• HZS180 Concrete Batching Plant / ISO & CE System 1
  • HZS180 Concrete Batching Plant / ISO & CE System 2
HZS180 Concrete Batching Plant / ISO & CE

HZS180 Concrete Batching Plant / ISO & CE

Ref Price:
get latest price
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
5 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

The product is widely used in key projects like various highways, railroads, high-speed railways, airports, ports, bridges, and hydropower stations, as well as commercial concrete mixing station, real estate, and municipal construction. With constantly increasing investment in technological innovation, the company has achieved great achievements and been recognized as “Provincial Enterprise Technology Center” in 2008. The company has 4 research department respectively specializing in mixing, transportation, conveying, and automation.


Concrete mixing plant HLS180

Theoretical productivity  180m3/h

Mixer model       JS3000

Mixer nomination capacity    3000L

Mixing largest aggregate       100mm

Mixing motor power 2x55kw

Aggregate lifting belt motor power    45kw

Aggregate conveying belt width  1000mm

Aggregate lifting belt conveying capacity 800t/h

Aggregate batcher    PL4800

Aggregate bin capacity   4x25m3

Aggregate batching capacity 4800L

Aggregate types 4

Aggregate measuring precision   ±2%

Powder measuring precision ±1%

Water measuring precision    ±1%

Additive measuring precision       ±1%


Q: What is the concept of on-site concrete mixer station
The concrete mixing station is at the construction site to set up a soil mixing concrete equipment, including automatic conveying equipment, measuring equipment, concrete mixing equipment, cement storage warehouse etc.
Q: How long does it take to build a concrete mixer station?
Normally, between one and three weeks. Plan the main points of the stirring station Venue: single 2m3, 3m3, the equipment occupies an area of about 21mx51m. Add in the yard, parking lot, road, office building, repair shop, recycling pool and so on, usually need the site 40mx80m (the land of 5 acres). 2m3 and 3m3 stations usually require 60mx80m (7.5 acres). If the location is more complex, the layout of the equipment should be based on the utilization of the site. To reduce the cost of future operations, it is suggested that there be a river at the edge of the site so that it can be used to carry sand stones. Distance should consider the best range of concrete delivery vehicles, not too far away from the main site, but also for future development. Optional: choose according to the expected amount of concrete. In a year of 300 working days, eight hours a day, the actual efficiency is lower than the nominal value given the various factors that are affected. Considering the requirement of the equipment for regular maintenance and maintenance, and the requirement of the high demand in some period, it is suggested that the equipment should be purchased. In some areas, the construction of new concrete and concrete stations must be at least two.
Q: What are the ingredients for the concrete mixing stations?
It is the raw materials for the concrete mixers, the sand, stone, cement, fly ash, mineral powder, various admixtures, water, basically these seven raw materials.
Q: Classification of concrete mixing stations
There is the distinction between level 1, level 2, level 3. Because some projects, especially the project of the state, are required to provide the units of concrete, and the quality is low because of the low quality. There is a clear list of bids in general.
Q: What are the facilities of the concrete mixing station
The concrete mixing station consists mainly of five major systems, such as mixing main, material conveying system, material weighing system, material storage system and control system
Q: How much concrete is produced by the js1000 type of the concrete mixing station
According to the national standard, 1 cubic host is the JS1000, the general theoretical productivity of the standard test concrete is not less than 50 cubic meters per hour. But the actual situation is fully automatic, normally can be above 40 cubic meters. The cement productivity would be low by hand.
Q: What is the special work of the concrete mixing station
The ratio of the concrete particles to the surface area, the shape of particles, the density of the particles and the grading of the particles, etc., are very important to the liquidity of the slurry. Smaller than surface area, the particle shape is closer to the ball, bigger, more filling and more liquid. By optimizing these factors, you can obtain the most appropriate liquidity. In order to design the concrete mix according to the engineering requirement, the characteristics of the aggregate material must be mastered first. The properties of aggregates are determined by factors such as microstructure, prior exposure and processing, and these factors influence the properties of fresh and hardened concrete. The effect of aggregate properties on concrete performance should be considered, and the quality of concrete mixing equipment should be considered. Before installation, check the appearance quality of the equipment again, the platform bolts are not loose, the welding seam is not cracked, the oil leak, the water, the ash (the lump), etc. Clean the assembly of the whole machine and re-spray paint, rust and renovate. Prepare the all kinds of bolts, welding wire, iron plate, etc., to prepare tools and protective equipment, the use of more tools for several sets of parts can use pneumatic wrench, and provide timely acetylene cutting, electric welding equipment; Plan the entry time of the crane.
Q: Concrete mixstations belong to no special equipment
Special equipment is referred for life safety, greater danger of boilers, pressure vessels (including gas cylinders, hereinafter the same), pressure pipes, elevators, lifting machinery, passenger ropeway, large-scale amusement facilities. The boiler, pressure vessel (air bottle), pressure vessel is the pressure type special equipment; Elevator, hoisting machinery, passenger rope and large amusement facilities are special equipment for mechanical and electrical equipment.
Q: Which staff does the concrete mixing station need?
Mainly depends on how big is your station, whether can fully staffed, mainly included: general manager, deputy general manager, technology, webmaster, laboratory (deputy) director of the general, the production manager, sales managers, salespeople, scheduling, lab team leader, the operator (inspection), quality inspection, proportioning design, the material inspector technicians, machine operators, resposible, site, monitor of overhaul, maintenance engineer, loadometer, finance, cashier, mixers, pump truck drivers, company drivers, forklift driver, the handyman, chef, etc These are the main people who want to help you.
Q: The mixing time of the concrete mixer is in which standard
The quality control standard gb50164-2011 should not be produced for 40 seconds in the winter of 30 seconds

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords