• Timber Beam Formwork of Component with high standardization System 1
  • Timber Beam Formwork of Component with high standardization System 2
  • Timber Beam Formwork of Component with high standardization System 3
  • Timber Beam Formwork of Component with high standardization System 4
  • Timber Beam Formwork of Component with high standardization System 5
  • Timber Beam Formwork of Component with high standardization System 6
Timber Beam Formwork of Component with high standardization

Timber Beam Formwork of Component with high standardization

Ref Price:
get latest price
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
1 m²
Supply Capability:
10000000 m²/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

1.   Structure of Timber-beam Formwork

.Timber beam wall formwork is used for the concrete pouring of wall. The application of large areas formwork has greatly increased the construction efficiency and reduced the cost.

. The system is convenient for construction and it is easy to control the quality.

.The system has two parts, formwork and pull-push props. The formwork is made of plywood, timber beam and steel waling. Pull-push props can be designed according to the project or simply select the standard props. Tie-yoke and tie-rod are used to reinforce the corner.

 

2.   Main Features of Timber-beam Formwork

.Standardized production lines

.Light weight

.Easy transportation and storage

.Finger jointing of the flange and web, the strength of timer beam is highly improved

.Well treated to prevent from water penetration or erosion, so the service life maximally extended

.Robust caps at the end of the girders protect against damages


3.   Timber-beam Formwork Images



4.   Timber-beam Formwork Specification

.Shearing force failure load: 40kg

.Supply capability: 3000m/day, L=6600mm

.Lifespan:4~5 years

.T=18mm&T=21mm

.In standard thickness, moisture content 10%


   5.  FAQ of Timber-beam Formwork

    1) What can we do for you? 

.We can ensure the quality of the vinyl banner and avoid extra expenses for customers.    

    .We can provide you the professional design team.    

    .We can provide fashionable and newest styles for you.    

    .We can design the artwork for you.    

    . Please feel free to customize.  

 

   2) What promises can be done by us?

   . If interested in Timber-beam Formwork, please feel free to write us for any QUOTE.

   . If printing required, please advise asap because the whole set need much more time to complete.

   . Please DO check goods when courier knocks your door and contact us asap if any issue.

 

 3) What about of our after-sale service?

   . Response will be carried out in 24hours  after receiving any complain or request.

   . Timber-beam Formwork cost can be refund after order is confirmed. 

   . If the products are not based on the requirements, there will be the relevant compensations made for you.  

 

 4) What about the package and shipping time?

    .Packing:  As Customer's Requirements

    .Shipping: We have various shipping ways for our customers, such as express which including TNT,  DHL,  FEDEX, UPS, EMS, etc. ; by air/ sea, and we are VIP of these express.  

  .Shipping time:

    Normally small orders, it just 10-15 business days to arrive your hand; When comes to the customs declaration, it may need 7 days. 

    Other mass qty of Timber-beam Formwork, we send them out by sea or by air to sea port or air port to save some shipping freight for our customers. By ocean, it may need 45~60days, by air, it may need 25~40days.  


Q: What is the use of building wall formwork support? Thank you
In the construction for concrete cast-in-place construction formwork supporting structure, widely used in steel or timber beams assembled into the template bracket
Q: Technical specification for construction formwork safety JGJ162-2008 who has made me please
Safety code for construction formwork JGJ 162-20081 General Provisions1.0.1 for the implementation of the construction project template construction of China's safety production principles and policies to achieve advanced technology, economic and reasonable, easy to apply and to ensure safety in production, the development of this specification.
Q: 1, JGJ162-2008 construction formwork safety technical specification;2, JGJ130-2011 construction fastener type steel pipe scaffolding safety technical specifications; the friend has. Send me thanks
3 2.1.12 flying die flying shuttering mainly by the platform board, support system (including beam, support, support, legs, etc.) and other accessories (such as lifting and walking mechanism, etc.). The utility model is a large tool type template, which is called a table mould or a table model because of the appearance of the utility model. Because it can take advantage of lifting machinery, pouring from the well under the floor of the lift out of the transfer to the upper layer of repeated use, so called flying mode. 2.1.13 tunnel mode tunnel shuttering a combination of stereotypes template, while pouring concrete wall and floor of the template, because the shape of the template like a tunnel, it is known as the tunnel model.
Q: 86335 template support, what is the concept of those advantages
In the case of the construction industry, after 20 years of this industry, dedicated to technical analysis and improvement. After painstaking research, invited the domestic industry elite Magi to discuss, repeated demonstration, combined with the actual measurement through the practice of technical staff, spend long time hard work. Finally invented this new type of digital steel template support combination structure, so far spent ten years of painstaking research on the huge sums of money technology finally succeeded. To fill the gaps at home and abroad (with our understanding of the current international and domestic architectural template combination structure has not been any new structure), and won the national invention patent.
Q: Since the building, and I would like to ask some of the basic knowledge to the construction of a unified drawing, plus or minus 0 and the height of the drawings, the roof slope requirements. Now the blue steel reinforced concrete inclined roof beams or do. Here we use multiple beams, and the waterproof, thermal insulation, in tile. Anyway, many shortcomings is wood, attic space basically scrapped, there is a fire started...I would also like to use concrete flat top, that is, do not let, more depressed.If I can use wooden beams, waterproof SBS, hanging plastic extruded board?The construction of plastic extruded board in inclined roof beams hung strong? Construction is not difficult?As well as the 8X11 meters of the roof, 30 degrees slope, sloping roof concrete cost about? I feel modeling and cloth reinforcement are very troublesome, expensive cost estimation
You can put the beam properly after the play flowers on top, which is the slope of the wall, so that you can
Q: What is the building template support
(1) the material of the template support: high performance cold rolled steel, thickness of 2.5 mm to 2.7 mm, the new material is characterized by: corrosion resistance, elasticity, strong deformation.(2) the specification of new steel building formwork support:

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords