ZL15(CTX920) 1.5 ton Mini Wheel Loader/Front End Loader
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 set
- Supply Capability:
- 100 set/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Description of CTX920:
• Low fuel-consuming, high-quality turbo charged engine has good power performance and big torque reserve.
•Double rocker with better visual field. Short wheel base chassis improves steering flexibility and operation efficiency.
• Steering system provides flexible steering operation.
•Unique energysaving patent technology, including double pumps and double circuits, turning priority and unloading hydraulic pressure system, is efficient and energy-saving with better power performance and lower fuel consumption.
•Turbo hydraulic torqueconverter together with dynamic planettype gear box enables a wide and high efficient range and facilitates the gear shifting.
• Bigger driving axle, 4-wheel drive ensures excellent towing performance.
• Four-wheel, dual-line and pliers disc braking system ensures safer and more reliable operation.
•The soundproofing, heatproofing and shockabsorbing driver’s cab has a spacious operating space, a broad view and comfortable adjustable seats, specialized cool & hot air-condition can also be equipped.
• Z-form connecting rod has strong breakout force and high raising ability, and enables high operating efficiency.
•Low alloy material and alloying blade and corner tines are used for the bucket, which is stronger and more durable.
• Higher dumping height and biggest dumping reach.
• The front loader frame provides good machine stability and stronger structural strength.
• Rational matching parts, superior machine performance and extraordinary operating efficiency.
• Various optional equipments and buckets can satisfy different needs of customers.
Technical Specifications of CTX920:
FAQ:
1.How about the shipment?
You can put 2 sets of of wheel loaders in one 40HQ container. The spare parts are packed with boxes.
The delivery time is 20 days.
2. What about your service?
• Reply your inquiry in 24 working hours.
• Experienced staffs answer all your questions in professional and fluent English.
• Customized design is available. OEM is welcome.
•Exclusive and unique solution can be provided to our customer by welltrained and professional engineers and staffs.
• Special discount and protection of sales area provided to your distributor.
• Do the best reliable heavy-duty single drum vibratory road roller in China.
• Warranty period is 1-year or 1500 working hours against Bill of Lading.
- Q:What are the differences and characteristics between a fully hydraulic bulldozer and a hydraulic bulldozer?
- The main difference is that the power output is different:1. power transmission route of full hydraulic bulldozer: engine hydraulic pump hydraulic motor sprocket track.
- Q:What if Alice was chasing rabbi's and the smoking caterpillar was a broken bulldozer?
- Go ask Alice...I think she'll know
- Q:depreciates by 20% of its value in the value in the preceding year. Let Vn be the value of the bulldozer in the nth year. (let n=1 be the year the bulldozer is purchased.)What is the formula for Vn? and in what year will the value of the bulldozer be less than $100,000?pls show your solution so that i can understand it easily...pls...thank you
- V(n+1) = 0.8 V(n) year V(n+1) would be the current year and V(n) would be the last year if you work through it we find that in the fourth year the value is less than 100000
- Q:i have a socket 775 motherboard is it worth getting an am3+ motherboard and a bulldozer 4 core at 3.6ghz or stick with 775 and get a core 2 quad at 3ghz ?
- I'd go with the bulldozer one, since core 2 quads are sort of unreasonably expensive at this point in time, and the price to get a good core 2 quad would be roughly the same as a decent AM3 motherboard and bulldozer processor. However, like the others said, an 1155 socket motherboard and SB processor is a far better option.
- Q:AMD Phenom II 965 X4 BE 3.4GHZAMD Phenom II X2 565 CallistoAMD Phenom II X6 1090T Black Edition Thuban 3.2GHzor wait for Bulldozer
- AMD Phenom II X6 1090T black edition thuban 3.2GHz will be more than enough for future 1-2 years... if you are getting it for games, you will be very happy with it.
- Q:Does anyone else find it honestly pathetichow a guy was able to drive a slow moving bulldozer through a main street, toppling over countless cars, injuring over 30, killing 3, for THIRTY MINUTES?what the hell was the jerusalem police doing?oh, and if im missing any details and it completely undermines my logic.please feel free to tell me.
- they were too busy shooting down palestinians near the border www.thewe /weplanet/news/middle_east/palestine/lest_we_forget.html
- Q:I heard these are AMDs new processors is tagging true ? Also are these better than Intels i3 or i5 or i7
- Why this brand new Eight Core didn't beat out the older Sandy Bridge processor I will never know. I mean they can see the quad core sitting there. Why not surpass the i7 2600? I mean when Sandy Bridge came out and they got over their Sata issue it was HUGE. As you can see in the benchmarks the Sandy Bridge i7 2600K quad core is beating the 8 core.
- Q:What do you call those machines that dig?
- Back hoes.
- Q:How deep could one man, with a shovel, pickax, a cheap bulldozer, and a jackhammer, dig in 3 months?
- You'd get all the way down to bedrock in no time. Then the only tool that'd keep working would be the jackhammer. You couldn't go but about 3 feet a day with that. And then there's the whole filling up with water thing to consider, and since you don't have a pump, you'd have to hold your breath between each shovel full. So I'd say about 60 feet is all. Now if you had some dynamite...
- Q:....what else will I need?
- Soooo dramatic! How big of a tree you getting? The one for the Capital?
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
ZL15(CTX920) 1.5 ton Mini Wheel Loader/Front End Loader
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 set
- Supply Capability:
- 100 set/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords