• Hydraulic Jack Hammer GB-T200 Hot Selling System 1
  • Hydraulic Jack Hammer GB-T200 Hot Selling System 2
Hydraulic Jack Hammer GB-T200 Hot Selling

Hydraulic Jack Hammer GB-T200 Hot Selling

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
1 pc
Supply Capability:
200 pc/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Hydraulic Jack Hammer GB-T200 Hot Selling

We are a manufacturer specialized in the hydraulic breaker with superior quality, We also supply other concerned hydraulic spare parts including main body assembly, the back head, cylinder assembly, front head, piston, reversing valve, oil seal retainer and etc. Our products can be used for Komatsu, Hitachi, Kobelco, Kato, Sumitomo, Hyundai, Volvo excavator, etc.

 

Advantage:

(1) Use the highest strength material to get better wearing resistance.

(2) Easy maintenance, prolonged life.

(3) We have accumulated sales of 20, 000 units, rich maintenance experience.

(4) The warranty period is 1 year.

 

Description:

Hydraulic rock breaker is powered by an excavator or loader pump provides pressure oil, it can dig a fundamental role in building a more efficient clean up floating rock crevice in the rocks and soil. Optional hydraulic hammer excavator model is based on the principle of the operating environment to choose the most suitable hydraulic rock breaker

Hydraulic breaker has become an important tool for the job, it was installed in the hydraulic breaker backhoe loaders (also known as two busy) or wheel loader for crushing operations. Excavator Hydraulic Breaker, also known as hydraulic breaker or hydraulic rock breaker (Excavator Hydraulic Breaker).

 

 Specification:

Exvacator breaker technical paramaters

TRB680

TRB850

TRB1000

TRB1350

TRB1400

TRB1550

TRB1650

TRB1750

Weight
(kg)

258

557

753

1653

1774

2569

2752

3912

Length
(mm)

1415

1735

1994

2367

2414

2760

2816

3176

Required oil Flow
(L/min)

40~70

60~100

80~110

120~150

130~1800

180~240

200~260

210~290

Working pressure
(kgf/cm2)

110~140

130~1640

150~170

160~180

160~180

160~180

160~180

160~180

impact rate

500~900

400~800

350~700

400~800

350~500

300~450

250~400

200~350

Hose Diameter
(In)

0.5

0.75

0.75

1

1

1

1.2

1.2

Chisel Diameter (mm)

68

85

100

135

140

155

165

175

Chisel Length
(mm)

700

900

1000

1300

1300

1500

1600

1600

Applicate Exvacator
(Ton)

4~7

7~14

10~15

18~26

18~26

28~35

30~45

40~55

 

Hydraulic Jack Hammer GB-T200 Hot Selling

 

Company profile:

(CNBM International) is the most important trading platform of CNBM Group Corporation, a state-owned company under the direct supervision of State-owned Assets Supervision and Administration Commission of the State Council.With the advantages in Cement, Composite Materials, New Building Materials and Engineering, We are enlarging sub-brand. Currently, we have wholly-owned overseas subsidiaries and branches in 5 countries with a view to realize localization. Meanwhile, we have established strategic partnerships with hundreds of domestic manufacturers and sound business relations with clients from over 120 countries. In line with the business, CNBM International launched E-business platform Okorder.com. It conformed the best resource and logistics to meet the customers’ request  with 24 hours full-time service.

 

FAQ:

1. Q: Can I get some professional suggestion?

A: Sure, we have professional engineer. Any question will be solved.

2. Q: Do you have the products in stock?

A : Yes , We have several models now could supply to you.

3. Q: What's the delivery time?

A: It usually takes about 25 days to produce an order. But the exact delivery time might be different for different orders or at different time.

4. Q: How does your factory do regarding quality control?

A: Quality is priority.  Workers always attach great importance to quality control from the every beginning to the end of the production. Every product will be fully assembled and carefully tested at important moment.

5. Q: Will you deliver the right goods as ordered? How can I trust you?

A: Yes, we will. Our company is world top 500, that is the biggest supplier and manufacture in China, having a good reputation around the world.


 

Q:How do I make cacao butter using raw beans and no machinery?
Did okorder / . This is able to extremely manage one and all!
Q:. He asks you to over-invoice your exports. He says he is trying to build a nest egg outside his country. He requests that you deposit the excess amount he will pay you under your invoice to his bank account in Switzerland. What are the issues here? What will you do?
The issue is that he is asking you to deposit excess amounts to his bank account IN SWITZERLAND.
Q:About the marketing strategy of construction machinery industry
The art of war said, "those who do not seek the overall situation, can not seek a domain, do not seek a domain, can not seek the overall situation", and emphasizes the importance of the thoroughness of strategic activities. The thoroughness of marketing planning mainly comes from the detailed knowledge of the market, the ability of insight into the market and the rich planning experience. The action plan should be practical, operational and flexible
Q:Okay, so I'm looking through my bio textbook (not ap) and I come across this graphic about the HIV virus. There's a strip of text that talks about how the virus replicates itself:HIV is equipped with the enzyme reverse transcriptase.........Using the cell's **gene translation machinery**, this DNA then directs the production of thousands of viruses.The thing inside the **s . What is it? Cells don't have machinery! Why does the book call it translation machinery?
It's talking about the complement of proteins used to copy the DNA and produce new viruses that are hijacked by the virus. Proteins are like little machines. They're the molecules that do everything in the cell.
Q:Suppose that a piston is moving straight up and down and that its position at time t seconds iss = Acos(2πbt)with A and b positive. The value of A is the amplitude of the motion and b is the frequency(the number of times the piston moves up and down each second). What effect does doubling the frequency have on the piston's velocity and jerk?Follow up question, why does machinery break when you run it too fast?
Q1 === If you double the frequency, this means that you are doubling the number of times that the cylinder goes up, hits it's highest point, turns around and comes back down again in a second. You must be doubling the distance the piston travels. The time is one second, so effectively you are doubling the speed. Q2 === Jerk in this sense is one of those wonderful descriptive words that works in the real world, but is hard to put into a formula. I wonder if you have to do that. Certainly the force increases because the turn around time is much smaller when the frequency is doubled. That means time in this formula F = m*(vf - vi)/t is much smaller and that makes the force larger. Q3 == So machinery must break down because the force on moving the piston up and down has become much larger.
Q:Cost of construction machinery use fee
Because labor costs, material costs, construction machinery use fee called "basic direct fee", plus "other direct costs" is the direct costs of the project, for example: "the basic direct fee is 1 million yuan, other direct costs" rate of 6%, then the "other direct costs" amount is 60 thousand yuan, direct project fee is equal to 1 million 60 thousand yuan. (similar to this name is in the professional quota appears, water conservancy quota, highway quota is so called name; general construction, especially civil engineering are in accordance with your statement)
Q:What is difference between machine and machinery?Because I'm learning Accounting Principles for A Levels, and under the heading of 'Fixed Assets', machine and machinery are two different examples.
Machine And Machinery
Q:What are the total cost of the project?
The general construction cost includes (1) the cost of construction and installation, that is, the construction and construction costs. (2) purchase fees for equipment, equipment and equipment, such as elevators installed on the installation, transformers, industrial boilers and other equipment, depending on the nature of the project.
Q:I have recently sprayed an small plot of land. The grass has burned off but has not been dug up yet. I'm not sure what machinery i should use to dig the plot. P.S. The plot is small but is too big for me to dig myself.Machinery like tillers, rotivators e.t.c.
Hello I'm new at this and I really an not sure what I am going to suggest will even work. Do you think a tiller will work? Or maybe one of those tractor things with the scoop on the front? My brother came through over with one and went through my overgrown wooded area to make a beautiful path for me to be able to use for walks. I was able to walk around that trail same day! He was able to take out the vegetation close to the ground too. The ground was rough and muddy when he was done but I don't think there's a way to prevent rough ground when digging. Chances are you will be able to get out there with a shovel afterwards to break things up or like me turn the grass upside down to die. If you rent one it shouldn't cost too much. It's also fun to work with those thing. Is it your plan to replant? Do you add any manure and compost to your ground. I've sprayed and then cut grass short before when I wanted to make a garden. I created raised beds by putting the manure compost, topsoil and pearlite on top of the dead grass. A few longer blades stuck out but they were very dead. I grew my best garden ever that year! Plus it was so easy. I was very pleasantly surprised by the result! I can't promise it will work as well for you though. That's all I can think of though. Thank you for taking the time to read my answer. Jeannie
Q:First one to figure out this punch line (it's easy) gets 10 points.
become a monacal of himself or somthing?

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords