• Lorry Loading Crane Truck Hiab Remoto Control Crane System 1
  • Lorry Loading Crane Truck Hiab Remoto Control Crane System 2
Lorry Loading Crane Truck Hiab Remoto Control Crane

Lorry Loading Crane Truck Hiab Remoto Control Crane

Ref Price:
get latest price
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
20 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

 

Quick Details

  • Feature: Truck Crane

  • Application: construction building/factory lifting/transport/ship yard

  • Rated Loading Capacity: 14000kgs

  • Rated Lifting Moment: 35t.m

  • Max. Lifting Load: 14000kgs

  • Max. Lifting Height: 18m

  • Span: 6m

  • Place of Origin: China (Mainland)

  • Model Number: SQ1404
  • Certification: TX/CCC

  • Warranty: one year

  • color: red/yellow/white/blue

Packaging & Delivery

Packaging Details:neutral packing/container ship /ro-ro ship
Delivery Detail:5-15days

Specifications

1,Operating by Control Remoto
2,The origin, quality assurance
3,High quality after sale service
4,Professional

Main Specification For Crane14 TON

Max.Flow of Hydraulic System

80 L/min

Rated Pressure of Hydraulic System

23 Mpa

Max.Lifting Capacity

14 T

Max.Lifting Moment

35 T.M

Max.Working Radius

15 M

Max.Lifting Height

18(m)

Derricking Scope

1-76 °

Slewing Angle

360°continuous

Number of Booms

Sections

Outrigger Span

(m)

Oil Tank Capacity

200 L

Installation Space

1300 mm

 

Technical Parameter of Dongfeng Brand DFD5251JSQ Truck mounted Crane

VEHICLE BRAND

DONGFENG

VEHICLE NAME

TRUCK MOUNTED CRANE

VEHICLE MODEL

DFD5251JSQ

VEHICLE 

MANUFACTURER

DONGFENG MOTOR CO.,LTD

ENGINE MODEL

B190 33,B210 33

ENGINE 

MANUFACTURER

CUMMINS

DISPLACEMENT

5900,5900

POWER

140,155

OVERALL SIZE(MM)

11950×2490×3800

INNER(MM)

8300,8500,7500×2294×550

TOTAL MASS(Kg)

24900

FRONT PASSENGER

3

CURB WEIGHT(kg)

12200,11800

RATED LOAD(kg)

12505,12905

APPROACH/

DEPARTURE

34/11,34/12

FRONT/REAR 

SUSPENSION

1250/3500,1250/3150

AXLE BASE(mm)

2150+5050

AXLE LOAD

6850/6850/11200

AXLE NO.

3

SPRING NO.

10/10/12+9

TIRE NO.

8

TIRE MODEL

10.00R20

FRONT WHEEL BASE

1940/1940

REAL WHEEL BASE

1860

STEERING MODE

STEERING WHEEL

MAX.TRAVEL 

SPEED

90

ID

LGHXLG3X×××××××××

STANDARD

GB3847-2005,GB17691-2005 CHINAⅢ

CHASSIS MODEL

DFD1250GJ3

Q: The cost of machinery which makes an energy from wind...?
P.S. TO ALL THE FOLKS CONCIDERING ANSWERING THIS QUESTION. Sometimes you shouldn't answer questions! This is an Email I recieved from the person moments after I posted this: From: Big_Man! Subject: Turbines Message: Thank you very much. I want buy big tubines that i can sell energy to my country. i have finance. i will be glad if send me the price list if you know, and also it;s powers. As i know 2000 kW is cost about $2 mil. is that true? **************************************... Below is my original post: Are you talking about a COMMERCIAL wind turbine....the ones that generate power by the megawatt? The G.E. model costs $2 million dollars installed. If you are talking household ones, you can get one that might run a single lightbulb for about $200. For a system that actually powers your house, your probably looking at around $6000-$15,000, depending on the amount of power you need to generate for your house. ~Garnet Homesteading/Farming over 20 years
Q: What is difference between machine and machinery?Because I'm learning Accounting Principles for A Levels, and under the heading of 'Fixed Assets', machine and machinery are two different examples.
At its simplest, a machine is an invention that does a job better and faster and more powerfully than a human being. Despite being man-made we’ve come to think of the word machine as the very opposite of human. The Machine Age we live in is considered impersonal and overwhelming, and anything machine-like is often considered soulless or even dangerous. (Witness the countless fantasies of robots taking over the world.) Human beings working together, like the cogs of a machine, can become more powerful than a single person. That's why sports teams or political organizations are often described as well-oiled machines. Machinery means a number machines or machine systems collectively.
Q: a manager has to make a choice in whether to have specialized machinery needing fewer workers or general machinery requiring more workers to operate it effectively.
A manager should choose the lowest cost long term production/operating method as long as all other selection requirements are met.
Q: humanity have acknowledge all inventions from lighter to x-rays and to infrared, and to ultraviolet rays,electromagnetic propulsions and space travel -seems to provide great assistance to humanity-yet, cancer, AIDS, parkinsons,alzhimers have no cure at all??,global warming,wars etc.. so is science missing A LOT from REALITY??
At one time, humanity is on the verge of stepping into the stars, and also at its knees to its own destructive desires. But, that is humanity for you. It mocks man (woman) itself.
Q: I want to realize this company.
Good company is a joy to realize.
Q: Where do I find out the price of used machinery such as CNC mills, lathes, QVAC roller, Haas indexing head, etc...I am trying to purchase a small parts manufacturing business and I need to know how much would those machines cost now.ThanksZ
You would need to contact a special assets appraiser in order for you to find out the cost of each machine.
Q: I got my wisdom teeth (all 4) cut out this weekend and am still on loritabs every 4-6 hours for pain. Today is supposed to be the last day of my two weeks notice ( I am switching jobs next week ) But I'm on pain pills and shouldn't be opperating factory machinery which is what I do. Would it be bad for me to call in on my last day? I still have to go in Wednesday to get my paycheck but right now I can't even drive much less operate complictaed machinery. If I called in would that make me look bad? My employer knows I got my wisdom teeth cut out this weekend.
Since your employer knows you had the surgery, you can bring it a note if it really matters. What I would do, if possible, is try to find a replacement so that they won't be left shorthanded, that way the employer knows you at least tried. If you were a good employee the whole time you worked there, then not coming on the last day (for a legitimate and verifiable reason) shouldn't be an issue.
Q: I'm assuming I'll need to remove the back fence. But I'm trying to determine whether I'll need to also remove a couple trees as well. Anyone have a rough idea of how much space pool machinery is going to need?
if there is enough room for a bobcat that should do it
Q: Bally Manufacturing sent Intel Corporation an invoice for machinery with a $20,000 list price. Bally dated the invoice July 23 with 2/10 EOM terms. Intel receives a 40% trade discount. Intel pays the invoice on August 5.
Yeah, so what's the question really? (You don't really state what you want answered). But anyways, Intel missed the 10 day discount period on the payment terms, so they can't take that. ------------------------ It's also hard to tell if the trade discount is already included in the invoice amount (which it should be).
Q: What are the core technologies involved in the core components of construction machinery?
First of all, the use of conditions, technical parameters, after the design drawings, materials selection, casting, and other, and then conduct a formal test, determine the work parameters, etc., the problem is too large, not too good to say. Specific point just fine.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords