Aluminum Formwork with Economic Design Principle
- Loading Port:
- Shanghai
- Payment Terms:
- TT or LC
- Min Order Qty:
- 100 m²
- Supply Capability:
- 8888888888888888888888 m²/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Environment Friendly of Aluminum Formwork
All the material adopted by aluminum formwork system are reproducible and meet China national standard for energy saving. Timber beam formwork is forbidden to use by many developed countries and recycling formwork system are encouraged; thus, aluminum formwork system benefits not only the economic effect but also the social effect.
No. | Item | Aluminum Formwork | Timber Beam Formwork | ||||
1 | Panel material | Aluminum panel with 4mm thickness | Plywood with 20mm thickness | ||||
2 | Formwork weight(kg) | Medium | Medium | ||||
3 | Bearing capacity(KN/m2) | 60 | 30 | ||||
4 | Construction period | 4~5 days per floor | At least 6 days per floor | ||||
5 | Formwork dismantling period | Colum & wall formwork are dismantled after 24 hours; slab formwork is dismantled after 36 hours | slab formwork is dismantled at least after 168 hours | ||||
6 | Construction condition | Easy | Hard | ||||
7 | Maintenance cost | Low | High | ||||
8 | Construction efficiency | High | Low | ||||
9 | Application scope | Wall, column, beam, slab and bridge | Wall, column, beam, slab and bridge | ||||
The technology index comparison between Aluminum Formwork and Timber Beam Formwork
No. | Item | Aluminum Formwork | Timber Beam Formwork |
1 | Surface effect I | Flat, smooth and accurate | Rough |
2 | Surface effect II | No stick concrete | Stick concrete |
3 | Window molding & installation | Accurate and could be installed from down side to up side | Deviation and could be installed only after sand-plastering |
4 | Lifting equipment outside frame | No need | Need |
5 | Requirement for | ||
6 | Concrete leakage | No leakage | Leakage and need re-cleaning |
7 | Construction garbage | Few | Lots |
8 | Construction change cost | Low | High |
9 | Requirement for concrete grade and steel bar | High | Low |
10 | Requirement for construction workers | High and professional Need less workers | Low and unprofessional Need more workers |
The economic index comparison between Aluminum Formwork and Timber Beam Formwork in China
No. | Item | Aluminum Formwork Construction | Timber Beam Formwork Construction |
1 | Formwork cost | USD5/㎡ (Rental price) | USD3/㎡ |
2 | Labor cost for assembling, dismantle and transportation | USD4.3/㎡ | USD4.6/㎡ |
3 | Formwork support frame, fasten material | 0 | USD0.85/㎡ |
4 | Lifting equipment usage | 0 | One day per floor |
5 | Worker cost for sand-plastering | Decreased by 70% | USD1.4/㎡ |
6 | Cost for sand-plastering | Decreased by 80% | USD0.67/㎡ |
7 | Formwork leakage | None | Controlled by worker |
8 | Procession quality control | One technician / day | Two technician / day |
9 | Auxiliary Mini machinery (including bench saw) | None | Required |
10 | Power supply cost for formwork assembling & transportation | None | Required |
11 | Loading platform for formwork transportation | None | Four units / floor |
China National Building Material Group Co., Ltd. (CNBM) was founded through the merger of the China National Building Materials Group Corporation and China National Materials Group Corporation.
Having integrated its scientific research, manufacturing and logistics, CNBM is the largest manufacturer for building materials and an integrated service provider leading throughout the world. It has been listed in the Fortune Global 500 for nine consecutive years.
Total assets 600 billion yuan
Employees world +200,000
Sales 300 billion yuan
The largest comprehensive building materials industry group in the world:
ü The Group can produce 400 million tons of cement clinker, 460 million m3 of ready-mix concrete, 2.47 billion m2 of plasterboard, 2.5 million tons of fiberglass, 31,500 pieces of GW-capacity wind turbine blades, ranking No.1 in the world.
ü The No. 1 player in the international cement engineering market and international cogeneration market.
ü CNBM is the largest ultra-high voltage electrical porcelain producer, fused cast refractory producer, ultra-thin electronic float glass producer, carbon fiber producer in China.
ü CNBM takes possession of 26 national scientific research and design institutes, 38,000 scientific R&D and technical engineering employees, 33 national industrial quality inspection centers, more than 10,000 patents, 3 national key laboratories, 8 national engineering (technology) research centers and 18 national standardization technical committees.
- Q: What is the development prospect of aluminum template design?
- Easy to disassemble, high construction efficiency: aluminum alloy template for the existing metal template in the lightest, single can be free to move, install, remove and transfer, the workers can easily assembled. Each template, components are in the same location on each floor, the workers only need a simple training, a short period of time can be proficient in the construction process. And the installation and removal process, just human, no other machinery, simple operation, easy construction.
- Q: In the Sheng-aluminum template installation workers, how to develop prospects
- Sheng Tong on my feeling is the same as prison, in addition to front-line staff (prisoners), what is the leadership (guards), every day is the workshop, dormitory, dinner time is only half an hour, the company provides working hours if 12 hours, The time to stay in the workshop every day in more than 13 hours, especially hard to force, can not stand the tube, temper a little irritable advice do not go, afraid you can not control their own K
- Q: What is the change in the aluminum template?
- Aluminum template design research and development and construction applications, is a major development of the construction industry, the standard aluminum template is also in accordance with the needs of national society, to create a professional green construction, green building, environmental protection and energy conservation, efficient construction industry leading building aluminum template The
- Q: Now the domestic use of aluminum template project more?
- Construction of aluminum alloy template construction advantages are: 1, the construction period is short, four to five days can be a layer; 2, re-use more than 200 times, effectively reduce costs; 3, artificial reduction of 30%, construction convenience, high efficiency; The template 2 times the bearing capacity, good stability, high bearing capacity;
- Q: Whether a shear wall aluminum template and wood template can be mixed
- Mixed with the two kinds of templates will be fixed in different ways, the construction of the security caused a certain impact; intersecting joints prone to the wrong layer and honeycomb; two templates expansion coefficient, strength, water retention will not cause the same shear Wall as a whole;
- Q: Aluminum template of the aluminum template advantage characteristics
- Standard, versatility. Aluminum template specifications, according to the project using different specifications of sheet metal assembly; use of the template to transform a new building, just replace the 20 or so non-standard board, can reduce costs.
Send your message to us
Aluminum Formwork with Economic Design Principle
- Loading Port:
- Shanghai
- Payment Terms:
- TT or LC
- Min Order Qty:
- 100 m²
- Supply Capability:
- 8888888888888888888888 m²/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords