Aluminum Formwork System for 30 Levels Building Construction
- Loading Port:
- Shekou
- Payment Terms:
- TT or LC
- Min Order Qty:
- 1000 m²
- Supply Capability:
- 8000 m²/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Aluminum formwork Description
Easy and quick to remove, after pouring concrete:
Remove wall column within 24 hours;
Remove beam sides within 36 hours;
Remove beam bottom and bottom formwork within 48hours;
Remove load bearing pillars after 12 days;
Remove beam bottom bearing pillar after 14 days;
Remove cantilever pillar after 28 days;
3~4 days for one floor construction.
Raw material made by 6061-T6 aluminum;
Recycle use 150~300 times to make low cost
The average weight is 25kg/m2
Few instruments for installation
Average 20~30 m2 per day for one worker
Save 20%~30% workers than wooden formwork
Smooth concrete surface
Save plaster cost
All components are reusable
Clean and neat construction site
Usually 80% formwork can directly reuse
Renewable materials to save energy
Low carbon emissions
Comparasion of Aluminum formwork & wood formwork
NO. | Reference | Aluminum Formwork | Wood Formwork |
1 | Material cost (Included Support) | $183-216/m2 | $13--16/m2 |
2 | Turnaround times | 200times at least | 3-5times |
3 | Assembling and dismantling labor cost | $3.6-4.2/m2 | $4.2-4.7/m2 |
4 | Recovery value | $67/m2 | $0.8/m2 |
5 | Subtotal artificer materials | $4.4-4.9/m2 | $7.5-8/m2 |
6 | Leveling the wall plastering labor cost | $0.4/m2 | $2/m2 |
7 | Leveling the wall plastering material cost | $0.3/m2 | $2.6/m2 |
8 | Ergonomics | 20m2/day | 15m2/day |
9 | Final economic indicators | $5.9-6.4/m2 | $12-13/m2 |
Advantages of Aluminum Formwork / Shuttering System
1. Light weight, high strength and precision
The data has proved that the flexural strength of aluminum is triple higher than ordinary steel.With weight of 20-26KG/M2. Aluminum formwork is the lightest formwork for construction,which makes for easy handling.
2. Various sizes, high accuracy
The construction drawing is designed with strict structure, with little measurement error and high accuracy,which is very suitable for high rise buildings.
3. Safe and convenient construction
High loading capacity requires less use of props, reducing lost in material and labor. Workers can independently operate after simple training.
4. Long time used
With the lowest average lost, aluminum formworks can be used up to 300 times.
5. Widely applicable
The precise-designed formwork system applies to all kinds of building elements, such as the main wall, column, beams, stairs and balconies.
6. Excellent quality
The concrete surface is very smooth, so it can saved the swing cost and shorten the construction period.
7. High efficiency
According to different climatic conditions, the formworks can be removed in 18-36 hours.
8. Recyclable value
The used aluminum material is of greater recyclable value,several times higher than steel.
9. Independent support system
The gap between the formwork support is totally enough for passing, moving and pulling.
10. Dependable safety, environmental
The construction process is totally safe. Full aluminum structure leads to no galvanization and thus minimizes the pollution to our earth.
- Q:Case Study of Aluminum Alloy Formwork
- Engineering aluminum alloy template design program case: 1, all using stereotypes design, factory production, template engineering quality excellent. 2, safe and civilized construction, people-oriented, scientific development. 3, because the scene almost no production process, reduce the construction noise, energy saving, power in the future.
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Aluminum Formwork System for 30 Levels Building Construction
- Loading Port:
- Shekou
- Payment Terms:
- TT or LC
- Min Order Qty:
- 1000 m²
- Supply Capability:
- 8000 m²/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords