• Aluminum Foil  Tapes with Solvent Acrylic Adhesive T-F4504SP System 1
  • Aluminum Foil  Tapes with Solvent Acrylic Adhesive T-F4504SP System 2
Aluminum Foil  Tapes with Solvent Acrylic Adhesive T-F4504SP

Aluminum Foil Tapes with Solvent Acrylic Adhesive T-F4504SP

Ref Price:
get latest price
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Product Description

A aluminum foil with solventacrylic adhesive adhesive and protected byeasy release liner. Good for sealing joints / seams against moisture andvapor on foil jacketing insulation. Suitable for many other permanent sealing,holding, splicing or masking applications requiring the protection offered by afoil backing.

Product Construction


Carrier :Aluminumfoil,alloy: 8011 O

Adhesive glue: A high performance solvent acrylic adhesive.

Silicon paper: A white kraft paper, on aside laminated with film PE and coating solvent silicon.  75gram/sm.

TypicalPhysical Properties

PROPERTIES

UNITS

VALUE

TEST METHOD

Backing  Thickness

mm

0.045

PSTC-133 / ASTM D3652

Total  Thickness

mm

0.085

PSTC-133 / ASTM D3652

Adhesion to  Steel

N/25mm

≥20

PSTC-101/ ASTM D3330

Tack Rolling  Ball

cm

20

PSTC-6 / ASTM D3121

Holding power

min

≥1440

PSTC-107/ASTM D3654

Tensile  Strength

N/25mm

60

PSTC-131 / ASTM D3759

Elongation

%

3.0

PSTC-131 / ASTM D3759

Service  Temperature

-30~+120

————

Applying Temperature

+10~+40

————

Product Form & SizeAvailable

Cut Roll: 48 / 50mm (2") / 60 / 63mm (2.5") / 72 / 75mm (3") / 96mm / 100mm(4").

Log Roll:  1020mmx 45 / 50m                Jumbo Roll: 1020mm x 1200m / 1350m

Custom widths and lengths available, contact us forspecifications and requirements

Tolerance:Weight and Thickness: ±10%; Width: ±2mm; Length: Cut Roll: ±0.3m, Jumbo Roll ±0.5%.

The physical and performance propertiesshown are averages obtained from tests recommended by PSTC. A particular rollmay vary slightly from these averages and it is recommended that the buyerdetermine the suitability for his own purposes.



Q: Such as the problem, and now air-conditioning technology is mature, the market a lot of air conditioning are cold and warm, and I would like to be able to put my home that the end of the century loaded Mitsubishi air conditioning (split single cold) into a cold Before the conversion of ordinary TV to the remote control, that air conditioning can be modified? How much does it cost? Where is this technology? More
External wall insulation should pay attention to what the details?
Q: Air to water heater host and air conditioning host is not the same
This test with a small sample length 127mm, width 12.7mm, the maximum thickness of 3.2mm. In the absence of ventilation test chamber. The top of the specimen (6.4 mm place) is clamped with a clamp on the bracket and the longitudinal axis of the specimen is kept vertical. The lower end of the specimen is 9.5mm from the lamp tip and 305mm from the dry absorbent cotton surface. Bring the Bunsen burner and adjust it to produce a blue flame with a height of 19mm. Place the Bunsen Lights flame at the bottom of the sample for 10s, then remove the flame (at least 152mm away from the specimen) and write down the sample. Burning time. If the flame of the sample within 30s after removal of the flame is extinguished, the original lamp must be moved under the specimen again, re-ignite the sample for 10s, and then remove the Bunsen burner again and note the flame burning And flames burning the burning time. If the sample droplets drip, let it fall into the sample under the 305mm cotton, to see whether it ignited cotton. If the absorbent cotton is on fire, the rating should be taken into account. Specific grading indicators are as follows. Test Item 94V-094V-194V-21 Ten-time ignition Total flame burning time Maximum value (S) Individual flame burning time Maximum value (s) Flameless burning time (s) Yes Flame drop No No Allow only short time Burning general UL yellow card on the thickness of the test strip is divided into: 1/8 inch, 1/16 inch, 1/32 inch thickness, that is, 3.2mm, 1.6mm, 0.8mm three grades test.
Q: Air conditioning ventilation when the sound is a big reason
No matter, it is best to cut the distance between the material and the roof, like an arbor. Otherwise it is not foam board with it
Q: US direct mail dysonhp01 Dyson air purification cooling machine triple in the country to warranty it
Embedded stove, such as the use of rubber tube connection, then the rubber tube in the platen, often subject to heat radiation easily aging; and aging, falling more difficult to find, so many local poisoning and other vicious accidents
Q: I added the space 18 degrees opened for 5 hours or not cold, we all know how is it? More
The general level of more than 12 layers when you need to use.
Q: What is the whole heat exchange fresh air ventilator?
(GJG130 - Fan Jutang Duanjie Daojie Juejiao 2001) will be replaced by (GJG130-2011) is expected to begin the implementation of the construction of this year, the construction of fastener steel scaffolding safety technical specifications (GJG130), the construction of fastening steel pipe scaffolding safety technical specifications (GJG130- -2011)
Q: External wall insulation method of operation There are several combinations of materials
30-150 per square meter has, mainly to see the material, thickness and so on
Q: The installation method of ordinary air conditioner. The more detailed the better. Please thank you all
2.1.23 step distance liftheight the distance between the upper and lower horizontal axis of the axis of each other. 2.1.24 pole vertical (cross) distance longitudinal spacingofuprighttube Scaffolding vertical distance between adjacent rods. 2.1.25 Vertical distance transversespacingofuprighttube Scaffolding Horizontal distance between adjacent vertical rods, single row scaffolding for the outside pole axis to the wall distance.
Q: In the design, the building structure and the hydropower are generally designed by the Architectural Design Institute. The air conditioning ventilation is based on the design of the room. Or first air conditioning ventilation? More
Decoration refers to the home improvement part, housing construction is the content of the building
Q: HVAC Heating: What are the main components of the air distribution system?
The reasons are the following: 1. Household electricity is not enough, can not start the compressor, so in the heating state can only be ventilated state, cooling the state directly jump electricity; 2. See if you are reported failure, Code to determine the need for on-site inspection in order to know the specific situation; 3. Four-way valve should be no problem, do not just believe that this is the problem Oh; help your words to adopt

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords