WIRING DUCT 94-V-2
- Loading Port:
- China Main Port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 500m m
- Supply Capability:
- 1000000 Meter/Meters per Month m/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Specifications of WIRING DUCT 94-V-2
WIRING DUCT
Feature : Composed easily, not peel, smooth match and won't be hurt.
Color: Gray.
CE,ROHS,REACH,SGS,94-V-0.
WIRING DUCT
Usage of WIRING DUCT 94-V-2
Usage : Fixed the bottom duct first and put wires in duct then close the cover cap.
Feature : Composed easily, not peel, smooth match and won't be hurt.
Construction of WIRING DUCT 94-V-2
Composed of bottom duct and cover cap, slot holes in both side.
Material: Made of Hardness Lead-Free PVC UL-94V0
Color: Gray
Mounting Method: Standard Mounting Holes
. Recognized continuous use temperature: +122 °F (+50 °C)
- Q:Apple 6splus charge may not support this accessories how to do more
- Sometimes no way, the problem to the owners to solve the common, must wear, the owners agreed
- Q:Do not know why not mislead. The The The The The Fire resistance is IECGBBS6387. GB is the general principle of flame retardant and fire resistant wire and cable, quoted the above criteria...........................
- Directly to find Dell customer service bar, the general warranty period are free replacement, unless the insurance of the. You can extend the warranty period, it seems you like to do the experiment.
- Q:This cable or accessory has not been certified and may not be able to work with this iphone reliably
- The installation process is a certain requirement, high and low voltage cable bridge should be installed separately as usual, a wall laying vertical pipeline (slot) or installation equipment, the power distribution between the depth of D1 = 1200 ~ 1500mm; weak Between the deep distance from the D2 = 1100 ~ 1400mm more reasonable. The length L1 and L2 between the power distribution and the weak can be determined according to how much electrical equipment and pipelines (slots) are installed in the room. "Civil building electrical design specifications" proposed "shaft size in addition to meet the wiring spacing and terminal box, distribution box layout must be the size, but also in the box before the left not less than 0.8m operation, maintenance distance" requirements. In the weak equipment, the operation and maintenance distance is not specified in the provisions of the Code for Electrical Design of Civil Buildings, but it should not be less than 0.8m. Cable to wear steel pipe wiring, should be reserved in the floor steel pipe, wiring should be completed after the plug fire fire blocking material. Cable bridge installation should be horizontal, the maximum sag should not be greater than 10 mm; proposed separate installation
- Q:Decoration when the purchase of water pipes, wires and other items included in the account
- Outdoor fire line must use fire-resistant KVV cable, wear pipe protection.
- Q:Why does the bird stand on the wire without anything, but if people touch it,
- National standard line, no problem. Do not pick up the heater in winter. If not the national standard line, that copper is not easy to go wrong, then use, from time to time touch the line is not hot, there is no problem.
- Q:How to determine how much wire and cable should be used, the current load and how the corresponding wire, such as 4BV, under what circumstances, YJV240 what circumstances, the load is much more
- The second floor of the formula is correct, my space also have this formula, with armor and no armor in the current no difference, there are differences in the installation, usually buried to armor, overhead or bridge without armor, you give the model is not Armor, YJV-4 * 240 without armor, YJV-22-4 * 240 armor,
- Q:Wire and cable model ZD what does it mean
- The middle of the line is not a problem where there is a problem in the place where the joints check the place of the joints can not do the lines are out to check the time and effort
- Q:Four lines only reached a phase line, at the other end all charged, I use the digital pen! In addition, I often check the cable when the cable current through the dot digital pen voltage symbols sometimes have time to disappear, in other bare wires when the test keys are normal! What is this going on! Ask the heroes to give the younger brother a complete point of the answer! More
- There are [the top of the machine can be broken off the ball can be hit by Jiu turtle snow box video output cable and DVD video output line] into a junction box, and then through the sub-box toggle switch to select the 'set-top box' or 'DVD'; This junction box outputs a wire connection device or is connected to a TV.
- Q:Apple phone display cable or accessories not certified how to do
- and then the audio cable and video cable [audio line (red and white), the first time the signal line (white) Video line (yellow)】 corresponding to the color connection set-top box with TV
- Q:Rt, the charger did not change, has been no problem before, today just plugged into the charger, the results appear as if the problem, before the out of this problem, and now only ipad power off after the power can not be charged, and ipad start , Then immediately prompted the title, can not charge more
- Budget 1W5 requires the whole machine to include the display of the monitor not too big too much Not used to more
1. Manufacturer Overview |
|
---|---|
Location | Zhejiang,China |
Year Established | 2006 |
Annual Output Value | Above US$1 Million |
Main Markets | Mid East;Western Europe;North America |
Company Certifications | ISO 9001:2008; |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | Ningbo |
Export Percentage | 90% |
No.of Employees in Trade Department | 15 People |
Language Spoken: | English;Chinese; |
b)Factory Information | |
Factory Size: | Above 100,000 square meters |
No. of Production Lines | Above 3 |
Contract Manufacturing | OEM Service Offered;Design Service Offered |
Product Price Range | Average |
Send your message to us
WIRING DUCT 94-V-2
- Loading Port:
- China Main Port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 500m m
- Supply Capability:
- 1000000 Meter/Meters per Month m/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords