PPR Equal Tee with high quality OEM design
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1000 1000PCS
- Supply Capability:
- 100000 1000PCS/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Specification
Product Description
Item | Pipe Fittings |
Model | B07 - Pipe Fittings |
Material | PVC-U, PPR,CPVC |
Size | 1/2"~4" 20-110mm |
Color | White and gray for PVC,green ,grey, white and blue for PPR |
Standard | ASTM D2466, ASTM D2665 , BS4346, NBR5648, DIN8078 / 8077 |
Machines | Injection machines |
Technics | Casting |
Property | Connector |
Working Place | PVC -15°-55°,PPR-20°-90°,CPVC -20°-100° |
Warranty | At least 50 years |
Delivery time | 30-45 days after deposite, according to customers requirement |
Product Application
Distribution for cool and hot water
Duct for drinkable water system
Pipes for kinds of high-temperature and low-temperature heating system
Pipes for heating and coolling settings in solar energy system
Connecting pipe for air conditioners
Advantages of production
Sizes of PPR fittings
Product name | Size | Weight | Pack |
gram/m | (m/pack) | ||
equal tee | T16 | 12.5 | 1300 |
T20 | 19.4 | 800 | |
T25 | 30.5 | 450 | |
T32 | 48.2 | 260 | |
T40 | 90.8 | 150 | |
T50 | 142.5 | 106 | |
T63 | 275.3 | 54 | |
T75 | 515.0 | 30 | |
T90 | 712.0 | 18 | |
T110 | 1082.0 | 12 | |
T125 | 1544.0 | 8 | |
T160 | 2531.0 | 4 |
Workshop and Test Equipment
Packaging & Shipping
FAQ
1.What is your MOQ?
MOQ depends on different items.
2.What is your delievery time?
The time of delievery is around 30-45days.
3.What is the shipping port?
We ship the goods via Ningbo or Shanghai port.
Please feel free to leave us message if you have any question about us and our products.
- Q: The predominant rumor is that he got fired because of pressure from the publisher of the game Kane Lynch who had spent thousands of dollars on advertising on the site. Do you beleive the rumors or do you have another opinion?
- Honestly, I think women tearing each other apart to fight over a stupid man who is using you both is really pathetic.
- Q: So I've decided that all I want for New Year's is a new smoke detector. I would like one that goes off with reassuring regularity. As in, when I badly burn the toast, or set something on fire in the oven, or when I hold a smokey candle under itSo any advice on good smoke detectors? I want a good quality one, but not one that's so expensive I can't afford it. Also, I'd prefer one that doesn't go off every time I open the door after a hot shower.
- No, Just common sense, who would want to rebuild a church today? The cost is unbelievable. You are supposed to be good stewards of His money! Slinky, I could roll them back and forth all night, they take away stress. Try it sometime. Works for me, cheaply too!
- Q: You and the love of your life have a choice to make, which would it be and why?
- For the first two questions, the velocity of flow (2gh)^0.5. Flow velocity of flow * area of pipe (3.14*0.5^2/4). You have to subtract the head loss for the two bends and length of pipe. This is typically a loss coefficient * the velocity head, h v^2/2g. All lenth units in feet. To find the time, you need to integrate the flow vs. time equation.
- Q: I am trying to install a new smoke alarm inside a room of my house, but when I attach it to the wires in the ceiling it sets off all of the other smoke alarms in my house until I detach it. Is this supposed to happen (in which case is there a way that I can silence them all at once or do I have to silence each one individually), or what can I do so that this doesn't happen?
- The difference between sch 80 and sch 20 is thickness. On the pipe the outside diameter is the same the wall thickness is what changes same on fittings. So yes they will work the fittings will just be thinner walled tha the pipe. This link will give you pipe dimensions. Good Luck
- Q: What was the practicle application of the discovery of electricity by Benjamin Franklin after the kite experiment?
- You are absolutely wrong. Paul Heyman is behind the shield. He had the 3 of them beat up Brad Maddox. Wake up and smell the coffee.
- Q: It's easy to leak if you change the coil several times at the joint. Can I stop it with glue? Solution, please,,
- Should replace the high-pressure pipe or tube sealing ring in order to solve the problem.
- Q: Can the pressure vessel pipe joint adopt G thread? Why?
- Can not. G threads are not sealed enough.The following three threads can be used.1.55 degrees taper external thread R and cylindrical external thread Rp matching2.55 degrees taper external thread R and taper external thread Rc fit3.60 degrees taper internal and external thread fit PT.Glass can not be sealed only by thread.
- Q: does anyone have any ideas for horse party for 10 year old??
- Can anyone tell me what is the material / chemical required to convert pvc into cpvc?
- Q: my friend decided the best way to get into her car was to break the lock Now I cannot find a replacement online or auto parts Chevrolet wants too much
- Why does Coppertop get 4 thumbs down? I tried her method this morning and it totally worked. Adding the fabric softener when I did and then letting my pants dry overnight and then ironing worked great!
- Q: In rural areas, digging under the water not calculated, dug up a 110 degree angle, but only 135 of the joint, how to do now, rerouting the pipeline is too long and too much trouble, and ask how the tube ends of 35 m cm
- PVC pipe (PVC-U pipe) rigid PVC pipe is made of PVC resin and stabilizer, lubricant and so on. It is extruded and formed by hot pressing method. It is the earliest plastic pipe to be developed and applied. PVC-U pipes are corrosion resistant, easy to adhere, low in price and hard in texture, but because of the exudation of PVC-U monomers and additives, they are only suitable for the feed water system with a temperature of not more than 45 DEG C. Plastic pipes are used to transport potable water, waste water, chemicals, heating and cooling fluids, foodstuffs, ultrapure liquids, slurries, gases, compressed air, and vacuum systems.
Send your message to us
PPR Equal Tee with high quality OEM design
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1000 1000PCS
- Supply Capability:
- 100000 1000PCS/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches