PREFAB HOUSE LOW COST AND NICE DESIGN 006
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1000 m²
- Supply Capability:
- 1000000 m²/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
1. DESIGN DRAWINGS
The design drawing is the first step we should consider. If you have your own design, we will recheck it and start production based on it.
If you don’t have design plan, we can achieve it for you. CNBM is one group, we can provide you not only production and material, but design and drawings. The designing charges will be confirmed according to your project details.
2. What we need to do the design?
(1). Project Information, usage, construction area, height, how many storeys
(2). Weather report and geological for the location district
3. Production process:
(1). Confirm design plan.
(2). Building the mould to confirm the design is correct.
(3). Mass production, packing and transportation.
(4). Installation
(5). After sale service.
4. Packing choice:
(1). We can choose the steel structure to pack the products, its cost is a little higher, but the result is perfect, easy to transfer and load. This packing is designed for accurate production
(2).Bulk packing. This packing is designed for heavy steel structure, such as beam, pillar, its advantage is cost less and easy to operate.
5. Shipment choice
(1). Container transportation. We can load the steel structure in the container directly. This choice is available for small project, the total weight of steel is less than 3000 tons.
(2). Bulk cargo ship
If the total weight of steel structure is more than 3000 tons, we can choose bulk cargo shipment. This choice is cost less and save time.
6. Installation choice:
(1). We send our engineer to guide the overseas installation . This is available for the small project. We will send 3 to 4 engineer to guide the local workers to achieve the installation. Its advantage is saving installation charges for customer.
(2). We send our engineers and construction workers together to operate installation. This is better choice for big project. Cost is a little higher, especially for the air tickets, accommodation. However, it will save the time for customers.
- Q:What is the daily work of the warehouse?
- Raw materials warehouse must be based on the actual situation and the nature of various types of raw materials
- Q:What are the benefits of warehouse outsourcing?
- effectively reduce the warehouse waste rate, the general warehouse outsourcing, leasing area than their management of the warehouse to reduce 1/3 or so.
- Q:What is the 5S in warehouse management?
- 5S management is finishing (SEIRI), rectification (SEITON), cleaning (SEISO), cleaning (SETKETSU), literacy (SHITSUKE) five projects
- Q:What are the processes required for the company's warehouse management?
- Warehousing management, storage management to fill out the storage list, as well as multi-storage product testing to ensure that the quality of storage products and quantity, at the same time in the report to do the appropriate operation.
- Q:How to do a good job Warehouse Invoicing?
- The traditional manual record of goods Invoicing has been unable to meet the enterprise's warehouse management
- Q:How to do warehouse management?
- In order to make the work of the unit in an orderly manner, the warehouse work is very important
- Q:How to reduce warehouse costs?
- Warehouse as a corporate material storage and turnover of the place, but also the equivalent of corporate funds precipitation area and the transfer area.
- Q:Recruitment of warehouse staff and warehouse manager of the quality requirements?
- Familiar with the warehouse operation process, computer operating skills, engineering warehouse experience is preferred
- Q:What is the meaning of goods warehousing?
- Modern "warehousing" is not the traditional sense of the "warehouse", "warehouse management"
- Q:What do the warehouse keeper have to do and what should I pay attention to?
- First, according to the provisions of materials and equipment out of the library acceptance, accounting and payment work, so that accounts match.
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
PREFAB HOUSE LOW COST AND NICE DESIGN 006
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1000 m²
- Supply Capability:
- 1000000 m²/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches