• Timber Beam Formwork of Building for Construction System 1
  • Timber Beam Formwork of Building for Construction System 2
  • Timber Beam Formwork of Building for Construction System 3
Timber Beam Formwork of Building for Construction

Timber Beam Formwork of Building for Construction

Ref Price:
get latest price
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 m
Supply Capability:
10000000 m/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

1. Structure of Timber Beam Wall Formwork Description 

.Timber beam wall formwork is used for the concrete pouring of wall. The application of large areas formwork has greatly increased the construction efficiency and reduced the cost.

. The system is convenient for construction and it is easy to control the quality.

 

2. Main Features of Timber beam wall formworks

Well treated to prevent from water penetration or erosion, so the service life maximally extended

Robust caps at the end of the girders protect against damages

-convenient for construction 

-easy to control the quality

-easy, rapid and economical.


3. Timber beam wall formwork Images


4. Timber Beam Wall Formwork Specification

.Shearing force failure load: 40kg

.Supply capability: 3000m/day, L=6600mm

.Lifespan:4~5 years

.T=18mm&T=21mm

.In standard thickness, moisture content 10%


5.FAQ of  Timber Beam Wall Formwork

1) What can we do for you? 

    .We can ensure the quality of the Timber Beam Wall Formwork and avoid extra expenses for customers.    

    .We can provide you the professional technical team.    

    .We can provide professional building proposal for your projects.        

 

2)  What about the package and shipping time?

    .Packing:  As Customer's Requirements

    .Shipping: We have various shipping ways for our customers, such as express which including TNT,  DHL,  FEDEX, UPS, EMS, etc. ; by air/ sea, and we are VIP of these express.  

  .Shipping time:

    Normally small orders, it just 10-15 business days to arrive your hand; When comes to the customs declaration, it may need 7 days. 

    Other mass qty of Timber-beam Formwork, we send them out by sea or by air to sea port or air port to save some shipping freight for our customers. By ocean, it may need 45~60days, by air, it may need 25~40days.  



Q:1, JGJ162-2008 construction formwork safety technical specification;2, JGJ130-2011 construction fastener type steel pipe scaffolding safety technical specifications; the friend has. Send me thanks
3 2.1.12 flying die flying shuttering mainly by the platform board, support system (including beam, support, support, legs, etc.) and other accessories (such as lifting and walking mechanism, etc.). The utility model is a large tool type template, which is called a table mould or a table model because of the appearance of the utility model. Because it can take advantage of lifting machinery, pouring from the well under the floor of the lift out of the transfer to the upper layer of repeated use, so called flying mode. 2.1.13 tunnel mode tunnel shuttering a combination of stereotypes template, while pouring concrete wall and floor of the template, because the shape of the template like a tunnel, it is known as the tunnel model.
Q:What is the building template support
In the construction for concrete cast-in-place construction formwork supporting structure, widely used in steel or timber beams assembled into the template bracket, built into the scaffold to form a bracket supported by steel or wood, and with steel formwork concrete construction.
Q:What is the use of building wall formwork support? Thank you
In the construction for concrete cast-in-place construction formwork supporting structure, widely used in steel or timber beams assembled into the template bracket
Q:86335 template support, what is the concept of those advantages
Product features:Features: keel tight flexible connection not only makes the operation simple and easy, and the structure is stable.Features two: retractable keel allows you to adapt to any size.Features three: the column and the keel of the clever self-locking connection is not only simple and stronger.Features four: tie rod light not only save material, and is more flexible and firm, flexible fastener is a mustFeatures five: compared to the wooden beam structure is more accurate, more secure.Features six: the construction site is beautiful and clean, greatly enhance the corporate image, highlighting the strength of enterprises.Features seven:: labor, material saving, time saving, more security.Features eight: do not use wood, energy saving and environmental protection, the product can be reused, so that the construction cost is greatly reduced.Improve efficiency: construction without any technology, will be, efficiency increased by 600%.Do not use: do not use a round nail, wire, wood, without any tools to reduce the cost of a large number of countries can save a lot of wood.High safety: complete steel structure, standard fasteners, tight structure, compact connection, safe and reliable.Beautiful and neat: construction site clean and orderly, easier to manage, improve the image of the project. High precision and stability.
Q:Since the building, and I would like to ask some of the basic knowledge to the construction of a unified drawing, plus or minus 0 and the height of the drawings, the roof slope requirements. Now the blue steel reinforced concrete inclined roof beams or do. Here we use multiple beams, and the waterproof, thermal insulation, in tile. Anyway, many shortcomings is wood, attic space basically scrapped, there is a fire started...I would also like to use concrete flat top, that is, do not let, more depressed.If I can use wooden beams, waterproof SBS, hanging plastic extruded board?The construction of plastic extruded board in inclined roof beams hung strong? Construction is not difficult?As well as the 8X11 meters of the roof, 30 degrees slope, sloping roof concrete cost about? I feel modeling and cloth reinforcement are very troublesome, expensive cost estimation
You can put the beam properly after the play flowers on top, which is the slope of the wall, so that you can
Q:Technical specification for construction formwork safety JGJ162-2008 who has made me please
Safety code for construction formwork JGJ 162-20081 General Provisions1.0.1 for the implementation of the construction project template construction of China's safety production principles and policies to achieve advanced technology, economic and reasonable, easy to apply and to ensure safety in production, the development of this specification.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords