Steel Tube And Pipe Thread Rolling Machine
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 set
- Supply Capability:
- 100 set/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
I Description of the tube and pipe thread rolling machine
This machine is for rolling full thread on rods.
This machine is hydraulic driven, stable rolling quality.
The machine is comprised of high-strength steel structure, three-axis-linkage gearbox, universal coupling, main driving motor, control system and hydraulic system.
II Main technical data of the tube and pipe thread rolling machine
Item | Data |
Machine code | JSG-50 |
Diameter of spindle | 35mm |
Max. hydraulic pressure | 8MPa |
Suitable max. steel bar/tube diameter | 50mm |
Suitable min. steel bar/tube diameter | 20mm |
Suitable steel tube wall thickness | Min. 2mm |
Suitable thread pitch | 0.5-4mm |
Accuracy of threading | ±0.10mm |
Total power | 5.2kW |
Machine dimension | 1700mm x 2000mm x 1400mm |
Weight of machine | 850kg |
- Q: I'm a vegetarian who doesn't eat fish and I was just wondering what this means.
- If it's processed on the same machinery as, lets say nuts, the knife,grinder, or whatever the machine is was used on your food and nuts. They normally put this for allergy precaution
- Q: A ers' wagesB.machineryC.trainingD.marketing
- B. machinery
- Q: Royal Co. acquired new machinery with a list price of $700,000. At the date of Purchase they received a $7,000 cash discount and paid $2,000 of delivery charges. Installation and worker training costs were $46,000 and $14,000 respectively. During installation, worker negligence caused $15,000 damage to other machinery in the factory building. What is the acquisition cost for the machinery?I am unsure what to include, deduct or add in the calculation. Any help would be great!
- Acquisition Cost Accounting
- Q: Payback: Quebec, Inc., is purchasing machinery at a cost of $3,768,966. The company expects, as a result, cash flows of $979,225, $1,158,886, and $1,881,497 over the next three years. What is the payback period?
- Plugging okorder /
- Q: Such as in terms of construction equipment like a crane, what is the maximum amount of weight that can be lifted by any existing machine?
- A crane's limitation is defined as metre-tonnes, because it is the moment that creates the limitation of the crane lift. A crane does the same amount of work to lift 50 tonnes at 10 metres as it does to lift 100 tonnes at 5 metres. That being said; I believe the largest single lift was perfromed by one of forty-two Lampson Tranis Lift IIs in Corpus Christi TX. The actual load was 1000 tonnes. And this just happens to be a MOBILE unit, on top of everything else!
- Q: i've been working out on my arms for 6 months now but can't seem to get any results on the sides of my upper arms.i'm not really skinny,i'm avarage body build but i have skinny arms.i can grow muscle on front and back of my arms,but not on the sides.what are some good exercises,exercise machinery or techniques i can use to target these areas?(and sorry i don't know the technical names for these muscles in the arm)
- mattress of nails by utilising alice cooper sledgehammer by utilising peter gabriel huge undesirable John by utilising jimmy dean, confident, the sausage guy. LOL The God that failed by utilising metallica cock the hammer by utilising cyprus hill
- Q: I am making a hypothetical business for school and have decided to create a business that makes whey protein powder from the whey left over from the making cheese. I have searched all over the net but I cant find any information on the machinery used in this process. Can anyone help
- nope
- Q: why are larger fields needed for machinery such as combine harvesters,tractors and ploughs?
- It's the other way around. Those machines are needed for larger fields. The number of people needed to harvest a corn field that's several thousand acres would be huge and prove to be too costly.
- Q: what does machinery safety engineer do?
- Basically, they inspect every machinery and make sure that it is perfectly functional and that all safety standards are met. Safety engineers are also involved in the planning and consultation in the event that a machine is required to be moved or relocated. Safety engineers plays a major role in a machinery relocation firm such as the www.hanlonandwright .uk/.
- Q: On October 1, 2007, Machinery B was acquired with a down payment of $5,740 and the remainingpayments to be made in 11 annual installments of $6,000 each beginning October 1, 2007. Theprevailing interest rate was 8%. The following data were abstracted from present-value tables(rounded).Present value of $1.00 at 8% Present value of an ordinary annuity of $1.00 at 8%10 years .463 10 years 6.71011 years .429 11 years 7.13915 years .315 15 years 8.559
- $6,000 X 11 + $5,740
Send your message to us
Steel Tube And Pipe Thread Rolling Machine
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 set
- Supply Capability:
- 100 set/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords