Ws2811 Ip68 Square Pixel 50 Cnt 18Awg 12Volt
- Loading Port:
- Shenzhen
- Payment Terms:
- T/T
- Min Order Qty:
- 1 Piece pc
- Supply Capability:
- 3000 Packs pc/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Packaging & Delivery
Packaging Detail : 1 string is put in one plastic bag ,30pcs in one carton box.If
Customers need own type of packing.relative cost will be added
accordingly.
Delivery Detail : 5-14 day after 30% earnest by T/T or Western Union.
Trade Terms:
1.Payment : By T/T /Western Union /Paypal
100% payment if the total amount is less than USD 30.000
30% deposit and 70% balance before shipment if the total amount is more
than USD 30.000
2.Lead time : 5-15 working days.subject to the order quantity.
3.Delivery ways : DHL,UPS door to door service by sea,by air etc.
4.MOQ : 1 string
Specifications
1.WS2811 LED pixel node,
2.DC5V input, full color RGB string,
3.50pcs a string,
4.IP68 rated
Details:
Modle | BLS-F8RGB-11-50-SQ |
Working Voltage | DC 5V |
Wattage | ≤15W/string |
Current | ≤3A/string |
LED Type | F8 RGB |
Emit Color | Full color |
View angle | 270° |
LED Bulb Q'ty | 50pcs/string |
Bulb Size | 20mm x 15mm |
Length | 5 meters |
Packaging | 50pcs/string |
IC Type | WS2811 |
IP Rate | IP 68 |
Working Temperature | -20---+50°C |
Storing Temperature | -40--+60°C |
Application
1.Meets the general lighting environment such as: Outdoor advertising christmas decoration
Our Service
1.Reply your enquiry in 24 working hours
2.Experienced staffs answer all your questions in fluent English
3.Customize design is available.OEM&ODM are welcome
4.Exclusive and unique solution can be provided to our customer by our well-trained and professional engineers and staffs
5.Special discount and protection of sales area provided to our distributor
Quality Control:
Delivery:
Shipping Service | Estimated Delivery Time |
DHL | 2-8 business days |
FedEx | 3-8 business days |
TNT | 2-10 business days |
UPS | 1-7 business days |
EMS | 6-14 business days |
ePacket | 7-12 business days |
China Post Air Mail | 7-15 business days |
China Post SAL | 14-30 business days |
Air freight | 3-10 business days |
By Sea | 30-40 business days |
1. 3-5 business days for Sample Orders; 7-30 business days for Bulk Orders for Bulk Orders.
2. "Business days" means Monday-Friday, excluding holidays.
3. DHL and UPS cannot ship to military or P.O. boxes address
4. The Shipping Service above is for reference only, for any other questions, please feel free to contact us.
Factory:
- Q:Jiaxing Shenghui lighting treatment?
- lots Shaopian dorms not convenient to go out 9, for love comfort for people, occasionally playing soy sauce
- Q:Aomori Festival
- Nebuta (nebuta Festival): Nebuta, it is representative of the resistant cloth, summer festival, Aomori Aomori Hirosaki City, five Sichuan original stand, Mutsu ominato area.
- Q:What are the main points of power distribution and lighting energy-saving supervision?
- , strictly check the curtain wall energy saving project materials, components, etc., and their varieties and specifications shall comply with the design requirements and relevant standards.
- Q:Lighting line connections?
- In parallel circuit, switch line closed, switch branches closed, bulb shine, switch line disconnect switch, the branch is closed, no light bulb, indicating switch line can control the whole circuit, the switch can control the branch branch.
- Q:About the brightness of LED lighting
- The second problem is that the spotlight cup uses only the angular astigmatism of the LED itself
- Q:Energy saving of urban lighting
- The focus of urban lighting energy-saving work is urban nightscape lighting. A) implement a single project in accordance with the overall urban lighting plan
- Q:Building lighting in lighting, lighting should pay attention to what details?
- . Besides the light distribution characteristics, the appearance, material, dustproof, waterproof grade and so on are all the factors that must be taken into consideration.
- Q:What does elevation lighting mean?
- Building facade lighting design and other lighting design are very different, it is based on the original building, through the bright lighting changes, color changes to show the characteristics of the building. Therefore, we must fully understand the design of building function, building network
- Q:What are the energy saving measures for lighting and distribution?
- the office, the computer room, the control room, the shop, the dining room, the guest room and the bathroom mirror lamp and so on should use the straight tube lamp, the decoration request high place may use the compact fluorescent lamp (hereinafter called CFL)
- Q:Notes on installation of lighting for 105W high power energy-saving lamp factory building
- , after all, the market is mixed with many products, uneven quality.
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Ws2811 Ip68 Square Pixel 50 Cnt 18Awg 12Volt
- Loading Port:
- Shenzhen
- Payment Terms:
- T/T
- Min Order Qty:
- 1 Piece pc
- Supply Capability:
- 3000 Packs pc/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches