• EANTE Square wall formwork 300×1800×80A System 1
EANTE Square wall formwork 300×1800×80A

EANTE Square wall formwork 300×1800×80A

Ref Price:
get latest price
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Haiyuan New Material possesses china’s first fully automatic long fiber reinforced thermoplastic composite   mould pressing production line with independent intellectual property, referred to as LFT-D line.

Why we developed EANTE formwork?

Superiority:

General worker can assemble and remove easily, save more labor cost.

The reinforcing ribs of EANTE formwork can be used to instead of the steel tube and wood.

Preassemble the EANTE formwork in the factory and fix it in the construction location.

The size accuracy of the composite formwork is better than that of the steel formwork and the wooden formwork. The concrete surface cast by EANTE Formwork is quite smooth, without any flaw, and no release agent is    applied to assist the formwork removing.

We developed our own software with the characteristics as follow:

a. Computation time: it depends on the complexity of the architecture drawing;

b. Construction drawing: it is shifted from assembling drawing easily;

c. Material list: the assembling designing software would generate a list of formwork elements and auxiliary  products.

Enviromental:  EANTE Formwork is made from composite material, which is low-carbon, recyclable and environment-friendly.

Saftness: The labor, large equipment, electric saws and iron nails are used much less on the building site,   which leads to simplified on-site management and the safer construction.


Q:The price of raw materials can say better, is the PVC material.
Templates in accordance with the different prices of materials are also very different. The general plywood is 50-65 / sheet.
Q:Plastic building template where there is an urgent need to solve
Plastic construction template turnover can reach more than 30 times, but also recycling. Temperature to adapt to a large range of specifications adaptability, can be saw, drill, easy to use. Temporal surface of the template, smoothness than the existing technical requirements of the water concrete template, a flame retardant, anti-corrosion, anti-water and anti-chemical corrosion function, have better mechanical properties and electrical insulation properties. Can meet a variety of cuboid, cube, L-shaped, U-shaped building support model requirements.
Q:Types of building templates? What is the water template?
The type of template, according to the material to wood template, steel formwork, bamboo template, Gangmu combination template, etc.
Q:Plastic construction template has no one used? How about the effect of using. How much can the main savings? Can really use 50 times?
Solid can use foam technology to save costs, there is a hollow drawback in the use of the process, in the corner when the nail easily broken.
Q:Europe and the United States national construction template is made of plastic or wood
With plastic construction, then, is the most solid touch on the back, Europe and the United States part of the country after the earthquake so the use of wood plus wire
Q:Why the floor is not plastic building materials square wood and template
Is the plastic strong? The environment on the site you know, throw off how to do, have to find strong and durable.
Q:What is the economic benefits of building wood formwork compared to plastic molds?
The quality of the template is related to the quality of concrete engineering. The key lies in the accurate size, the assembly is firm, the patchwork is tight and the assembly and disassembly is convenient. Should be based on the structure of the form and characteristics of the appropriate form of template, in order to achieve good technical and economic results.
Q:Plastic mold dynamic template, the size of the template
Bigger than the fixed model on the line, a good folder folder.
Q:How does the concrete on the plastic template remove (already glued to the concrete)
Stupid way, with a little hammer little bit of the beat, out a little less a little bit.
Q:Why is the building template made 1830mm * 915mm and not made 2000mm * 1000mm it?
Can be ruled length processing, can be ruled length processing, can be ruled length processing

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Related keywords