Aluminum Formwork with Economic Design Principle
- Loading Port:
- Shanghai
- Payment Terms:
- TT or LC
- Min Order Qty:
- 100 m²
- Supply Capability:
- 8888888888888888888888 m²/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Environment Friendly of Aluminum Formwork
All the material adopted by aluminum formwork system are reproducible and meet China national standard for energy saving. Timber beam formwork is forbidden to use by many developed countries and recycling formwork system are encouraged; thus, aluminum formwork system benefits not only the economic effect but also the social effect.
No. | Item | Aluminum Formwork | Timber Beam Formwork | ||||
1 | Panel material | Aluminum panel with 4mm thickness | Plywood with 20mm thickness | ||||
2 | Formwork weight(kg) | Medium | Medium | ||||
3 | Bearing capacity(KN/m2) | 60 | 30 | ||||
4 | Construction period | 4~5 days per floor | At least 6 days per floor | ||||
5 | Formwork dismantling period | Colum & wall formwork are dismantled after 24 hours; slab formwork is dismantled after 36 hours | slab formwork is dismantled at least after 168 hours | ||||
6 | Construction condition | Easy | Hard | ||||
7 | Maintenance cost | Low | High | ||||
8 | Construction efficiency | High | Low | ||||
9 | Application scope | Wall, column, beam, slab and bridge | Wall, column, beam, slab and bridge | ||||
The technology index comparison between Aluminum Formwork and Timber Beam Formwork
No. | Item | Aluminum Formwork | Timber Beam Formwork |
1 | Surface effect I | Flat, smooth and accurate | Rough |
2 | Surface effect II | No stick concrete | Stick concrete |
3 | Window molding & installation | Accurate and could be installed from down side to up side | Deviation and could be installed only after sand-plastering |
4 | Lifting equipment outside frame | No need | Need |
5 | Requirement for | ||
6 | Concrete leakage | No leakage | Leakage and need re-cleaning |
7 | Construction garbage | Few | Lots |
8 | Construction change cost | Low | High |
9 | Requirement for concrete grade and steel bar | High | Low |
10 | Requirement for construction workers | High and professional Need less workers | Low and unprofessional Need more workers |
The economic index comparison between Aluminum Formwork and Timber Beam Formwork in China
No. | Item | Aluminum Formwork Construction | Timber Beam Formwork Construction |
1 | Formwork cost | USD5/㎡ (Rental price) | USD3/㎡ |
2 | Labor cost for assembling, dismantle and transportation | USD4.3/㎡ | USD4.6/㎡ |
3 | Formwork support frame, fasten material | 0 | USD0.85/㎡ |
4 | Lifting equipment usage | 0 | One day per floor |
5 | Worker cost for sand-plastering | Decreased by 70% | USD1.4/㎡ |
6 | Cost for sand-plastering | Decreased by 80% | USD0.67/㎡ |
7 | Formwork leakage | None | Controlled by worker |
8 | Procession quality control | One technician / day | Two technician / day |
9 | Auxiliary Mini machinery (including bench saw) | None | Required |
10 | Power supply cost for formwork assembling & transportation | None | Required |
11 | Loading platform for formwork transportation | None | Four units / floor |
China National Building Material Group Co., Ltd. (CNBM) was founded through the merger of the China National Building Materials Group Corporation and China National Materials Group Corporation.
Having integrated its scientific research, manufacturing and logistics, CNBM is the largest manufacturer for building materials and an integrated service provider leading throughout the world. It has been listed in the Fortune Global 500 for nine consecutive years.
Total assets 600 billion yuan
Employees world +200,000
Sales 300 billion yuan
The largest comprehensive building materials industry group in the world:
ü The Group can produce 400 million tons of cement clinker, 460 million m3 of ready-mix concrete, 2.47 billion m2 of plasterboard, 2.5 million tons of fiberglass, 31,500 pieces of GW-capacity wind turbine blades, ranking No.1 in the world.
ü The No. 1 player in the international cement engineering market and international cogeneration market.
ü CNBM is the largest ultra-high voltage electrical porcelain producer, fused cast refractory producer, ultra-thin electronic float glass producer, carbon fiber producer in China.
ü CNBM takes possession of 26 national scientific research and design institutes, 38,000 scientific R&D and technical engineering employees, 33 national industrial quality inspection centers, more than 10,000 patents, 3 national key laboratories, 8 national engineering (technology) research centers and 18 national standardization technical committees.
- Q:Whether a shear wall aluminum template and wood template can be mixed
- The high strength and stability of the aluminum template are good, and the surface roughness of the concrete is high and the precision is high, which can be removed from the surface. The fixed method is simple and quick,
- Q:Now the domestic use of aluminum template project more?
- 1, the construction period is short 2, can be reused many times, the cost of compression costs 3, the construction is convenient, high efficiency, easy to install 4, good stability, high bearing capacity, environmental protection, energy saving,
- Q:Aluminum template of the aluminum template advantage characteristics
- Aluminum template system components need to be designed according to the characteristics of the floor, the design of technical staff capacity requirements are higher. Approximately 80% of the modules in the aluminum template system can be recycled in multiple projects, while the remaining 20% can only be recycled in a class of standard floors, so the aluminum template system is suitable for high-level buildings with high levels of standardization. And villa group.
- Q:In the Sheng-aluminum template installation workers, how to develop prospects
- Sheng Tong on my feeling is the same as prison, in addition to front-line staff (prisoners), what is the leadership (guards), every day is the workshop, dormitory, dinner time is only half an hour, the company provides working hours if 12 hours, The time to stay in the workshop every day in more than 13 hours, especially hard to force, can not stand the tube, temper a little irritable advice do not go, afraid you can not control their own K
- Q:What is the development prospect of aluminum template design?
- High quality and stable performance: aluminum alloy template level and vertical degree can be a good guarantee, and the template itself does not absorb water, concrete molding quality is high, so no need for expensive and long plaster work, tiles can also be directly pasted in Inside and outside the wall. In addition, the aluminum alloy template system is based on architectural drawings and then accurate use of computer software and machinery made, so the construction of high precision, especially doors and windows, hydropower equipment with the location and size are accurate and effective Reduce the amount of construction materials used in the latter part of the construction, cost savings.
- Q:What is the change in the aluminum template?
- Advantages of aluminum alloy template: 1. Construction period is short: aluminum alloy building template system for the quick-release mold system, a set of normal construction of the template can reach four or five days a layer, greatly saving the construction unit management costs (currently under construction project in Macau - TN27 public housing construction up to Three days a layer). (6063-T6 or 6061-T6), a set of template specifications can be used to reverse the use of 300-500 times the use of aluminum alloy profiles, the use of aluminum, Above, the average use of low cost. Easy construction, high efficiency: aluminum alloy building template system assembly is simple, convenient, the average weight of 30KG / m2, completely by the artificial assembly, do not need any mechanical equipment assistance (workers usually only need a wrench or a small hammer, convenient ), Skilled installation workers can install 20-30 square meters per person per day (compared with the wooden mold: aluminum mold installation workers only need to install wood workers 70-80%, and do not need skilled workers, just before the installation of the construction Personnel can carry out simple training). Good stability, high bearing capacity: aluminum alloy building template system all parts are made of aluminum alloy plate assembly, the system assembled to complete the formation of a whole frame, the stability is very good; bearing capacity can reach 60KN per square meter.
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Aluminum Formwork with Economic Design Principle
- Loading Port:
- Shanghai
- Payment Terms:
- TT or LC
- Min Order Qty:
- 100 m²
- Supply Capability:
- 8888888888888888888888 m²/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords