Prefabricated House with CE Certificate of Plastic Costco
- Loading Port:
- Tianjin
- Payment Terms:
- TT or LC
- Min Order Qty:
- 50 m²
- Supply Capability:
- 50000 m²/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Prefabricated House with CE Certificate of Plastic Costco
Specifications
1.Residential Buildings
2.Prefab House
3.Low-Rise Buildings
4.Light Steel Structure Buildings
Energy Saving | 65% -90% energy reduction. |
Water Saving | The dry construction consumes 10% of water used in traditional construction. |
Material Saving | 90% of used materials are recycled. |
Land Saving | The inside usable area increases 10%. |
Environment Protection | Pollution–free construction system. |
The villa with Mediterranean style omits the heavy and complicated sculptures and decorations. It makes people feel that they would recover their original simplicity, and feel that the building is so distinctive, through the simple architectural lines and the perfectly round trimming. The design with the asymmetry features is full of romantic passion in the sunshine.
Housing and Building All the components of the Housing and Building are prefabricated in the manner of factory standardized production, and then assembled on-site, by which the construction mode of component prefabrication and on-site assembly can be realized. Characterized by no wet operation, short construction period, reduction of noise, dust and waste, small impact by climate conditions, easy disassembly and recycling, it is consistent with the requirements on energy conservation and environmental protection of green buildings.
Features:
Light Steel Frame System
This system is suitable for 1-3 storeys building
Formed by the dense light steel studs and compound envelop, and supported by professional software CAD and CAM, and by intelligent equipment, this system is with superior physical qualities.
Application:
Residential Buildings
prefab House
Low-Rise Buildings
Light Steel Structure Buildings
Benefit:
1. Thermal Insulation
The advanced exterior overall thermal insulation meets the updated state energy-saving standards for buildings. It refrains from the cold and thermal bridges phenomenon, and keeps buildings away from damages such as dampness, distortion, mildew and corrosion.
The unique heat reflection and ventilation layer design can make better insulation effects. Temperature can be reduced by five to eight degrees.
2. Seismic and Wind Resistance
Withstand the shock of 9 on the Richter scale.
The dense light gauge steel and column are connected in flexible method with screws and bolts, which can absorb the energy of earthquake. There are fittings between foundation and wall, which are resistant to pull out and shear. The total weight of the house is light, which is only 1/6 of traditional concrete houses. Therefore it has better anti-seismic performance.
Can endure typhoon of 12 levels
There are special fittings among roof, floor, wall and basement. The strong connection can help resist typhoon of 12 levels.
3. Roof Load-bearing and Fireproof
The roof can withstand 1500mm thickness snow.
The structure can be designed according to climate requirements.
Low-rise building fire resistance meet 2.5h (Grade Ⅱ) design standard.
High-rise building fire resistance meet 3h (Grade Ⅰ) design standard.
Wall and floor slab use special technology which can meet 3h refractory limit.
4. Sound Insulation
Improved technology on sound insulation and shock absorption meet the state building standards for sound insulation. Special methods are performed, especially towards the audio frequency ranging from 250 to 1000 Hz which is the most sensitive to ears, in order to create a quiet and comfortable living environment.
5. Moisture-proof and Ventilation
There is a gap between wall and roof truss, so the air can flow inside.
There is a one-way ventilation layer in the composite wall, which is able to make the wall ‘breathing’. This means moisture can be reduced inside of the door.
6. Durable
90 years structure safety guarantee
Special coating technology enables the structural materials to have the self-restoration function to prevent rust and corrosion.
Envelope materials using new lightweight building materials to achieve fire resistant,anti-corrosion and anti-moth.
7. Energy Efficient and Environmental Protection
FAQ:
1.How about the installation? For example, the time and cost?
To install 200sqm house needs only 45 days by 6 professional workers. The salary of enginner is USD150/day, and for workers, it's 100/day.
2.How long is the life span of the house?
Around 50 years
3. And what about the loading quantity?
One 40'container can load 140sqm of house.
Images
Manufactured homes are typically purchased from a retail sales company, initially assembled by a local contracting company, and follow-up repairs performed by the manufactured home company under warranty.
- Q: What is the difference between a house and a villa?
- a row of two to four layers together, each several units share the external walls, a unified graphic design and independent portal
- Q: Buy second-hand villa need to pay attention to what?
- but not the same landscape you dig the "silver" are also different.
- Q: What is the height of the general villa?
- single layer of about 4.0m high, this is not necessarily, according to the design of the situation
- Q: Why is someone called him called "Do not wild?
- do not wild, refers to the mountains and rivers of large large manor-level villa, different from the city enclosed small villa in the district
- Q: What is the thickness of the villa's floor and the maximum load it can bear?
- Said the floor of the bearing capacity of the problem, because the national standard provides the carrying capacity
- Q: What is a stacked villa?
- Give a simple example, just like building blocks, layer by layer of the stack, each layer for a unit.
- Q: What is the villa district management model
- ???Villa community management framework to fully reflect the company's service concept
- Q: What is the number of years of row of villas?
- you can view your land certificate, the above will be explained.
- Q: What is the general civil villa beam specifications?
- beam above the load is 24 walls, then the beam is generally 24 × 40cm can
- Q: What are the characteristics and requirements of villa property management?
- Property services, people-oriented, people service. Villa property compared to the general residential properties
Send your message to us
Prefabricated House with CE Certificate of Plastic Costco
- Loading Port:
- Tianjin
- Payment Terms:
- TT or LC
- Min Order Qty:
- 50 m²
- Supply Capability:
- 50000 m²/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords