V2G Split-type Two-way Charging Equipment
- Loading Port:
- China main port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 10 unit
- Supply Capability:
- 10000 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
V2G Split-type Two-way Charging Equipment
According to energy storage power station, interactive smart grid and optimized using of energy resources, EAST developed the new generation of power products, being as two way converter of AC DC, DC AC linked to public power grid in energy storage, photovoltaic, micro network system. Split-type charger consists of two-way rectifier cabinet and outdoor charging sets, using modular design, single rectifier module and inverter module is 50kw. It is applied to be fit for charging station and the operation of enterprises’ parking lot.
Split-type public charger I series: Output voltage range DC250V ~ 750V settable, the maximum output power of single unit is 50KW.
Split-type public charger II series: Output voltage range DC250V ~ 750V settable, the maximum output power of single unit is 150KW.
●It consists of IGBT converter devices, AC/DC filter devices, soft starter, monitor, isolation transformers and protection devices etc
●It is featured with power grid peak regulations, improving power grid quality, new energy access and other functions
Model | EVDC-50KW-V | EVDC-150KW-V |
Input | ||
Input voltage(V) | 323~475(three phase five wire) | |
Input current(A) | ≤300 | |
Input frequency(Hz) | 45~65 | |
Efficiency | ||
Power factor | ≥0.99 | |
Input THD | ≤5% | |
DC output | ||
Output voltage range(V) | 700Vdc series:250~700V | 700Vdc series:250~700V |
Output rated current(A) | 80 | 240 |
Max. output current(A) | 85 | 250 |
Soft start time(S) | 3~8 | |
Output constant-current range | 10%~100% | |
Voltage regulation accuracy | ≤±0.5% | |
Stable current precision | ≤±0.5% | |
Ripple coefficient (peak value) | ≤1% | |
Current-sharing unbalanced degree | ≤±5%,(50%~100%rated load) | |
Noise(dB) | <55 | |
Inverter output | ||
Output voltage range(V) | (three phase)400V±15% | |
Max. efficiency | ≥93% | |
Frequency range | 47-51.5Hz | |
Power factor | ≥0.99 | |
Output THD | ≤5% | |
THD | <3%(rated load) | |
Power factor | 0.9(leading)-0.9(lagging) | |
Protection | ||
Output short-circuit protection | Retraction current≤40%Io, Resettable | |
Output over-voltage protection | No output after protection, Non-recoverable (require manual recovery) | |
Input over/under voltage protection | No output after protection. Resettable | |
Phase-lack protection | No output after protection. Resettable | |
Over-temperature protection | No output after protection. Resettable | |
Charging configuration and standard | ||
Charging plug number | / | |
Charging cable length(m) | / | |
Communication protocol standard | GB/T 27930-2011, NB/T 33003-2010 | |
Charger standard | NB/T 33001-2010,NB/T 33008.1-2013 | |
Environment | ||
Working Temperature (℃) | -20~+50 | |
Storage temperature(℃) | -40~+80 | |
Relative humidity | ≤95% | |
Atmospheric pressure(kPa) | 70~106 | |
Mechanical parameter | ||
Dimensions(H*W*D)(mm) | 2000*600*600 | 2000*1200*800 |
Weight(kg) | ≤620 | ≤1500 |
IP degree | IP31 |
· Q. What is an UPS and What it is for ?
An uninterruptible power supply (UPS) is a device that allows your computer or telephone switch or critical equipement to keep running for at least a short time or longer time when the primary power source is lost. It also provides protection from power surges, spikes, brownouts, interference and other unwanted problems on the supported equipment.
· Q. How long the UPS to run when power goes?
This can take 3 paths.
1.You can pick a UPS that is rated for pretty much the full VA you need so it will be running at 100% of capability and will thus last 'n' minutes.
2.You can pick a UPS that is rated at a much higher VA value than you really need so, for example, is running at 50% of capability and will thus last for longer than the UPS from option 1.
3.You can use extra external battery packs to run for longer. If charging capability allows, the more and the bigger batteries you take with, the longer time UPS runs.
or using a generator after about 6 hours, it will be more cost-effective, with a short runtime UPS to bridge the generator start-up gap.
Send your message to us
V2G Split-type Two-way Charging Equipment
- Loading Port:
- China main port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 10 unit
- Supply Capability:
- 10000 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords