Threshold
- Loading Port:
- Shanghai Port
- Payment Terms:
- TT or L/C
- Min Order Qty:
- 500 m²
- Supply Capability:
- 100000 m²/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Packaging & Delivery
Packaging Detail: |
thin film, pastic straps and plywood pallet |
Delivery Detail: |
30days |
Specifications of wood floor threshold:
1.wood moulding
2.moisture content:10-12%
3.specification: customized
4.CE ISO9001:2000
SOLID WOOD ADJUSTABLE MAPLE WOOD THRESHOLDS-WOOD MOULDING TWWA-09
1. size: customized
2.species: Fir, pine,oak, kempas,bamboo,mdf etc.
3.color: natural, white primer or stained
4.moulding name: wall base, stair nose, threshold, reducer,quater round etc...
5.technology: painting coating and water based primer
6.packing: thin film,plastic straps and plywood pallet
7.quality control: dimension tolerance must be strictly control within customer's requirement
Wood floor threshold:
1.Products Name: Threshold
2.Size mm: Solid 2000x52x15 Strandwoven 1850x92x14
3.Lacquer Finished:Matte/Stain
4.Certification: ISO9001:2000,CE
5.Feature: recyclable,Waterproof,Eco Friendly "Green" Building product
6.Colors: Can be customized
7.Use Area:can be a decorative molding that is nailed to the walls on top of the flooring or it can be used with quarter round.
- Q: My room is next to the factory, so there is always paint smell, is there any way to remove these flavors
- My room is next to the factory, so there is always paint smell, is there any way to remove these flavors...
- Q: Computer next to a lot of cockroaches, cleaned up several times, has been there ah, how do?
- Medication, and your room is too wet;
- Q: Housing decoration before the real estate business done closed water test, all OK, and later their own decoration worried about water leakage, and made a waterproof, still do a closed water test, or good. Stay for half a year, the shower, the washing machine are normal use, did not find the water leakage, the day before yesterday to tell the floor there is a drop of water drip pasture heap stalemate lack of painting phenomenon, how is this going on? In the end how to check where the leakage? How to solve? More
- 1. Bathroom leakage causes and maintenance methods: 1) bathroom leakage reasons: There are two reasons for the leakage of the bathroom, the first is the ground water seepage, the second is the upper and lower water pipes damaged water seepage. 2) how to determine the reasons for water leakage: ◆ to determine the ground water seepage method: as long as the ground water, there is leakage of water downstairs, the ground does not use water, downstairs do not ask for a small pile ; ◆ to determine the water pipe leakage method: the general water pipe leakage water, and there is continuity; to the floor drain, hand basin, sitting to pour water can determine the water pipe is no problem, if the bathroom for several days without water , But there is leakage of water, and the leakage of water is not reduced, that is, on the water pipe problem. 3) the ground floor leakage water maintenance methods (Note: as long as the water pipe is not bad, you can ensure that this method to solve the problem of ground water seepage): 1, the surface of the dust, oil, water and other treatment clean and keep the surface dry; 3, in the tile surface, tile joints, wall joints, root and other cement parts, spray through the type of waterproofing agent, must be sprayed evenly, if the tiles are filled with a sealant, need to draw a small groove with a knife; ; 4, to be waterproof after 9 dry (about 2 hours later), with the filling paste filled with all tile joints and damaged and defective parts, around the root and other weak links with caulking paste brushing reinforcement; 5, ground and Wall joints and pipe roots around the use of plastic mud to do waterproof side; 6, waterproof construction after 24 hours within the construction site can not be water. 100 million waterproof not only to provide you with a good product, but also free online for your advisory services.
- Q: RT, my house is the kind of flooring on the floor of the tile, and the family did not use the carpet, I would like to ask, this is suitable for a vacuum cleaner? The The Bought the words, can not clean the home? The The Because I listen to friends like floor tiles do not use blankets do not fit with a vacuum cleaner look! The Power penalty duo nuclear Xin Ge geese too brave to ask this master to answer the next! The The Thank you! More
- First of all, of course, can be used slightly. Vacuum cleaner is not necessarily clean, garbage is too big, vacuum cleaner sucked in. The vacuum cleaner is mainly a vacuum cleaner. If the family is more garbage, it is recommended to buy a relatively large suction, and my home is the home of the home with a vacuum cleaner quiet, the noise is relatively small, suction, anyway, my family is enough, like what cigarette butts, melon shells, peanuts Shell and the like, such as the power of the dolphin rosewood coffee is too easy to suck up. I like the benefits of this product is mainly the noise is particularly small. highly recommended
- Q: How can this game automatically give priority to attack from their nearest enemy hero rather than all enemy units? I know that the attack on the floor and shift + a can attack their nearest enemy units, but there is no key or key combination of methods such as can be very simple attack to their nearest Enemy heroes Do not tell me the direct A opposite hero or right the other heroes. The Perhaps not this method, just think that if there is such a function on the overbearing. The Question added: Well, it seems that I think more. More
- Attack the words are not clear, but the skills can be, you can set the key to automatically set the magic, you can automatically attack the hero
- Q: Booked the elephant floor pre-paid part of the deposit, came back after the discovery of the contract in addition to the floor and the baseboard is the agreed price, but also includes "flat mouth (seems to be so clear to write)" 15 yuan, "size" 20 yuan, right angle "60 yuan, the edge of 6 yuan / m, brother two good 15 yuan, 15 yuan glass glue, tape 10 yuan, nail 5 yuan, plastic cloth 1 Fen touch bark Pei Du think Sen 3 yuan / Square meters (also see clearly, as if so much.) Check the Internet under the said floor of the floor to install, transport, glue and mat is free, then my list is not a problem?
- Icon is like this, the so-called shop big bully ah. You mark these things are special construction materials, most of the normal construction is not used. Flat mouth: should be the door pressure, this must be, a doorway; glass glue: sticky mouth with the mouth, to the barking barking Du Dusu Sen when they buy it. Other, to see the scene, it should be the case, the proposed call to ask the dealer.
- Q: What is the structure of the bumper car?
- Dahong bear bumper car series: A plastic shell B frame assembly ----- frame ------ wheel ------ other C control circuit ----------- Controller ------------ drive motor ------------ battery ------------ control line ------- --- other D supporting accessories --------------- charger -------------- other accessories 2, from the sub-sub-mechanical structure: Including the plush jacket, plastic accessories, metal frame, wheel bearings and other electronic circuit control: control circuit, control system, power supply battery, drive motor and other frame structure of the steering mechanism (pictured)
- Q: Will the desktop computer ground wire be connected to the floor? Or can the wall take power? , The computer near the two different.
- Check the socket at home, with no grounding wire inside
- Q: What are the PVC trough models?
- Model High width PXC-PXC-PXC-P valve Dingxiao shares Yijia wrong tied nitrogen stem XC-PXC-PXC -... 40PXC-PXC-PXC-PXC-PXC-
- Q: Home on the floor found a lot of black than the needle slightly small insects, more likely to appear in the vicinity of the window, what is the insects, how to eliminate
- Your home may have something to eat. With the "radar" insecticide aerosol can kill.
1. Manufacturer Overview
Location | Changzhou |
Year Established | 2010 |
Annual Output Value | USD 2000000 |
Main Markets | America 50%, Asia 40%, Africa 10% |
Company Certifications |
2. Manufacturer Certificates
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability
a) Trade Capacity | |
Nearest Port | Shanghai |
Export Percentage | |
No.of Employees in Trade Department | 3 |
Language Spoken: | English |
b) Factory Information | |
Factory Size: | 20000m2 |
No. of Production Lines | 2 |
Contract Manufacturing | |
Product Price Range | USD2-USD5 |
Send your message to us
Threshold
- Loading Port:
- Shanghai Port
- Payment Terms:
- TT or L/C
- Min Order Qty:
- 500 m²
- Supply Capability:
- 100000 m²/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords