• PJ200 of Cantilever Formwork System for Construction Building System 1
  • PJ200 of Cantilever Formwork System for Construction Building System 2
  • PJ200 of Cantilever Formwork System for Construction Building System 3
  • PJ200 of Cantilever Formwork System for Construction Building System 4
PJ200 of Cantilever Formwork System for Construction Building

PJ200 of Cantilever Formwork System for Construction Building

Ref Price:
get latest price
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
1000 m²
Supply Capability:
1000000 m²/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

1. Structure of  Cantilever Formwork Description 

The construction is easy, rapid and economical.  A single pouring height is high and the finished concrete surface is perfect. Cantilever formwork has several types, the structure is similar, and has its own different characteristic. Can use them according to actual demand.

Main cantilever Formwork:PJ200 & PJ240,CB-240 etc.


2. Main Features of  Cantilever Formwork

-Flexible structure, be adapted of different support system

-simple structure,easy assembly

-easy, rapid and economical.

-high construction efficiency with special system tools

3.  Cantilever Formwork Images

 

4.   Cantilever Formwork Specifications

① Tensile bolt M30/L= 110

② Anchor shoe

③ Bowl-climbing cone M30/D15

④ High-strength rod D15

⑤ Ancor plate D15



5.FAQ of  Cantilever Formwork


1) What can we do for you? 

    .We can ensure the quality of the Cantilever Formwork and avoid extra expenses for customers.    

    .We can provide you the professional technical team.    

    .We can provide professional building proposal for your projects.       


2) What promises can be done by us?

   . If interested in this kind of formwork, please feel free to write us for any QUOTE.

   . If need any technical and building assistance, we could provide on-site professional staff for instruction.

   . Please DO check goods when courier knocks your door and contact us asap if any issueS.


 3) What about the package and shipping time?

    .Packing: wood package and adhesive tape

    .Shipping: by sea

     Shipping time: Normally small orders, it just1week business days to arrive your hand; When comes to the customs     declaration, it may      need 1-2 weeks.

Q:Case Study of Aluminum Alloy Formwork
Engineering aluminum alloy template design program case: 1, all using stereotypes design, factory production, template engineering quality excellent. 2, safe and civilized construction, people-oriented, scientific development. 3, because the scene almost no production process, reduce the construction noise, energy saving, power in the future.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords