Lorry Loading Crane Truck Hiab Remoto Control Crane
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 20 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Quick Details
Feature: Truck Crane
Application: construction building/factory lifting/transport/ship yard
Rated Loading Capacity: 14000kgs
Rated Lifting Moment: 35t.m
Max. Lifting Load: 14000kgs
Max. Lifting Height: 18m
Span: 6m
Place of Origin: China (Mainland)
- Model Number: SQ1404
Certification: TX/CCC
Warranty: one year
color: red/yellow/white/blue
Packaging & Delivery
Packaging Details: | neutral packing/container ship /ro-ro ship |
---|---|
Delivery Detail: | 5-15days |
Specifications
1,Operating by Control Remoto
2,The origin, quality assurance
3,High quality after sale service
4,Professional
Main Specification For Crane14 TON
Max.Flow of Hydraulic System | 80 L/min | Rated Pressure of Hydraulic System | 23 Mpa |
Max.Lifting Capacity | 14 T | Max.Lifting Moment | 35 T.M |
Max.Working Radius | 15 M | Max.Lifting Height | 18(m) |
Derricking Scope | 1-76 ° | Slewing Angle | 360°continuous |
Number of Booms | 4 Sections | Outrigger Span | 6 (m) |
Oil Tank Capacity | 200 L | Installation Space | 1300 mm |
Technical Parameter of Dongfeng Brand DFD5251JSQ Truck mounted Crane
VEHICLE BRAND | DONGFENG | VEHICLE NAME | TRUCK MOUNTED CRANE |
VEHICLE MODEL | DFD5251JSQ | VEHICLE MANUFACTURER | DONGFENG MOTOR CO.,LTD |
ENGINE MODEL | B190 33,B210 33 | ENGINE MANUFACTURER | CUMMINS |
DISPLACEMENT | 5900,5900 | POWER | 140,155 |
OVERALL SIZE(MM) | 11950×2490×3800 | INNER(MM) | 8300,8500,7500×2294×550 |
TOTAL MASS(Kg) | 24900 | FRONT PASSENGER | 3 |
CURB WEIGHT(kg) | 12200,11800 | RATED LOAD(kg) | 12505,12905 |
APPROACH/ DEPARTURE | 34/11,34/12 | FRONT/REAR SUSPENSION | 1250/3500,1250/3150 |
AXLE BASE(mm) | 2150+5050 | AXLE LOAD | 6850/6850/11200 |
AXLE NO. | 3 | SPRING NO. | 10/10/12+9 |
TIRE NO. | 8 | TIRE MODEL | 10.00R20 |
FRONT WHEEL BASE | 1940/1940 | REAL WHEEL BASE | 1860 |
STEERING MODE | STEERING WHEEL | MAX.TRAVEL SPEED | 90 |
ID | LGHXLG3X××××××××× | STANDARD | GB3847-2005,GB17691-2005 CHINAⅢ |
CHASSIS MODEL | DFD1250GJ3 |
- Q: The cost of machinery which makes an energy from wind...?
- P.S. TO ALL THE FOLKS CONCIDERING ANSWERING THIS QUESTION. Sometimes you shouldn't answer questions! This is an Email I recieved from the person moments after I posted this: From: Big_Man! Subject: Turbines Message: Thank you very much. I want buy big tubines that i can sell energy to my country. i have finance. i will be glad if send me the price list if you know, and also it;s powers. As i know 2000 kW is cost about $2 mil. is that true? **************************************... Below is my original post: Are you talking about a COMMERCIAL wind turbine....the ones that generate power by the megawatt? The G.E. model costs $2 million dollars installed. If you are talking household ones, you can get one that might run a single lightbulb for about $200. For a system that actually powers your house, your probably looking at around $6000-$15,000, depending on the amount of power you need to generate for your house. ~Garnet Homesteading/Farming over 20 years
- Q: What is difference between machine and machinery?Because I'm learning Accounting Principles for A Levels, and under the heading of 'Fixed Assets', machine and machinery are two different examples.
- At its simplest, a machine is an invention that does a job better and faster and more powerfully than a human being. Despite being man-made we’ve come to think of the word machine as the very opposite of human. The Machine Age we live in is considered impersonal and overwhelming, and anything machine-like is often considered soulless or even dangerous. (Witness the countless fantasies of robots taking over the world.) Human beings working together, like the cogs of a machine, can become more powerful than a single person. That's why sports teams or political organizations are often described as well-oiled machines. Machinery means a number machines or machine systems collectively.
- Q: a manager has to make a choice in whether to have specialized machinery needing fewer workers or general machinery requiring more workers to operate it effectively.
- A manager should choose the lowest cost long term production/operating method as long as all other selection requirements are met.
- Q: humanity have acknowledge all inventions from lighter to x-rays and to infrared, and to ultraviolet rays,electromagnetic propulsions and space travel -seems to provide great assistance to humanity-yet, cancer, AIDS, parkinsons,alzhimers have no cure at all??,global warming,wars etc.. so is science missing A LOT from REALITY??
- At one time, humanity is on the verge of stepping into the stars, and also at its knees to its own destructive desires. But, that is humanity for you. It mocks man (woman) itself.
- Q: I want to realize this company.
- Good company is a joy to realize.
- Q: Where do I find out the price of used machinery such as CNC mills, lathes, QVAC roller, Haas indexing head, etc...I am trying to purchase a small parts manufacturing business and I need to know how much would those machines cost now.ThanksZ
- You would need to contact a special assets appraiser in order for you to find out the cost of each machine.
- Q: I got my wisdom teeth (all 4) cut out this weekend and am still on loritabs every 4-6 hours for pain. Today is supposed to be the last day of my two weeks notice ( I am switching jobs next week ) But I'm on pain pills and shouldn't be opperating factory machinery which is what I do. Would it be bad for me to call in on my last day? I still have to go in Wednesday to get my paycheck but right now I can't even drive much less operate complictaed machinery. If I called in would that make me look bad? My employer knows I got my wisdom teeth cut out this weekend.
- Since your employer knows you had the surgery, you can bring it a note if it really matters. What I would do, if possible, is try to find a replacement so that they won't be left shorthanded, that way the employer knows you at least tried. If you were a good employee the whole time you worked there, then not coming on the last day (for a legitimate and verifiable reason) shouldn't be an issue.
- Q: I'm assuming I'll need to remove the back fence. But I'm trying to determine whether I'll need to also remove a couple trees as well. Anyone have a rough idea of how much space pool machinery is going to need?
- if there is enough room for a bobcat that should do it
- Q: Bally Manufacturing sent Intel Corporation an invoice for machinery with a $20,000 list price. Bally dated the invoice July 23 with 2/10 EOM terms. Intel receives a 40% trade discount. Intel pays the invoice on August 5.
- Yeah, so what's the question really? (You don't really state what you want answered). But anyways, Intel missed the 10 day discount period on the payment terms, so they can't take that. ------------------------ It's also hard to tell if the trade discount is already included in the invoice amount (which it should be).
- Q: What are the core technologies involved in the core components of construction machinery?
- First of all, the use of conditions, technical parameters, after the design drawings, materials selection, casting, and other, and then conduct a formal test, determine the work parameters, etc., the problem is too large, not too good to say. Specific point just fine.
Send your message to us
Lorry Loading Crane Truck Hiab Remoto Control Crane
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 20 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords