• China Timber Beam Formwork with High Standardization in Construction System 1
  • China Timber Beam Formwork with High Standardization in Construction System 2
China Timber Beam Formwork with High Standardization in Construction

China Timber Beam Formwork with High Standardization in Construction

Ref Price:
get latest price
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
1 m²
Supply Capability:
5000 m²/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

1.Structure of Timber Beam Wall Formwork Description 


There is a prizing part designed in the corner, which can help to position and remove formwork easily.The plywood is screwed on from the back when connecting frame and plywood, so the surface of the finished concrete is perfect.Finger jointing of the flange and web, the strength of timber beam is highly improved, which the shearing force failure load :40KG.With CNBM timber beam & WISA plywood, the formwork is low weight but high load capacity,it is widely used in construction.


2. Main Features of Timber beam wall formworks

         -Standardized production lines with supply capability :3000m/day, L=6600mm

         -Robust caps at the end of the girders protect against damage

        -convenient for construction 


3. Timber beam wall formwork Images

4. Timber Beam Wall Formwork Specifications

     .Shearing force failure load: 40kg

     Timber beam column formwork is used for the concrete pouring of square or rectangle column. The system has the same structure and similar connection type with wall formwork.

 

5.FAQ of  Timber Beam Wall Formwork


1) What about of our after-sale services?

   . Response will be carried out  in 24hours  after receiving any complain or request.

   . If the products are not based on the requirements, there will be the relevant compensations made for you.  

   . Please DO check goods when courier knocks your door and contact us asap if any issueS.

 

 2) What about the package and shipping time?

     .Packing: wood package and adhesive tape

    .Shipping: by sea

    .Shipping time:

      Normally small orders, it just1week business days to arrive your hand; When comes to the customs declaration, it may need 2weeks.

      Other mass qty of Timber-beam Formwork, we send them out by sea or by air to sea port or air port to save some shipping freight for our                                             customers. By ocean, it may need 45~60days, by air, it may need 25~40days.  


 3) What promises can be done by us?

   . If interested in Timber-beam Formwork, please feel free to write us for any QUOTE.

   . If printing required, please advise asap because the whole set need much more time to complete.

   . Please DO check goods when courier knocks your door and contact us

4) What can we do for you? 

    .We can ensure the quality of the Timber Beam Wall Formwork and avoid extra expenses for customers.    

    .We can provide you the professional technical team.            

    .We can provide professional building proposal for your projects.    





Q: What is the use of building wall formwork support? Thank you
In the construction for concrete cast-in-place construction formwork supporting structure, widely used in steel or timber beams assembled into the template bracket
Q: Technical specification for construction formwork safety JGJ162-2008 who has made me please
This specification is applicable to the design, manufacture, installation and dismantling of the cast-in-place concrete engineering formwork system in construction.
Q: 1, JGJ162-2008 construction formwork safety technical specification;2, JGJ130-2011 construction fastener type steel pipe scaffolding safety technical specifications; the friend has. Send me thanks
3 2.1.12 flying die flying shuttering mainly by the platform board, support system (including beam, support, support, legs, etc.) and other accessories (such as lifting and walking mechanism, etc.). The utility model is a large tool type template, which is called a table mould or a table model because of the appearance of the utility model. Because it can take advantage of lifting machinery, pouring from the well under the floor of the lift out of the transfer to the upper layer of repeated use, so called flying mode. 2.1.13 tunnel mode tunnel shuttering a combination of stereotypes template, while pouring concrete wall and floor of the template, because the shape of the template like a tunnel, it is known as the tunnel model.
Q: 86335 template support, what is the concept of those advantages
86335 new formwork support structureDigital steel formwork support composite structureAt present, in the construction for concrete cast-in-place construction formwork supporting structure, widely used in steel or timber beams assembled into the template bracket, built into the scaffold to form a bracket supported by steel or wood, and with steel formwork concrete construction. The problem is to build and assembling workload, low construction efficiency, labour and material consuming and poor quality, waste of resources, not beautiful and difficult to adjust
Q: Since the building, and I would like to ask some of the basic knowledge to the construction of a unified drawing, plus or minus 0 and the height of the drawings, the roof slope requirements. Now the blue steel reinforced concrete inclined roof beams or do. Here we use multiple beams, and the waterproof, thermal insulation, in tile. Anyway, many shortcomings is wood, attic space basically scrapped, there is a fire started...I would also like to use concrete flat top, that is, do not let, more depressed.If I can use wooden beams, waterproof SBS, hanging plastic extruded board?The construction of plastic extruded board in inclined roof beams hung strong? Construction is not difficult?As well as the 8X11 meters of the roof, 30 degrees slope, sloping roof concrete cost about? I feel modeling and cloth reinforcement are very troublesome, expensive cost estimation
Here we use multiple beams, and the waterproof, thermal insulation, in tile.What is the waterproof tile?Timber can do SBS? Don't understand what you mean, if not the construction of SBS membrane surface; or SBS polymerization coating applied to the beams? Feel that is not necessary, just like a bit of preservatives, like the outside paint brush.
Q: What is the building template support
(3) the characteristics of the new steel building formwork support:Features: keel tight flexible connection not only makes the operation simple and easy, and the structure is stable;Features two: retractable keel allows you to be able to adapt to any size; characteristics of the three: the column and the keel is not only simple and more flexible connection;Features four: tie rod light not only save material, and is more flexible and firm, flexible fastener is a must;Features five: compared to the wooden beam structure is more accurate, more solid; characteristics of the six: the construction site is beautiful and clean, greatly enhance the corporate image, highlighting the strength of the enterprise;Features seven: labor, material saving, time saving, more secure; features eight: do not use wood, products can be reused, so that the construction cost is greatly reduced.Building houses are required to achieve a certain level of earthquake, so the general buildings are cast in situ floor and shear wall structure,Formwork supporting composite structure

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches