• Aluminum Exhaust Flexible Ducts fo HVAC Systems System 1
  • Aluminum Exhaust Flexible Ducts fo HVAC Systems System 2
  • Aluminum Exhaust Flexible Ducts fo HVAC Systems System 3
Aluminum Exhaust Flexible Ducts fo HVAC Systems

Aluminum Exhaust Flexible Ducts fo HVAC Systems

Ref Price:
get latest price
Loading Port:
Shekou
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
100000000 m/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Aluminum Exhaust Flexible Ducts fo HVAC Systems

Introduction

This type of duct is made of reinforced aluminum foil coating.The inner part is filled with highly tensile spiral steel wires to support the duct.It is generally applied on low to medium air velocity with temperature variation system.This product has passed GB8624B1 fire resistant test.

Specification Description

Thickness of aluminum foil

0.0065mm

Thickness of PET

0.012mm/0.015mm

Density of cotton

16kg/m3;20kg/m3;32kg/m3

Thickness of cotton

25mm

Diameter of steel wire

0.8mm/1.2mm

Glue

hot melt adhesive /polyurethane

Caliber

4"~20"

Package

Box/bag

Length

6m/10m

Technical Target    

Operating temperature range

-30oC~140oC

Max air velocity

30m/s

Max operating pressure

2500pa

Meltingpoint of hot melt adhesive

130oC

Parametric Table

Number of plies

Max operating temperature

Materials

Single ply

120oC

single-ply aluminum foil and single-ply PET  film compound

Double plies

140oC

single-ply PET to place in double-ply  aluminum foil

Four plies

220oC

Doulble plies of single-ply aluminum foil

Six plies

250oC

Double plies of double-ply aluminum foil

We are pleased to supply products according tothe requirement of our clients!

Production Flow

   




Q: Such as the problem, and now air-conditioning technology is mature, the market a lot of air conditioning are cold and warm, and I would like to be able to put my home that the end of the century loaded Mitsubishi air conditioning (split single cold) into a cold Before the conversion of ordinary TV to the remote control, that air conditioning can be modified? How much does it cost? Where is this technology? More
External wall insulation should pay attention to what the details?
Q: Air to water heater host and air conditioning host is not the same
This test with a small sample length 127mm, width 12.7mm, the maximum thickness of 3.2mm. In the absence of ventilation test chamber. The top of the specimen (6.4 mm place) is clamped with a clamp on the bracket and the longitudinal axis of the specimen is kept vertical. The lower end of the specimen is 9.5mm from the lamp tip and 305mm from the dry absorbent cotton surface. Bring the Bunsen burner and adjust it to produce a blue flame with a height of 19mm. Place the Bunsen Lights flame at the bottom of the sample for 10s, then remove the flame (at least 152mm away from the specimen) and write down the sample. Burning time. If the flame of the sample within 30s after removal of the flame is extinguished, the original lamp must be moved under the specimen again, re-ignite the sample for 10s, and then remove the Bunsen burner again and note the flame burning And flames burning the burning time. If the sample droplets drip, let it fall into the sample under the 305mm cotton, to see whether it ignited cotton. If the absorbent cotton is on fire, the rating should be taken into account. Specific grading indicators are as follows. Test Item 94V-094V-194V-21 Ten-time ignition Total flame burning time Maximum value (S) Individual flame burning time Maximum value (s) Flameless burning time (s) Yes Flame drop No No Allow only short time Burning general UL yellow card on the thickness of the test strip is divided into: 1/8 inch, 1/16 inch, 1/32 inch thickness, that is, 3.2mm, 1.6mm, 0.8mm three grades test.
Q: US direct mail dysonhp01 Dyson air purification cooling machine triple in the country to warranty it
Among them, the extruded polystyrene gypsum composite board is based on paper gypsum substrate, the use of adhesive and extruded polystyrene board through the factory processing compound
Q: Gree air conditioning 50 heating and cooling mechanism heat when the host cooling network is how the matter
Not the ,,, mobile air conditioning inside the compressor, the winter heating also need the compressor, but also a ventilation pipe, charged heating Well?
Q: Do 3cm thick wall insulation how much kilogram of slurry and how many kilograms of polystyrene particles
You are talking about the construction measures it is not the house measures it, because the house has a construction of Huohuohuohuo number of leather and bronze sculpture drawings and specifications, high-rise building scaffolding should be lightning protection measures, that is, under the scaffolding around Reliable grounding (not less than four times, not less than 16 square copper core BV line), if it is pick plus, and the house can be connected to the pressure ring. Tower crane I will not say, upstairs has been said.
Q: What is the whole heat exchange fresh air ventilator?
Depends on the main control panel is not cold and warm, single cold common motherboard. Only a generic motherboard can be changed. In the single cold air-conditioning on the outdoor machine to install the appropriate specifications of the four-way valve, adjust the amount of refrigerant to the appropriate level can be.
Q: External wall insulation method of operation There are several combinations of materials
30-150 per square meter has, mainly to see the material, thickness and so on
Q: The installation method of ordinary air conditioner. The more detailed the better. Please thank you all
2.1.23 step distance liftheight the distance between the upper and lower horizontal axis of the axis of each other. 2.1.24 pole vertical (cross) distance longitudinal spacingofuprighttube Scaffolding vertical distance between adjacent rods. 2.1.25 Vertical distance transversespacingofuprighttube Scaffolding Horizontal distance between adjacent vertical rods, single row scaffolding for the outside pole axis to the wall distance.
Q: In the design, the building structure and the hydropower are generally designed by the Architectural Design Institute. The air conditioning ventilation is based on the design of the room. Or first air conditioning ventilation? More
Normal heat absorption is also due to poor ventilation (dirty) and air humidity so icing
Q: HVAC Heating: What are the main components of the air distribution system?
Geothermal construction, the heating pipe spacing can not be less than 100mm, the construction can not be achieved, big brother!

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords