Modern Chromed Table Base
- Loading Port:
- China Main Port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 100 Pieces set
- Supply Capability:
- 3000 Pieces per Month set/month
OKorder Service Pledge
Quality Product, Order Online Tracking, Timely Delivery
OKorder Financial Service
Credit Rating, Credit Services, Credit Purchasing
You Might Also Like
Modern Chromed Table Base
Item no.:JB-B335
1)Product with special surface treatment
2)Table base has a outer shrink film
Type: Table base JB-B335
Specific use; Table support
General use: Table base&other furniture's legs
Color: Optional
Advantage:good quality&best price&professional production
Table legs advantage:
1,Products with special surface treatment,prevent scratching and antirust.
2,Our products with high hardness and good quality.
- Q:How do I build a workbench in my world?
- Press e put up, a wood has 4 boards, each grid put a table, workbench, left key put the articles according to the book put, new look and numberSeek acceptance as a satisfactory answer.
- Q:Who knows how to connect the NC rotary table to the CNC system? Is the main control signal line sensor and a pneumatic valve power supply line (I use the pneumatic clamping), can provide the copy of the relevant instructions?
- Don't you have an electrical wiring diagram? No machine is different
- Q:In the hotel, a table called the cooker, the cooker is what to do with it?
- I didn't do anything at the Grand Hotel, either. But I guess that is machining or good fried vegetables or pasta and other vegetables cooked pasta products through this platform to the front desk clerk hands Oh just a guess, please forgive because my work is in a stage that is fried dumplings chaos well after a press the bell before the station attendant put the dishes away to the front office the guests there on the table, do not know whether this means, if the wrong answers do not joke, ha ha
- Q:My world computer how to do the workbench?
- 4 pieces of wood are needed to make the work table. (the kinds of boards are not limited, and 4 can be gathered together.)Then press the E button, open the backpack, in the upper right corner of the form, put four boards in the "synthetic" under the box, click on the table icon appears on the right, you can get a new workbench.As shown in the following figure:
- Q:I want to install the cylinder on the rotary table. I want to use pneumatic rotary joint to solve the problem of trachea winding. Can you tell me if the rotary joint is connected to the cylinder or what?
- Not connected to the cylinder. It is attached to the rotating part
- Q:I used the Z axis is on the workpiece surface, and to the factory processing center, why always on the workbench, I do not understand, please master detailed instructions on its tool steps and intentions, high marks ~ ~ ~!
- When programming, the base plane is the workbenchThe aim of the tool setting is to determine the position of the origin of the program in the coordinate system of the machine tool. The tool point can be located on the part, on the jig or on the machine tool. When the tool is set, the tool point should be coincident with the cutter location. The trial cutting method is the most widely used tool setting method in practice.
- Q:Leze three coordinate table adjustment when the air bearing vibration to solve
- 1, the air source is not clean2, the platform has dust3, the pressure value is less than 0.2Mpa4, air bearing bearing scratches or blowhole obstruction5, ball screw failure
- Q:CNC machine tools work surface milling a hole, do you know what method to repair it?
- Upstairs, the method is 100 percent feasible ah.1. change the workbench2. milling the entire table may require technical guidance from the manufacturer
- Q:Bed electrical control technology, as shown in the diagram, ask: if the work station to run at both ends, want to stay for 10 seconds, how to control the design of the circuit?
- Look, your question has hung over here for a long timeNot everyone is not willing to answer your question, but it is troublesome to draw a circuit diagramMoreover, each person to draw a circuit diagram has its own style, to you, you may not understandI suggest you get yourself some small contacts and time relays, and do it yourselfThis kind of knowledge above the textbook can only be realized through practiceHa ha, if I draw the drawings, it is estimated that you do not understandSince I did not learn it in school, I learned it in practice, so it was not standard to draw a circuit diagram
- Q:Today in the car sprinkled some toilet water accidentally spilled the table aboveNow get a piece of white cloth is out to doPlease give me a support, thank you!
- It can be cleaned with foam cleaners that are specially used for car washing.1. Spray the foam cleaner onto the dirt on the work table,;2. Clean with a soft plastic brush at the back of the bottle cap;3. Use a clean cloth to remove the foam residue and dirt.
As our company grows, our company adds more production lines, and mainly produces characteristic leisure home sofas, bookcases, lovers' seats, hotel chairs, etc. Meanwhile, we also produce some outdoor folded/unfolded dining tables & chairs to meet customers' needs. we are willing to put you in our heart and advance with you hand in hand.
1. Manufacturer Overview |
|
---|---|
Location | Guangdong, China |
Year Established | 2011 |
Annual Output Value | US$2.5 Million - US$5 Million |
Main Markets | North America South America Eastern Europe Southeast Asia Africa Oceania Mid East Eastern Asia Western Europe Central America Northern Europe Southern Europe South Asia Domestic Market |
Company Certifications | ISO 9001:2000 |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | shenzhen |
Export Percentage | 81% - 90% |
No.of Employees in Trade Department | 3-5 People |
Language Spoken: | English, Chinese |
b)Factory Information | |
Factory Size: | 10,000-30,000 square meters |
No. of Production Lines | 2 |
Contract Manufacturing | OEM Service Offered Design Service Offered Buyer Label Offered |
Product Price Range | Average |
Send your message to us
Modern Chromed Table Base
- Loading Port:
- China Main Port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 100 Pieces set
- Supply Capability:
- 3000 Pieces per Month set/month
OKorder Service Pledge
Quality Product, Order Online Tracking, Timely Delivery
OKorder Financial Service
Credit Rating, Credit Services, Credit Purchasing
Similar products
Hot products
Hot Searches
Related keywords