Aluminum Foil Tapes with Water based acrylic T-F3004WP
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
ProductDescription
A aluminum foil with water based acrylicadhesive. It has good adhesion. Ideal for wind-pipe’s heat preservation of refrigerator and air-condition.
Product Construction
Carrier :Aluminumfoil,alloy: 8011 O
Adhesive glue: A high performance waterbased acrylic
Silicon paper: A white kraft paper, on aside laminated with film PE and coating solvent silicon. 75gram/sm.
TypicalPhysical Properties
PROPERTIES | UNITS | VALUE | TEST METHOD |
Backing Thickness | mm | 0.030 | PSTC-133 / ASTM D3652 |
Total Thickness | mm | 0.068 | PSTC-133 / ASTM D3652 |
Adhesion to Steel | N/25mm | ≥12 | PSTC-101/ ASTM D3330 |
Tack Rolling Ball | cm | 20 | PSTC-6 / ASTM D3121 |
Holding power | min | ≥1440 | PSTC-107/ASTM D3654 |
Tensile Strength | N/25mm | 45 | PSTC-131 / ASTM D3759 |
Elongation | % | 3.0 | PSTC-131 / ASTM D3759 |
Service Temperature | ℃ | -10~+110 | ———— |
Applying Temperature | ℃ | +5~+60 | ———— |
Product Form & SizeAvailable
Cut Roll: 48 / 50mm (2") / 60 / 63mm (2.5") / 72 / 75mm (3") / 96mm / 100mm(4").
Log Roll: 1020mmx 45 / 50m Jumbo Roll: 1020mm x 1200m / 1350m
Custom widths and lengths available, contact us forspecifications and requirements
Tolerance:Weight and Thickness: ±10%; Width: ±2mm; Length: Cut Roll: ±0.3m, Jumbo Roll ±0.5%.
The physical and performance propertiesshown are averages obtained from tests recommended by PSTC. A particular rollmay vary slightly from these averages and it is recommended that the buyerdetermine the suitability for his own purposes.
- Q: Such as the problem, and now air-conditioning technology is mature, the market a lot of air conditioning are cold and warm, and I would like to be able to put my home that the end of the century loaded Mitsubishi air conditioning (split single cold) into a cold Before the conversion of ordinary TV to the remote control, that air conditioning can be modified? How much does it cost? Where is this technology? More
- External wall insulation should pay attention to what the details?
- Q: If I feel the room cool off, one hour hot and open an hour this will be more expensive? More
- But after all, is the master you want to Zhuo good jade is certainly a lot of difficulties, whether it is Longfeng Pei or other subject matter need a lot of effort in addition to the need for technical research also need to continue to learn theoretical knowledge, especially
- Q: Air to water heater host and air conditioning host is not the same
- You can try asphalt! Is the kind of paving the way! Very useful!
- Q: Air conditioning ventilation when the sound is a big reason
- Buried plastic pipe under external load, the diameter of the vertical diameter deformation rate should be less than the allowable diameter of the pipe deformation rate The diameter of the allowable diameter of the pipe shall not be greater than 5% The diameter deformation rate of the pipe and the allowable diameter deformation rate are calculated as follows: ε ΔD / D0 × 100% [ε] ε0 / K where: εΔD pipe in the combined load (Mm) [ε] Permissible diameter Deformation rate ε0 Elastic diameter Deformation rate (%) of pipe, by the flattening of the diameter of the pipe diameter (mm) The test determines the K safety factor, generally desirable 15
- Q: Do 3cm thick wall insulation how much kilogram of slurry and how many kilograms of polystyrene particles
- Of course, is heating electricity. Heating has auxiliary electric heating, so electricity and electricity. Frequently open the fee, the air compressor is not good. 2 machine cooling power is 1700 watts, 1 hour is 1.7 degrees electricity. Heating with auxiliary electric heating power of 1500 watts, 1 hour is 3.2 degrees electricity.
- Q: I added the space 18 degrees opened for 5 hours or not cold, we all know how is it? More
- Common points are all sandwich panels, with a hard protective layer, the difference is the middle of the different materials, such as polystyrene board, polyurethane board. Polystyrene board which is the most common, because the price is cheap, easy to use so the use of more, but if the temperature is more than the requirements of the chicken inertia glycosylation moxibustion slim faint words, polystyrene board is not satisfied , So there is a polyurethane sandwich panels, polyurethane thermal conductivity of less than 0.. in the existing insulation materials, large quantities of processing, be the best. But because of its process is more complex, and the cost is relatively high, so with less, the common combination of cold storage and the like, I believe that with the economic and technological development, polyurethane sandwich board market share will be more and more High
- Q: Air conditioning machine work when the sound is too much reason
- Many of the good quality of the model, of course, bear some of the larger. Common scaffolding brackets are U-type care, "construction fastener steel scaffold safety technical regulations" (JGJ130-2011) provides "adjustable support bearing capacity design value should not be less than 40kN, support plate thickness should not be less than 5mm ", the general calculation using 30kN. Not to say how fast buckle steel scaffold can bear the load, but according to how much load to calculate how scaffolding erection. Need to be calculated. In the "construction of fasteners steel scaffold safety technical specifications" provides instructions. Double fastener (anti - skid) bearing capacity design value 3.2KN. Right angle fastener, rotary fastener (anti-skid) bearing capacity design value 8KN.
- Q: What is the whole heat exchange fresh air ventilator?
- Depends on the main control panel is not cold and warm, single cold common motherboard. Only a generic motherboard can be changed. In the single cold air-conditioning on the outdoor machine to install the appropriate specifications of the four-way valve, adjust the amount of refrigerant to the appropriate level can be.
- Q: In the design, the building structure and the hydropower are generally designed by the Architectural Design Institute. The air conditioning ventilation is based on the design of the room. Or first air conditioning ventilation? More
- Normal heat absorption is also due to poor ventilation (dirty) and air humidity so icing
- Q: HVAC Heating: What are the main components of the air distribution system?
- Geothermal construction, the heating pipe spacing can not be less than 100mm, the construction can not be achieved, big brother!
Send your message to us
Aluminum Foil Tapes with Water based acrylic T-F3004WP
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords