assembly is simple, convenient, the average weight of about 20kg, completely by the manual handling and assembly, do not need any mechanical equipment to help, and the system design is simple, the workers get started speed and template flip speed quickly. Skilled installation workers per person per day can be installed 20-30 square meters, significant savings in labor costs.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords