PREFAB HOUSE LOW COST AND NICE DESIGN 005
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1600 m²
- Supply Capability:
- 1000000 m²/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
1. DESIGN DRAWINGS
The design drawing is the first step we should consider. If you have your own design, we will recheck it and start production based on it.
If you don’t have design plan, we can achieve it for you. CNBM is one group, we can provide you not only production and material, but design and drawings. The designing charges will be confirmed according to your project details.
2. What we need to do the design?
(1). Project Information, usage, construction area, height, how many storeys
(2). Weather report and geological for the location district
3. Production process:
(1). Confirm design plan.
(2). Building the mould to confirm the design is correct.
(3). Mass production, packing and transportation.
(4). Installation
(5). After sale service.
4. Packing choice:
(1). We can choose the steel structure to pack the products, its cost is a little higher, but the result is perfect, easy to transfer and load. This packing is designed for accurate production
(2).Bulk packing. This packing is designed for heavy steel structure, such as beam, pillar, its advantage is cost less and easy to operate.
5. Shipment choice
(1). Container transportation. We can load the steel structure in the container directly. This choice is available for small project, the total weight of steel is less than 3000 tons.
(2). Bulk cargo ship
If the total weight of steel structure is more than 3000 tons, we can choose bulk cargo shipment. This choice is cost less and save time.
6. Installation choice:
(1). We send our engineer to guide the overseas installation . This is available for the small project. We will send 3 to 4 engineer to guide the local workers to achieve the installation. Its advantage is saving installation charges for customer.
(2). We send our engineers and construction workers together to operate installation. This is better choice for big project. Cost is a little higher, especially for the air tickets, accommodation. However, it will save the time for customers.
- Q: What are the benefits of warehouse outsourcing?
- the most important point, the modern community widely recognized professional things to a more professional team to operate
- Q: What do the warehouse keeper have to do and what should I pay attention to?
- Second, keep abreast of the inventory status, to ensure timely supply of materials and equipment, give full play to the efficiency of turnover.
- Q: What is the third-party warehouse function and responsibility?
- can effectively use equipment and space, while third-party warehouse management is professional
- Q: What is the 5S in warehouse management?
- 5S management is finishing (SEIRI), rectification (SEITON), cleaning (SEISO), cleaning (SETKETSU), literacy (SHITSUKE) five projects
- Q: How to do warehouse management?
- but the work of the smooth development of gas stations, reservoirs, spare tire, the normal operation of a unit can not be underestimated the decisive role.
- Q: What are the processes required for the company's warehouse management?
- Warehousing management, storage management to fill out the storage list, as well as multi-storage product testing to ensure that the quality of storage products and quantity, at the same time in the report to do the appropriate operation.
- Q: How can I manage the warehouse better?
- Warehouse is an important part of the enterprise material supply system, is the enterprise material turnover reserve link
- Q: How to reduce warehouse costs?
- Warehouse for the reduction of business costs, has a very important role
- Q: What is the relationship between logistics and warehousing?
- This shows that warehousing is only one of the logistics activities, logistics and other activities
- Q: How to do a good job Warehouse Invoicing?
- Improve the warehouse management system to do a good job of warehouse management is very important to implement the warehouse management regulations for the basis of warehouse management work is very important.
Send your message to us
PREFAB HOUSE LOW COST AND NICE DESIGN 005
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1600 m²
- Supply Capability:
- 1000000 m²/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches