• Aluminum Formwork with Economic Design Principle System 1
  • Aluminum Formwork with Economic Design Principle System 2
Aluminum Formwork with Economic Design Principle

Aluminum Formwork with Economic Design Principle

Ref Price:
get latest price
Loading Port:
Shanghai
Payment Terms:
TT or LC
Min Order Qty:
100 m²
Supply Capability:
8888888888888888888888 m²/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Environment Friendly of Aluminum Formwork

All the material adopted by aluminum formwork system are reproducible and meet China national standard for energy saving. Timber beam formwork is forbidden to use by many developed countries and recycling formwork system are encouraged; thus, aluminum formwork system benefits not only the economic effect but also the social effect.   

 

 

 

 

 

No.

Item

Aluminum Formwork

Timber Beam Formwork

1

Panel material

Aluminum panel with 4mm thickness

Plywood with 20mm thickness

2

Formwork weight(kg)

Medium

Medium

3

Bearing capacity(KN/m2)

60

30

4

Construction period

4~5 days per floor

At least 6 days per floor

5

Formwork dismantling period

Colum & wall formwork are dismantled after 24 hours; slab formwork is dismantled after 36 hours

slab formwork is dismantled at least after 168 hours

6

Construction condition

Easy

Hard

7

Maintenance cost

Low

High

8

Construction efficiency

High

Low

9

Application scope

Wall, column, beam, slab and bridge

Wall, column, beam, slab and bridge

The technology index comparison between Aluminum Formwork and Timber Beam Formwork

 

No.

Item

Aluminum Formwork

Timber Beam Formwork

1

Surface effect I

Flat, smooth and accurate

Rough

2

Surface effect II

No stick concrete

Stick concrete

3

Window molding & installation

Accurate and could be installed from down side to up side

Deviation and could be installed only after sand-plastering

4

Lifting equipment outside frame

No need

Need

5

Requirement for

6

Concrete leakage

No leakage

Leakage and need re-cleaning

7

Construction garbage

Few

Lots

8

Construction change cost

Low

High

9

Requirement for concrete grade and steel bar

High

Low

10

Requirement for construction workers

High and professional

Need less workers

Low and unprofessional

Need more workers

 

The economic index comparison between Aluminum Formwork and Timber Beam Formwork in China

No.

Item

Aluminum Formwork Construction

Timber Beam Formwork Construction

1

Formwork cost

USD5/ (Rental price)

USD3/

2

Labor cost for assembling, dismantle and transportation

USD4.3/

USD4.6/

3

Formwork support frame, fasten material

0

USD0.85/

4

Lifting equipment usage

0

One day per floor

5

Worker cost for sand-plastering

Decreased by 70%

USD1.4/

6

Cost for sand-plastering

Decreased by 80%

USD0.67/

7

Formwork leakage

None

Controlled by worker

8

Procession quality control

One technician / day

Two technician / day

9

Auxiliary Mini machinery (including bench saw)

None

Required

10

Power supply cost for formwork assembling & transportation

None

Required

11

Loading platform for formwork transportation

None

Four units / floor

China National Building Material Group Co., Ltd. (CNBM) was founded through the merger of the China National Building Materials Group Corporation and China National Materials Group Corporation.

Having integrated its scientific research, manufacturing and logistics, CNBM is the largest manufacturer for building materials and an integrated service provider leading throughout the world. It has been listed in the Fortune Global 500 for nine consecutive years.

Total assets 600 billion yuan

Employees world +200,000

Sales 300 billion yuan

The largest comprehensive building materials industry group in the world:

ü The Group can produce 400 million tons of cement clinker, 460 million m3 of ready-mix concrete, 2.47 billion m2 of plasterboard, 2.5 million tons of fiberglass, 31,500 pieces of GW-capacity wind turbine blades, ranking No.1 in the world.

ü The No. 1 player in the international cement engineering market and international cogeneration market.

ü CNBM is the largest ultra-high voltage electrical porcelain producer, fused cast refractory producer, ultra-thin electronic float glass producer, carbon fiber producer in China.

ü CNBM takes possession of 26 national scientific research and design institutes, 38,000 scientific R&D and technical engineering employees, 33 national industrial quality inspection centers, more than 10,000 patents, 3 national key laboratories, 8 national engineering (technology) research centers and 18 national standardization technical committees.

Q: What is the development prospect of aluminum template design?
Easy to disassemble, high construction efficiency: aluminum alloy template for the existing metal template in the lightest, single can be free to move, install, remove and transfer, the workers can easily assembled. Each template, components are in the same location on each floor, the workers only need a simple training, a short period of time can be proficient in the construction process. And the installation and removal process, just human, no other machinery, simple operation, easy construction.
Q: In the Sheng-aluminum template installation workers, how to develop prospects
Can go to feel, the elimination rate is very high, most of them are left, remember: have the strength to be able to endure hardship, to listen to Sheng Sheng, if you do not need special money, and physical fitness is not good, labor intensity More than your imagination
Q: What is the change in the aluminum template?
Advantages of aluminum alloy template: 1. Construction period is short: aluminum alloy building template system for the quick-release mold system, a set of normal construction of the template can reach four or five days a layer, greatly saving the construction unit management costs (currently under construction project in Macau - TN27 public housing construction up to Three days a layer). (6063-T6 or 6061-T6), a set of template specifications can be used to reverse the use of 300-500 times the use of aluminum alloy profiles, the use of aluminum, Above, the average use of low cost. Easy construction, high efficiency: aluminum alloy building template system assembly is simple, convenient, the average weight of 30KG / m2, completely by the artificial assembly, do not need any mechanical equipment assistance (workers usually only need a wrench or a small hammer, convenient ), Skilled installation workers can install 20-30 square meters per person per day (compared with the wooden mold: aluminum mold installation workers only need to install wood workers 70-80%, and do not need skilled workers, just before the installation of the construction Personnel can carry out simple training). Good stability, high bearing capacity: aluminum alloy building template system all parts are made of aluminum alloy plate assembly, the system assembled to complete the formation of a whole frame, the stability is very good; bearing capacity can reach 60KN per square meter.
Q: Now the domestic use of aluminum template project more?
1, the construction period is short 2, can be reused many times, the cost of compression costs 3, the construction is convenient, high efficiency, easy to install 4, good stability, high bearing capacity, environmental protection, energy saving,
Q: Whether a shear wall aluminum template and wood template can be mixed
Mixed with the two kinds of templates will be fixed in different ways, the construction of the security caused a certain impact; intersecting joints prone to the wrong layer and honeycomb; two templates expansion coefficient, strength, water retention will not cause the same shear Wall as a whole;
Q: Aluminum template of the aluminum template advantage characteristics
Standard, versatility. Aluminum template specifications, according to the project using different specifications of sheet metal assembly; use of the template to transform a new building, just replace the 20 or so non-standard board, can reduce costs.