2015 plastic concrete formwork system, better than aluminium / peri formwork system
- Loading Port:
- Ningbo
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 100 m²
- Supply Capability:
- 10000 m²/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Plastic construction formwork
plastic concrete formwork system
Saving your time, money and energy !!!
What is Details of our products plastic concrete formwork ?
Features:
1. Long lifespan& Cost effective -- Plastic formwork can be reused over 100 times,
where Plywood can only be reused 3 to 5 times. Therefore the Plastic Formwork
is more cost effective.
2. Waterproof -- As the nature of plastic material. It's imputrescible and rustless,
especially suitable for underground and watery circumstance.
3. Interlocking Design -- No release agent needed, good effect of demolding.
4. Easy deassembly -- The template will be separated easily from concrete
5. Simple Installation -- Light weight and safe to handle, easy cleaning and very robust.
6. High Quality -- Abrasion resistance, excellent mechanical property, best impermeability.
7. Recycable -- Waste scrap molding board could be recycled.
What is Advantages of our company ?
Our anvantages
| High quality |
Reasonable price | |
Strict delivery time | |
Good after-sales service | |
Profession maker for 21 years | |
Gold supplier 9th year | |
Strict quality control | |
professional injection mould | |
3D design |
Product Photos/ plastic concrete formwork
FAQ:
1.Q:Are you a factory or trading company?
A: We are the factory of plastic formwork.
2.Q:Where is your factory located? How can I visit there?
A: Our factory is located in Taizhou City, China.You can fly to Ningbo airport directly.All our clients, from home or abroad, are warmly welcome to visit us!
3.Q:How can I get some samples?
A: We are honored to offer you samples.
4.Q:How does your factory do regarding quality control?
A:"Quality is priority. we always attach great importance to quality controlling from the very beginning to the very end. Our factory has gained ISOTS16949 authentication.
If you are interested in our plastic formwork , please feel free to contact with us by email. We will quote you the best price, if you have drawings, we can help you caculate the quantity of plastic formwork .
Any building drawings is OK, just send us your drawing, we can make the plastic formwork quantity for you.
And we warmly welcome friends from all over the world to visit our factories for business.
- Q:Shear wall plastic template for the wall height and thick ratio requirements is how much?
- Shear wall plastic template support: the wall height of 2800, wall thickness 300, for example, using 12mm template, vertical sub-rib spacing (center distance) for the 200-250mm; 15mm template, vertical sub-Leng spacing (center distance) For 250-300mm. Compared with the normal use of bamboo plywood template, the distance between the second time, the roughness of the concrete surface is basically the same, but the concrete surface smooth, to achieve the effect of water concrete, perception quality is better. To meet the requirements of cast-in-place concrete wall forming and surface quality. Construction template structure should be simple, light weight, durable, easy to manufacture.
- Q:Who used plastic building templates? How is the effect? What are the advantages and disadvantages?
- Plastic construction template is not a good place to say, talk about the shortcomings of it, 1: the quality is too heavy, 2 intensity is not very satisfactory, 3, a little fee wooden side
- Q:Plastic building template made of what material
- Plastic template (that also can be said that the composite template)
- Q:What is the economic benefits of building wood formwork compared to plastic molds?
- In summary, what template to use depends on what your structure needs.
- Q:How does the concrete on the plastic template remove (already glued to the concrete)
- Stupid way, with a little hammer little bit of the beat, out a little less a little bit.
- Q:Will the plastic building template on the builders really do not use the price is how much price
- Easy to use, heat insulation. A lot of building materials market there ah, to see what you want the model, the price range,
- Q:Plastic deformation of the template how to solve or why the deformation Thank you I want the reason
- The lower the density of the foam board is easier to deform.Crust foam can be changed to coextrusion foam. General cross-linking or blending halogenation and other methods to improve Vicat. Reduce traction override
- Q:Why the floor is not plastic building materials square wood and template
- Is the plastic strong? The environment on the site you know, throw off how to do, have to find strong and durable.
- Q:Who used it, how not universal.
- 4. The product pouring concrete surface smooth, bright as a mirror, to meet the requirements of decorative and decorative water, eliminating the need for secondary plastering process. 5. Turnover times more than 50 times, the template each time the amortization cost is less than 3 yuan, steel frame plastic template turnover times more than 300 6. The material is non-toxic, harmless, pollution-free, 100% recovery, green products The 7. The product acid, alkali, anti-corrosion performance. Product use temperature of -80 ℃ ~ 100 ℃, good weather resistance.
- Q:Why is the building template made 1830mm * 915mm and not made 2000mm * 1000mm it?
- You can do that kind of ah! Raw materials are not easy to find
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
2015 plastic concrete formwork system, better than aluminium / peri formwork system
- Loading Port:
- Ningbo
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 100 m²
- Supply Capability:
- 10000 m²/month
OKorder Service Pledge
OKorder Financial Service
Similar products
New products
Hot products
Hot Searches
Related keywords