PREFAB HOUSE LOW COST AND NICE DESIGN 011
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 10000 m²
- Supply Capability:
- 1000000 m²/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
1. DESIGN DRAWINGS
The design drawing is the first step we should consider. If you have your own design, we will recheck it and start production based on it.
If you don’t have design plan, we can achieve it for you. CNBM is one group, we can provide you not only production and material, but design and drawings. The designing charges will be confirmed according to your project details.
2. What we need to do the design?
(1). Project Information, usage, construction area, height, how many storeys
(2). Weather report and geological for the location district
3. Production process:
(1). Confirm design plan.
(2). Building the mould to confirm the design is correct.
(3). Mass production, packing and transportation.
(4). Installation
(5). After sale service.
4. Packing choice:
(1). We can choose the steel structure to pack the products, its cost is a little higher, but the result is perfect, easy to transfer and load. This packing is designed for accurate production
(2).Bulk packing. This packing is designed for heavy steel structure, such as beam, pillar, its advantage is cost less and easy to operate.
5. Shipment choice
(1). Container transportation. We can load the steel structure in the container directly. This choice is available for small project, the total weight of steel is less than 3000 tons.
(2). Bulk cargo ship
If the total weight of steel structure is more than 3000 tons, we can choose bulk cargo shipment. This choice is cost less and save time.
6. Installation choice:
(1). We send our engineer to guide the overseas installation . This is available for the small project. We will send 3 to 4 engineer to guide the local workers to achieve the installation. Its advantage is saving installation charges for customer.
(2). We send our engineers and construction workers together to operate installation. This is better choice for big project. Cost is a little higher, especially for the air tickets, accommodation. However, it will save the time for customers.
- Q: What are the benefits of warehouse outsourcing?
- effectively reduce the warehouse waste rate, the general warehouse outsourcing, leasing area than their management of the warehouse to reduce 1/3 or so.
- Q: What do the warehouse keeper have to do and what should I pay attention to?
- Second, keep abreast of the inventory status, to ensure timely supply of materials and equipment, give full play to the efficiency of turnover.
- Q: What is the 5S in warehouse management?
- 5S management is finishing (SEIRI), rectification (SEITON), cleaning (SEISO), cleaning (SETKETSU), literacy (SHITSUKE) five projects
- Q: How to do warehouse management?
- the saying goes, troops and horses are not moving grass first. Do a good job of warehouse management work
- Q: What are the processes required for the company's warehouse management?
- In addition to the above three points, there is the inventory, according to the company's request, usually in a billing cycle of the starting point, the inventory will generally be on the warehouse in the stagnant goods or defective products to do The
- Q: How to reduce warehouse costs?
- Warehouse as a corporate material storage and turnover of the place, but also the equivalent of corporate funds precipitation area and the transfer area.
- Q: What is the meaning of goods warehousing?
- Warehousing logistics, is the use of self-built or leased warehouse, site, storage, storage, handling handling, distribution of goods
- Q: What is the daily work of the warehouse?
- Warehouse custodians must be reasonable to set all kinds of materials and products of the books and accounting books
- Q: Recruitment of warehouse staff and warehouse manager of the quality requirements?
- communication skills and ability to accept hardships. Obey the management, work active
- Q: How to do a good job Warehouse Invoicing?
- The traditional manual record of goods Invoicing has been unable to meet the enterprise's warehouse management
Send your message to us
PREFAB HOUSE LOW COST AND NICE DESIGN 011
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 10000 m²
- Supply Capability:
- 1000000 m²/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches