• PREFAB HOUSE LOW COST AND NICE DESIGN  0006 System 1
  • PREFAB HOUSE LOW COST AND NICE DESIGN  0006 System 2
  • PREFAB HOUSE LOW COST AND NICE DESIGN  0006 System 3
  • PREFAB HOUSE LOW COST AND NICE DESIGN  0006 System 4
  • PREFAB HOUSE LOW COST AND NICE DESIGN  0006 System 5
PREFAB HOUSE LOW COST AND NICE DESIGN  0006

PREFAB HOUSE LOW COST AND NICE DESIGN 0006

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
2000 m²
Supply Capability:
1000000 m²/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

 

 1.     DESIGN DRAWINGS

 

The design drawing is the first step we should consider. If you have your own design, we will recheck it and start production based on it.

 

If you don’t have design plan, we can achieve it   for you. CNBM is one group, we can provide you not only production and material, but design and drawings. The designing charges will be confirmed according to your project details.

 

2.     What we need to do the design?

1.     Project Information, usage, construction area, height, how many storeys

2.      Weather report and geological for the location district

3.     Production process:

1.     Confirm design plan.

2.      Building the mould to confirm the design is correct.

3.     Mass production, packing and transportation.

4.     Installation

5.      After sale service.

 

4. Packing choice:

 

1. We can choose the steel structure to pack the products, its cost is a little higher, but the result is perfect, easy to transfer and load. This packing is designed for accurate production

 2.Bulk packing. This packing is designed for  heavy steel structure, such as beam, pillar, its advantage is cost less and easy to operate.

5. Shipment choice

1.     Container transportation. We can load the steel structure in the container directly. This choice is available for small project, the total weight of steel  is less than 3000 tons.

 

2. Bulk cargo ship

If the total weight of steel structure is more than 3000 tons, we can choose  bulk cargo shipment. This choice is cost less and save time.

6.     Installation choice:

 

 1.     We send our engineer to guide the  overseas installation . This is available for the small project. We will send 3 to 4 engineer to guide the local workers to achieve the installation. Its advantage is saving installation charges for customer.

2.     We send our engineers and construction workers together to operate installation. This is better choice for big project. Cost is a little higher, especially for the air tickets, accommodation. However, it will save the time for customers.

 

 

 

 

 

Q: What are the benefits of warehouse outsourcing?
Warehouse outsourcing does not require the enterprise itself to be in the allocation of warehouse personnel, operating equipment, etc. must be put into the hardware facilities.
Q: What do the warehouse keeper have to do and what should I pay attention to?
First, according to the provisions of materials and equipment out of the library acceptance, accounting and payment work, so that accounts match.
Q: What is the third-party warehouse function and responsibility?
Third-party warehouse that is the contract warehouse, refers to the logistics and other logistics activities will be subcontracted to the external company
Q: What is the 5S in warehouse management?
5S management is finishing (SEIRI), rectification (SEITON), cleaning (SEISO), cleaning (SETKETSU), literacy (SHITSUKE) five projects
Q: What are the processes required for the company's warehouse management?
In addition to the above three points, there is the inventory, according to the company's request, usually in a billing cycle of the starting point, the inventory will generally be on the warehouse in the stagnant goods or defective products to do The
Q: How can I manage the warehouse better?
Warehouse is an important part of the enterprise material supply system, is the enterprise material turnover reserve link
Q: How to reduce warehouse costs?
Warehouse as a corporate material storage and turnover of the place, but also the equivalent of corporate funds precipitation area and the transfer area.
Q: What is the relationship between logistics and warehousing?
This shows that warehousing is only one of the logistics activities, logistics and other activities
Q: What is the meaning of goods warehousing?
Modern "warehousing" is not the traditional sense of the "warehouse", "warehouse management"
Q: What is the daily work of the warehouse?
Raw materials warehouse must be based on the actual situation and the nature of various types of raw materials

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches