• Steel Ringlock Scaffolding in China Markets System 1
  • Steel Ringlock Scaffolding in China Markets System 2
  • Steel Ringlock Scaffolding in China Markets System 3
Steel Ringlock Scaffolding in China Markets

Steel Ringlock Scaffolding in China Markets

Ref Price:
get latest price
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
100 m²
Supply Capability:
100000 m²/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

1.   Structure of Ring-lock Scaffolding

Ring-lock Scaffolding consists of cup-lock connector, post, cross bar, diagonal brace, base and top brace. Safe and convenient to operation, fast to assemble and dismantle, widely used in scaffolding construction, such as formwork scaffold and fitment construction.

 

It can be widely used for industrial and civil construction and maintenance, such as workshop, large gymnasium, conference& exhibition center conversation, billboard, market, dock, tunnel, subways, etc. used for mobile working platform installation of electrical & mechanical engineering, ship repair and other decoration engineering, for building temporary stand ,with simple roof frame, frame-connected Scaffolding can from temporary dormitory, depot and work shed.

 

2.   Main Features of Ring-lock Scaffolding

.Each Ring-lock is welded on post every 0.6m. Choose step pitch based on mechanical requirements

.When installing the scaffolding, insert ledger connector into the pole of the cup-lock, then hammer ledger connector to finish fastening

.The more load, the more reliable fasten

.Ring-lock Scaffolding has no special retaining member and no active parts. It’s easy and convenient to operation with integral low costs

 

3.   Ring-lock Scaffolding Images

Steel Ringlock Scaffolding in China Markets

 

4.   Ring-lock Scaffolding Specification

    .Buckling resistance: 2KN.M when concentrate load on cantilever and 6-9KN.m when evenly distributed load

     Design load of cross bar

     Design Lord of base:Pmax=60KN

 

5.   FAQ of Ring-lock Scaffolding

     1) What can we do for you? 

 We can ensure the quality of the vinyl banner and avoid extra expenses for customers.    

    .We can provide you the professional design team.    

    .We can provide fashionable and newest styles for you.    

    .We can design the artwork for you.    

    . Please feel free to customize.  

 

   2) What promises can be done by us?

   . If interested in Ring-lock Scaffolding, please feel free to write us for any QUOTE.

   . If printing required, please advise asap because the whole set need much more time to complete.

   . Please DO check goods when courier knocks your door and contact us asap if any issue.

 

  3) What about of our after-sale service?

   . Response will be carried out in 24hours  after receiving any complain or request.

   . Frame-Connected Scaffolding cost can be refund after order is confirmed. 

   . If the products are not based on the requirements, there will be the relevant compensations made for you.  

 

  4) What about the package and shipping time?

   .Packing:  As Customer's Requirements

   .Shipping: We have various shipping ways for our customers, such as express which including TNT,  DHL,  FEDEX, UPS, EMS, etc. ; by air/ sea, and we are VIP of these express.  

  .Shipping time:

    Normally small orders, it just 10-15 business days to arrive your hand; When comes to the customs declaration, it may need 7 days. 

    Other mass qty of Ring-lock Scaffolding, we send them out by sea or by air to sea port or air port to save some shipping freight for our customers. By ocean, it may need 45~60days, by air, it may need 25~40days.  

 

Q: Changsha Sanlian Building Machinery Fittings Factory
In addition, you can check the input path, or the name of the unit on the map. It will remind you that there is no unit in Changsha and no way. In addition, we received a fax, saying that you want to order what goods, may wish to go to the other party's local industrial and commercial Red Shield network to check whether there is this unit
Q: Building materials, equipment, components and fittings products must have "three certificates" is what cards?
Product qualification certificate means the qualified certificate, qualified label or qualified seal issued by the manufacturer to indicate the quality of the products manufactured by the factory and qualified on the package of the product or product. This is the producer's guarantee of the quality of its products, and also the obligation of a product to be stipulated by the law.
Q: How are the machine parts stacked?
Classification ah! Put small pieces of different sizes and functions into boxes and attach labels; larger items can be placed outside in a certain order (for example, function, length, value, etc.)
Q: What kind of electrical equipment do you have? What are the main components of each device?
The utility model relates to a distribution box, belonging to a primary equipment in an electric equipment. Electrical equipment includes primary equipment and two equipment. Primary equipment is mainly power generation, power transmission, transmission, distribution, electricity and other direct generation, transmission and consumption of electrical energy equipment, such as generators, transformers, overhead lines, power distribution cabinets, switches, cabinets and so on. The two equipment is the equipment that controls, protects, measures and so on. Building or general buildings, such as cables, power distribution cabinets, motors, switches, sockets, lamps, air conditioners, electric water heaters, electricity meters, cameras, telephones, computers, etc., are electrical equipment.
Q: What are the safety protection equipment, machinery and equipment, construction machinery and accessories for construction enterprises?
As well as scaffolding, protective fence, all belong to the safety protection facilities, does not belong to the safety protection appliances. Safety protection tools are many, it is characteristic of the operator to carry, I will not list
Q: Where are the mechanical pressurization air supply facilities set up?
The purpose of setting up a mechanical pressurization air supply smoke prevention system is to provide evacuation routes and shelters without smoke interference in the event of a fire in the building. Therefore, in the closed door, pressing position, and the fire floor must maintain a certain pressure difference, the position of the air pressure value is a relative positive pressure); at the same time, in the open part of the pressure when the door can have enough air velocity in the opening section, to effectively prevent the intrusion of flue gas, the safety of personnel ensure evacuation and refuge.
Q: How are buildings, installations and materials divided?
Provisions on the division of equipment and materials for engineering construction? [answer] the division of equipment and materials in engineering construction is directly related to the reasonable division of investment structure, budget preparation and calculation of construction output value. In order to reasonably determine the project cost, strengthen the investment in the process of construction and management, the equipment and materials in the engineering construction is unclear, especially the universal controversial common problems and put forward the principle of division of fifteen copies of "national unified installation project budget quota" of the equipment and materials are divided, the provinces, autonomous regions and municipalities directly under the central government and the relevant departments of the State Council, the Department should be combined with the local situation, formulate rules for its implementation, and report to the Ministry of construction for the record.
Q: Mechanical bearings, all types? Roughly
Spherical roller bearings have two raceways in the inner and outer ring raceways between spherical assembly, a drum shaped roller bearings. The center of curvature of the raceway of the outer race is consistent with the center of the bearing, so it has the same self-aligning function as the self-aligning ball bearing. When the axle and shell are bent, the axial load in two directions can be automatically adjusted. Radial load capacity, suitable for heavy load and impact load. Inner diameter is tapered bore bearings can be installed directly. Or the use of tight sets, the demolition cylinder installed on the cylindrical shaft. The cage uses a steel plate holder, a polyamide forming cage and a copper alloy car holder.
Q: Where are the hanging baskets for the building?
It is forbidden to take a stool or put a ladder on a hanging basket to work higher; it is not allowed to work alone in a basket, and no electric machinery or equipment can be placed in the basket;
Q: What are the sub projects of a construction project?
Appendix B Construction Engineering Division (sub branch) engineering, sub project division, B.0.1 Construction Engineering Division (sub branch), engineering, sub projects can be divided into table B.0.1. Table B.0.1 division number of construction works, sub works and sub projects

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords